Loading…
Loading…
1,096 results • Best match
Part - A Bualdah Talbarimaal tola to PMGSY Bridge Part - B CONSTRUCTION OF BRIDGE ACROSS DHAR RRIVER BETWEEN BUALDAH TALBARIMAAL TOLA TO PMGSY
MMGSY Road Arjun Sharma ke Ghar ke Nikat se UP-Swasth Kendra Ratansar Tak Construction of RCC Bridge in Between MMGSY Road Arjun Sharma ke Ghar ke Nikat se UP-Swasth Kendra Ratansar Tak.
Part-A PMGSY Yadav tola to Bagada Dangi tak Part-B Construction of RCC Bridge Span 2 x 8.0m. at ch- 700m. In PMGSY yadav tola to Bagada Dangi tak Road with Approach Road
Part-A PWD Ucch Vidayal via Shanthal tola to Gharmawari Dumaria Part-B Construction of RCC Bridge Span 2 x 8 at ch. 0m. In PWD Ucch vidyal via Shanthali tola Wth Approach Road
Painting, Greasing and Maintenance of Mainline Pipe and Pipe Hanger Assemblies at Bridges under Group-A BKPL Bihar Base Jurisdiction
Construction of New 4-Lane H.L. R.C.C. Major Bridge at existing location of old Bridge across Sukhaniya River in Km 52th on N.H.- 133E and its approaches having an Aggregate Lenght of 370m 147m Bhagalpur Side and 223m Bhaljor Side in District Banka i
1. DBG-SMI Section - Through channel sleeper renewal (H-beam) with chequered plate on various girder bridges (Br. No- 18) Total - 155 Nos. 2. MFP-SMI: TBSR (H- beam) with chequered plate on various girder bridges (Br. No- 59, 60, 61, 63 & 67) Total - 562 Nos.
Part-A Ramnagar Pokhar to East Brahman Tola (Koluha Sema) Part-B Construction of RCC Bridge 2x8.0m Span at Chainage 1.150 km in Ramnagar Pokhar to East Brahman Tola (Koluha Sema) With Approach Road Length.
Customized AMC/CMC for Pre-owned Products - CAMC OF LORRY WEIGH BRIDGES; ELWB 100 MT RICE LAKE; Comprehensive Maintenance Contract (CMC); QUARTERLY; No, Customized AMC/CMC for Pre-owned Products - CAMC OF LORRY WEIGH BRIDGES; ELWB 120 MT STATWEIGH ... WEIGH BRIDGES ; ... WEIGH BRIDGES ; ... WEIGH BRIDGES ; ... WEIGH BRIDGES ; ... WEIGH BRIDGES ; ...
Painting of Mainline Pipe and Supports at bridges in BK12 inch, HB12 inch and PHB18 inch section under BKPL Barauni jurisdiction.
PART-A Kohara To Mahabirganj Under Block Bikramganj PART-B Construction of Bridge SL 1 Kohara To Mahabirganj Span-1x18.75 with Approch Road 100.00m
1 Const of HL Bridge over mahane river in between banber market and barsandsehar 2 Const of HL RCC bridge at ch 9.5 km in RWD Road PWD kharagpurjamui (banhara) to gonaili team mili near manjuva
Part-A Dena Chowk to Tarvi Tola Tak Via Ghat Belwari Part-B Construction of RCC Bridge 2x8.0mxSpan at Chainage 0.200 km in Dena Chowk to Tarvi Toli Tak Via Ghat Belwari With Approach Road Length
Improvement of PF surface of PF No. 2-3 and passenger amenities like canopy, PP shelter, skywalk connecting to FOB etc. in connection with Amrit Bharat Station at ARA.
Construction Of New High Level RCC Major Bridge at existing location of Old Bridge Across Chir River in KM 199 on NH 333A and its approaches having an aggregate length of 700m 350m on both side in district banka in the state of Bihar on EPC Mode.
S&T Work: (i)Utility shifting of LC Gate No. 158 (JDR-BMKI) in connection with the work " Construction of ROB at LC No.- 158 between Jivdhara -Motihari in East Champaran District. (ii) Utility shifting of LC Gate No. 178 (SGL-MJL) in connection with ... of ROB at ... of ROB at ...
Part-A PMGSY Purav Sarpanch ke Ghar to Jama Masjid Tak Part-B Construction of RCC Bridge 2x8.0m Span at Chainage 20 m in PMGSY Purab Sarpanch k Ghar se Jama Masjid Tak Road With Approach Road.
Provision of top chord inspection pathway on open web girder bridge no. 53(4x30.5), 52(4x30.5), 51(1x18.3+1x24.4+1x18.3+2x45.7+5x30.5), 50(3x30.5+2x45.7+3x30.5), 47(5x61.0), 45(3x30.5) and 44(3x30.5) in MNE-SHC section, bridge no.- 115(3x30.5), 114(2x30.5),100(2x61), 72A(1x30.5) and 61(1x30.5) in SHC-PRNC section under SSE/Bridge/Samastipur of Samastipur Division.
Construction of Bridge, Retaining wall, Drainage system and other miscellaneous work regarding Toy train at Sanjay Gandhi Biological Park (Zoo) Patna under ADEN/L/PNBE.
Bridge L 57.06 m
Part-A Dimiya Middle School to Kabristan Hokar Kuchha Muslim Tola Part-B Construction of RCC Bridge 2x8.0 m Span at Chainage 0.750 km in Dimiya Middle School to Kabristan Hokar Kuchha Muslim Tola With Approach Road Length.
Part-A Hatwa Mallopada Road Laluabari to Domhana Purnea Sima Lalubari Part-B Construction of RCC Bridge Span 4 x 8.0m at ch-860m in Hatwa mallopada Road Laluabari to Domhana Purnea Sima Lalubari Road with Approach Road
Shifting of 11 KV Line LT Line and transformer etc infringing in the alignment of construction of Light FOB with Ramp at east side of LC No 33 at Raxaul Bihar
Provision of Saw-Cutting Work Required for Bed Block Replacement / Replacement of PSC Slab on Bridges under the Jurisdiction of Sr.DEN/3/DNR.
Other Non consultancy Services for Carrying out NDT SDT and other tests for Comprehensive Audit of 3 bridges under NHAI PIU Begusarai Bihar
Tender Package No. MMGSY WB-19-TRIVENIGANJ-04 (Part-A-Litiyahi Saharsa Path Ke Bishanpur To Gathiya, Part-B- Construction of H.L. RCC Bridge Ch 2 400 Km In Litiyahi Saharsa Path ke Bisanpur to Gathiya) in Supaul District
Construction of RCC Bridges at Mahwa Paswan Tola to Baigni Ram Tola MMGSy Path ke Bech Kamla Nadi par PCC Piliya ka Nirman Box
Earthwork in formation, construction of bridges , drain, P. Way linking work, supply of ballast , P. Way materials, PSC Sleepers, Points - Xing, Derailing Switch, ancillary work etc. in connection with construction of New Railway Siding for Barauni
Part-A Mallopada Road Nawa Hat Se Bakra Nadi Nawankar Tola Tak Part-B Construction of RCC Bridge 2x18.75 m Span at Chainage 0.900 km in Mallopada Road Nawa Hat se Bakra Nadi Nawanankar Tola Tak with Approach Road Lenhth
Part-A BHAG KOHALIYA TO MUSALMAN TOLA Part-B Construction ofRCC Bridge 3X8m Span with Approach Road 100 m at CH-650 m Part-C Construction of RCC Bridge 4X14.5 m Span with Approach Road 100 m at CH-1640 m
Construction of HL RCC Bridge (5x26.50M) in Km 19 (Kinjer) of NH 33 (Old NH 110, Km 71) in the district of Arwal in the State of Bihar for the year 2024 25 under NH Divison Gaya on EPC mode.
Electrical General work in connection with Engg. work "ABSS: - Soft Upgradation of Station Building including Provision of PP Shed, Improvement to Platform Surface and FOB with Other Ancillary Works at Katihar Railway Station".
Fabrication and Supply of Galvanized H-Beam sleepers at Br. No.179 in Nawada-Tilaiya section and Supply of structural steel, Fabrication and construction of FOB at different stations in Kiul-Gaya section
1 Champanagar Panchayat Champanagar Thakur Bari se via Sogata Middle School to Bhegadhar 2 Construction of Bridge on Champapur Thakur Bari to Bhengadhar Road with approach Road 118m
Provision of Bearing inspection platforms on 21 nos. of bridges i.e. in MGR - SBDP- UMNR - SKJ - KIR - BJU under SSE/BR/MGR in SEE-Division.
Construction of Station Building Platforms FOB and Passenger sheds at Hathidah and Tal Railway Stations in connection with Rampur Dumra Tal Rajendrapul Additional Bridge and doubling project near Mokama in Danapur Division of ECR
Part-A Fango Halt se Dhanchhar Bucha Fango Singhswa Bankol Hote Hue Arnama Nonha to Muzaffarpur Shyam Part-B Construction of HL RCC Bridge Spanat CH-5100m in Fango Halt se Dhanchhar Bucha Fango Singhwa Bankol Hote Hue Arnama Nonha to Muz.
Construction of H.L bridge in Mohanpur - lakhaipur- Paharpur Road at Chainage- 3.775 (length- 2 x 18m) Package No-BR12RC002
Construction of 2 Lane ROB over L.C. No 2 between Muktapur and Kishanpur station on Samastipur Darbhanga Road NH 322 in Samastipur district in the state of Bihar. (Job No.-NH-322/BR/2023-24/101)
Balance utility shifting such as 11KV, LT line and transformer etc. infringing in the alignment of Punpun arm of ROB in lieu of LC-79A and LC-1SPL at Mithapur, Patna, Bihar
W.S. of 2 Lane to 4 Lane with divided Carriageway From Ch 67.471 (Mathurapur) to Ch 69.256 (MuktapurROB) and Construction of H.L RCC Bridge(8x24.00m) Over River Budhi Gandak in place of Old Damaged Screw Pile Bridge at Near Magardahi Ghat of NH 322.
Construction of two no. of new RCC minor Bridge 3x18.84 m and 3x5x4 and 3 nos of new box culverts 2 nos 1x3x3 and 1 no 3x3x3 in place of old bridge and culvert at various chainage in NH 33 old nh 110 on epc mode in the State of Bihar
Construction of Railway track linking with formation works including Bridges, Ext. of FOB, Service Buildings, Road, Drain and General Electrical works etc. in connection with construction of Lalmatia Silo-3 Track and its Connectivity with existing MG
A. OHE modification in connection with "Construction of 3.0m wide FOB with ramp at Panchgachia of Samastipur Division". B. OHE modification work in connection with "Raising of platform no. 1, 2/3 to high level at Purnea court station".
Provision of RUB/LHS in Lieu of Level Crossing No. NC-88 at KM 179/3-4 and NC-86 at KM 176/7-8 in between KDPR-EKI under the jurisdiction of SSE/WORKS/OMLF.
Protection of Major bridge No. MK/9, MK/11,13,14,15,16 UP & DN line, MK/12 KUMEDPUR-KATIHAR(KDPR-KIR) Single line Section 1, 2, 13, 18, 20, 24, 30, 45, 49, 57, 60, 65, 68, 71, 77, 86,99, 101 EKLAKHI - BALURGHAT (EKI-BLGT) Single line Section & 44,45,46, 49,50,51,54 OLD MALDA-SINGHABAD (OMLF- SQB) Single line section under ADEN/MLDT (Total 38 Nos.)
Shifting of underground 33KV HT cable crossing the Railway track which is passing through the alignment of PP2 location of Punpun arm of ROB in lieu of LC-79A and LC-1SPL at Mithapur, Patna, Bihar
Construction of 2 nos. Foot Over Bridges (FOBs) on Standalone basis at Km. 45.240 Km. 54.640 on Galgalia-Araria section of NH- 327E in the state of Bihar on EPC mode
Construction of 2 lane ROB and its approaches in KM 158 old KM 153 on NH 104 at Jaynagar Bypass in the state of Bihar on EPC mode for the year 2021 22. (Job No 104 (New NH 227)-BR-2021-22-47)
CONSTRUCTION OF ONE SEMI PERMANENT BARRACK AT FOB PAISRA MUNGER BIHAR