Loading…
Loading…
1,096 results • Best match
L145-Sono Chakai PWD Road to Mohgain Bujhayat Road (VR86)Construction of 2nd HL RCC Bridge ove Barnar river in Sono Chakai PWD Road to Mohgain Bujhayat Road
1 Majgama Deeplal ke Ghar to ward no-10 Mahavir Asthan tak 2 Construction of RCC Bridge 7 x 18.75m span with Approach Road 227.97m. At ch- 480m.
Provision of solar powered with battery back up emergency lights for platforms and FOB at NSG1 to NSG4 stations over DNR Division.
Consultancy Services of Authority Engineer for construction of new major bridge over Baghmati and Lakhandei River along with approaches from design km. 16.500 to km. 21.500 on NH 527C in the State of Bihar on EPC mode
Bridge L 57.06 m
MRL04-T09 Baliyari More To Nadwan sharma Railway Gumti Via Gorhana, Kansara, Badroi, Gurpatichak, Nadwan. HL RCC Bridge on T09 Baliyari More To Nadwan Sharma Railway Gumti. Chainage 2.620km
Proposed High Level RCC Bridge Across Branch of Kamla River on Sugrain to Jinaura via Bhagmara, Navtoliya Road Under West KusheshawarSthan Block in the District of Darbhanga, Near BaghmasandNavtoliya
PROPOSED HIGH LEVEL RCC BRIDGE ACROSS REHUAA NALA ON ROAD PIPRA KOTHI TO SEMRA BAZAR IN PARSAUNI WAZID PANCHAYAT UNDER KALYANPUR BLOCK IN THE DISTRICT OF EAST CAMPARAN (BIHAR)
Part-A Kothiya Braham Sthan to Koilaman S.C. Tola Part-B Construction of RCC Bridge Span 3x24.75m in Between Kothiya Braham Sthan to Koilaman S.C Tola at Ch- 800m
Part A Chauni to Madarsa Tola Nikhra. Part B Construction of HL RCC Bridge in chauni to Madarsa Tola Nikhra with Approch Road 113.88 m at Ch- 335 M
PART A Beldarhi Jagdish Raut house to Chorinad Beldarhi PART B RCC Bridge in Between Beldarhi Jagdish Raut house to Chorinad Beldarhi at ch 95 m Approach road 180.0m
L065-Ram Prit Math To Rani Khaira via Golsan Banuwa (VR76)Costruction of 5 x19.36 M RCC Bridge at Mangia PWD Road to Banua Ramprit Math At Sitalpatti Nadi
Construction of 9x21.75M size HL RCC BRIDGE at ch. 3250 KM of Jamui Polytechnic Road to Katauna NH-333 via. Sikariya under RCPLWE for the year 2022-23Length-209.25M
Construction of new 2 Lane Major Bridge with its approaches from design Chainage 0.000 to 2.150 across River Sone in the State of Bihar via Panduka and Jharkhand under CRIF Scheme on Engineering Procurement and Construction EPC Mode
Part A Mochi Tola (Andhag) to Bakra Part B Construction of HL RCC Bridge Span 618.75m at CH-1100m in Mochi Tola (Andhag) to Bakra Road With Approach Road 58.26m
Construction of 14x21.75M size HL RCC BRIDGE at ch. 0080 KM of Jamui Polytechnic Road to Katauna NH-333 via Sikariya under RCPLWE for the year 2022-23 Length 325.5M
Construction of 2x21.75M size HL RCC BRIDGE at ch. 2075 KM of Jamui Polytechnic Road to Katauna NH-333 via. Sikariya under RCPLWE for the year 2022-23 Length-46.5M
MRL08-NH327 PETBHARI CHOWK TO MALINGAON MDR ROAD HOTE HUE BENGBASTI KASHIBARI RCC BRIDGE AT MRL08-NH327 PETBHARI CHOWK TO MALINGAON MDR ROAD HOTE HUE BENGBASTI KAS AT CH-5.582KM
T09-Ujan Janta Chowk To Via Amtahi Fulwan RCD Road Tak Construction of HL RCC Bridge At Ch 4 550 in Ujan Janta Chowk To Fulwan RCD Road via Amtahi
MRL48-PWD ROAD BELBARI TO PITHAKHA KUA MAKHANPUR HOTE HUE PWD ROAD RCC BRIDGE AT MRL48-PWD ROAD BELBARI TO PITHAKHA KUA MAKHANPUR HOTE HUE PWD ROAD AT CH- 8.100KM
MRL48-PWD ROAD BELBARI TO PITHAKHA KUA MAKHANPUR HOTE HUE PWD ROAD RCC BRIDGE AT MRL48-PWD ROAD BELBARI TO PITHAKHA KUA MAKHANPUR HOTE HUE PWD ROAD AT CH-1.941KM
MRL05- Kohbara Bishanpur chowk to 10 no Road Bhawaninagar via Bhawani nagar Kurmi tola Rcc Bridge at SH-77 Kohbara Bishanpur chowk to 10 no Road Bhawaninagar at ch-5.650Km
MRL48-PWD ROAD BELBARI TO PITHAKHA KUA MAKHANPUR HOTE HUE PWD ROAD RCC BRIDGE AT MRL48-PWD ROAD BELBARI TO PITHAKHA KUA MAKHANPUR HOTE HUE PWD ROAD AT CH- 3.470KM
Part-A Motipur me Ramjulum Yadav ke Ghar to Andauli Harijan Tola Tak Part-B RCC Bridge in Between Motipur Me Ramjulum Yadav ke Ghar to Andauli Harijan Tola Tak
Part-A Tarbi to Dumaria Muslim tola Part-B Construction of RCC Bridge Span 2 x 8om. At CH-700m in Tarbi to Dumaria Muslim tola Road with Approach Road
PROPOSED HIGH LEVEL RCC BRIDGE IN SURAHACHATTI TO HATHAURI ROAD IN PLACE OF DAMAGED SCREW PILE BRIDGE AT CHAINAGE 4.10 KM UNDER BEHERI BLOCK IN THE DISTRICT OF DARBHANGA (BIHAR)
Electrical work in connection with construction of FOB with ramp for lighter vehicles at trespass location at KM 48/24-26 between RD-MFP.
Construction of village diversion road from ROB 6A to Pirounta and Ekghara along land acquisition line near ITI and CISF complex
CONSTRUCTION OF BRIDGE OVER KAMLA RIVER NEAR KHANGAON IN KHANGAON TO RAAT TOLA RWD ROAD Block - Pandaul Length - 32.12 m
Bhagwatipur Dakshin Utkarmit Madhya Vidyalaya To Makhan Mahadalit Tola and Construction of RCC Bridge span 3 X 16.5m Bhagwatipur Dakshin Utkarmit Madhya Vidyalaya To Makhan Mahadalit Tola in at CH. 2325m
Part-A Pathgachhia Chanda Road Near Jitendra Yadav House to Ward No-7 Kedar Master House Part-B Construction of RCC Bridge Span 2X14.5m with Approach Road-100m at Ch-770m
MRL05- Kohbara Bishanpur chowk to 10 no Road Bhawaninagar via Bhawani nagar Kurmi tola Rcc Bridge at MRL05- Kohbara Bishanpur chowk to 10 no Road Bhawaninagar via Bhawani at ch-2.870KMkm
PROPOSED HIGH LEVEL RCC BRIDGE ACROSS RIVER IN PLACE OF DAMAGED PIPE CULVERT ON PATAHI JANDAHA CHOWK TO SUGAA PIPAR ROAD UNDER PATAHI BLOCK IN THE DISTRICT OF EAST CAMPARAN (BIHAR)
Part-A Baswa Tola Kajal to Kajal Part-B Construction of HL RCC Bridge (2X 16.50m Span) in Baswa Tola Kajal to Kajal at CH 3.00 KM) with Approach Road 113.88m
Proposed High Level RCC Bridge Across Branch of Kamla River On Sugrain To Jinaura via Bhagmara, Navtoliya Road Under West Kusheshwar Sthan Block in the District of Darbhanga, Near Baghmasand Navtoliya
Provision of top chord inspection pathway on open web girder bridge no. 77(1x30.5), 80(3x30.5), 81(2x30.5), 88(3x30.5+2x14.2+3x30.5), 123(2x30.5), 133(10x30.5) in SKI-NMA section, bridge no.-4(3x30.5), 5(2x45.7), 6(1x30.5) and 7 (2x45.7) in NMA-SRGR section under SSE/Bridge/Samastipur of Samastipur Division.
ABSS:- Soft upgradation of station building including provision of PP shed, Improvement to Platform Surface and FOB with other ancillary works at Katihar Railway Station.
Supplying & Erection / Launching of FOB at Rambhadrapur Station and completion of other leftover works between RBZ - HYT - TLWA stations in connection with SPJ - DBG Doubling.
Rehabilitation of ROB BEA (Bow String Girder) between station KRS-BEA in PNBE- DDU section of Danapur division under Dy.CE/BRL/HJP.
OHE modification work for removal of infringement in connection with construction of ROB in lieu of LC No. 124 of SPJ Division.
Tender Package No. MMGSY WB-20-BAISI-02 (Part-A-Jairampur West Tola To Bhakumari,Part-B-RCC Bridge In Jairampur West Tola To Bhakumari At CH-1.800 KM.) in Purnea District
Part-A PMGSY Bhag Saidula to Idgah tola. Part-B Construction of RCC Bridge Span 2 x 8.0m. at Ch-1700m in PMGSY Bhag Saidula to Idgah Tola Road With Approach Road
Rehabilitation of 04 Nos. ORN - 3 bridges (Br. 25 UP, 31 UP,9 DN,52) and minor repair of 13 Nos. Bridges (Br. 68, 81, 82, 83, 86, 93, 99, 100, 116, 117, 118, 119, 120) under jurisdiction of Sr. DEN/III/SEE.
(1) Provision of Limited height sub-way in lieu of LC No. 01 between BCA-VPDA. (2) Provision of Limited height sub-way in lieu of LC No. 2 between BCA-VPDA. (3) Provision of RUB in lieu of LC No. 7B b/w VPDA - BCA at Km 204.464. (4) Provision of RUB ... of RUB in ...
At Zone No. 1A:Maintenance and repair of staff quarters, service building, Roads, drains and Railway Track : O.T. Para including Railway Hospital, Children park, RPF 'C' Company, Yard Office, Manihari terminal, Yard FOB, Mangal Bazar ROB, SSE(W)/W office, AMM Store, Electrical Sub station, Kosi Pump Station etc. at Katihar and all assets between Katihar-Teznarayanpur section, (Km 0.00 to Km 34.73) under SSE/W/W/KIR from 01.07.2026 and upto P.E 30.06.2028.
Provision of FOB with ramps for lighter vehicles at tresspass location at Km 80/11- 13 (Near village Rishand) between PNBE-Gaya Section of Danapur Division.
Bridge L 32.04 m
Construction Of RCC Bridge at NH31 Pul Se Railway Pul ke Nichey Hoke Guide Bandh Hute Hue Katriya Ke Taraf Katriya Wat Briksh ke Bay Taraf Se Sangam Asthal tak Path Pul Nirman
Repair and rehabilitaiton of Bridges of Purnea - Dalkhola section of NH -27 in the state of Bihar(2nd Call).
Repair and rehabilitaiton of Bridges of Purnea - Dalkhola section of NH -27 in the state of Bihar(3rd Call).