Loading…
Loading…
2,185 results • Best match
Package No AP26PVTLSB002 Construction of High Level Bridge on road from Bungaput PR road to Ubbengula Monjaguda of Munchingiputtu Mandal of ASR District, Est.Cost Rs.375.79 Lakhs Rs.9.38 Lakhs for Routine Maintenance.
Package.No.AP26PVTLSB006 Construction of High Level Bridge on road from PA R and B Road at Chaparai to Kosangi of Dumbriguda Mandal of ASR District Est.Cost Rs.359.73 Lakhs Mtc.Cost. Rs.9.00 Lakhs
Package No.AP26PVTLSB009 Construction of High Level Bridge on road from PR Road to Sarigaguda via Jadiguda at 2/640Km in Pedabayalu Mandal of ASR District Est.Cost Rs.384.05 Lakhs Mt.Cost.Rs.9.60Lakhs
FABRICATION AND ERECTION OF NEW IRON FOOT BRIDGE TO Q LINES AT UP HILL DURING DASARA - 2019
Completion of Incomplete Foot Bridge on Fullava Drain at Pallewada village Leading to Doddipatla of Kaikaluru Mandal
Construction of BT Road from Urban Bank Road to Foot Bridge in 21st ward in Bhimavaram Municipality
Construction of foot bridge at D No. 6-454 in Sriharinagar in ward no. 02 (3rd Call).
Providing foot bridge to the children park at Children park at Chinna waltair in ward No.18.
Completion of Incomplete Foot Bridge on Fullava Drain at Pallewada village Leading to Doddipatla of Kaikaluru Mandal
Construction of foot Bridge on west side channel at KM 24.500 near Nandivelugu village of Tenali Mandal
Construction of CC Drain near foot bridge (D.No.8-5-16/3) in Pantakalava in 7th Division.
Repairs to UT at Km 150.400 to arrest leakages and repairs to foot bridge of RB LLC
Repairs to UT at Km 150.400 to arrest leakages and repairs to foot bridge of RB LLC
Construction of Intake well cum Pump House along with Foot bridge in SS Tank, MIH Kopparthy, Kadapa.
Package No AP26PVTLSB008 Construction of High Level Bridge on road from Landulu to Bongujangi at 1 by 685 Km Pedabayalu Mandal of ASR District Est.Cost Rs.442.33 Lakhs Rt Mtc. Rs.11.06Lakhs 3rd call
Vijayawada Division -Vijayawada(BZA)-Kondapalli(KI)section -Proposed Construction of Road under bridge (RUB) in Lieu of LC No.140 at Rly.Km.569/31-33 Between Rayanapadu and Kondapalli Stations. RUB with RCC Box Size of 1 x 6.0m x 4.80m (Box Air- Pushing Method) and Retaining Wall (on Kondapalli and Elaprolu side). IRPSM ID.11.06.30.20.1.55.003. Year 2020-21.
Conducting sub soil exploration and soil testing for construction of high level bridge over Pageru Vagu at Km 12.200 to 13.000 of Khajipeta . Kamalapuram Road in YSR District
SUB-SOIL EXPLORATION FOR CONSTRUCTION OF HIGH LEVEL BRIDGE ACROSS UPPUKALUVA AT KM 7/2-4 OF VENKATACHALAM - MUTHUKUR ROAD TO THIRUMALLAMMA PALEM ROAD IN SPSR NELLORE DISTRICT
Construction of High level Bridge across river Nagavali between Poornapadu and Labesu in Komarada mandal of Parvathipuram Manyam Dist.(PART B-Balance work), Est. Cost Rs.525.00 Lakhs.
Construction of High level Bridge across river Nagavali between Poornapadu and Labesu in Komarada mandal of Parvathipuram Manyam Dist.(PART B-Balance work), Est. Cost Rs.736.77 Lakhs.
Construction of High level Bridge across river Nagavali between Poornapadu and Labesu in Komarada mandal of Parvathipuram Manyam Dist.(PART B-Balance work), Est. Cost Rs.525.00 Lakhs.
Conducting Survey, Investigation, Sub Soil Exploration soil testing for construction of high Level Bridge (HLB) at km 14/10 of Kalikiri-Sadum Road (via) Palamanda in Chittoor District
Conducting sub soil exploration and soil testing for construction of high level bridge over Pageru Vagu at Km 12.200 to 13.000 of Khajipeta . Kamalapuram Road in YSR District
Construction of High level Bridge across river Nagavali between Poornapadu and Labesu in Komarada mandal of Parvathipuram Manyam Dist.(PART B-Balance work), Est. Cost Rs.525.00 Lakhs.
Construction of High level bridge on tributary of river Krishna from Thotlavalluru to Pamulalanka of Thotlavalluru mandal of Pamarru Constituency in Krishna District, Estimate Cost: Rs.3155.00 Lakhs
Investigation, Design and Construction of High Level Bridge across Gogullanka branch of Vrudha Gouthami river at km 1/10 of Guttinedeevi to Bhyravalanka road in East Godavari District
Construction of High level Bridge across river Nagavali between Poornapadu and Labesu in Komarada mandal of Parvathipuram Manyam Dist.(PART B-Balance work), Est. Cost Rs.736.77 Lakhs.
Providing Consultancy services for preparing DPR for construction of High Level Bridge across Eluru canal at Km.0/0 of Atkuru - Unguturu road in Krishna District (2nd Call)
Emergent Repairs to Old Steel Girder Bridge across river Vegavathi at Km.74/0-2 of Chilakapalem-Ramabhadrapuram-Rayagada Road(SH004) in Vizianagaram District.
SW I: Dharmavaram:-Provision of 6 no. of Escalators (Up & Down) for New 12m FOB. SW II: Dharmavaram: Provision of 3 no. of Lifts to New 12m FOB & 1 For Existing FOB
Custom Bid for Services - Schedule A Hiring of vehicle trucks of loading capacity four and half MT for Bridge repair and maintenance works for SSE Bridges North SSE Bridges Central for a period of 2 years 1 number, Custom Bid for Services - Schedule B Extra over Schedule A for every additional Km or part there of over 2000Km in a month
Construction of Major Bridge at KM 12 plus 475 Across Lajjabanda Drain at Jonnalavarimodi of Machilipatnam mandal
CONSTRUCTION OF HIGH LEVEL BRIDGE ACROSS BUCKINGHAM CANAL AT KM 2/2 OF JUVVALADINNE - ISKAPALLI ROAD NLMD 134 (BANGARUPALEM IN ALICHERLA - BANGARUPALEM VILLAGE) BOGOLE MANDAL IN SPSR NELLORE DISTRICT
Package No.AP6XILB02 - Const of High Level Bridge on the road from Unguturu to Khambhampadu at Km 1/0 to 1/2 in Pedakurapadu mandal, Est. Cost: Rs.491.39 Lakhs
Package No.AP6XILB02 - Const of High Level Bridge on the road from Unguturu to Khambhampadu at Km 1/0 to 1/2 in Pedakurapadu mandal, Est. Cost: Rs.491.39 Lakhs
Conducting Survey, Investigation, Sub Soil exploration, Soil testing and complete DPR for Construction of High Level Bridge (HLB) at km 16/10 of Burlapalli-T.Sadum road in Chittoor District
Package No AP26PVTLSB024 Construction of High Level Bridge at 5/250 km on Thurubongula to Kilumulu via Karakapalli Goppugudi in Chinthapalli Mandal of ASR District Est. Cost Rs. 339.41Lakhs Mtc. Cost Rs. 8.49 Lakhs
Construction of connecting foot bridge and under passage way at Chakali Gedda, Gavara Kancharapalem in Ward No.43.
Providing M.S grills, foot bridge barricading arrangements to Siphon at km 38.20 of YLM canal in Reach 1
Construction of Foot Bridge at Chakali gedda ( Beside APIIC road ) in W.No 50 of Gajuwaka Zone of GVMC.
Beautification south side Bund of KE canal from Old busstand bridge to foot bridge in Panduranga Theater road
Construction of SW CC Drain from back side of sairam colony to foot bridge in Ward No.16
Providing M.S grills, foot bridge barricading arrangements to Siphon at km 38.20 of YLM canal in Reach 1
Construction of Watch and ward room and providing foot bridge near Syphon at KM 46/240 of RBHLC.
2025-Eng04-29-127 Construction of Foot Bridge at Ootagedda in Ward No.29 of Zone-IV GVMC
Alcohol Based Hand Rub/Hand Sanitizer
Alcohol Based Hand Rub/Hand Sanitizer
Alcohol Based Hand Rub/Hand Sanitizer
Alcohol Based Hand Rub/Hand Sanitizer
Alcohol Based Hand Rub/Hand Sanitizer