Loading…
Loading…
450 results • Best match
Renovation of 09 Nos. Weigh Bridges at KOCP of Kusmunda Area.
Execution of MINOR BRIDGE Catch water Drain Mexican Turfing and Earthwork in Ramp in and Exit approach and Stacking Platform etc in connection with Conversion of Manikpur CHP Siding into SILO Loading Siding
Execution of Signaling & Telecommunication work in connection with: (1) Provision of road under bridge for closure of manned level crossing No.DD-19 at Km. 889/7-8 in Durg-Dallirajhara section, (2) Provision of road under bridge for closure of manned ... of road under bridge for ... of RUB at ...
Execution of Earth Work including blanketing, Construction of Minor bridges including RUBs, LHS, Protection works, Pitching, Drains, Track Linking Works, Retaining wall, Transportation of P.Way Materials, Supply of machine crushed Stone Ballast and other associated misc. works fit for commissioning of the section between Jagdalpur to Kurkanar (from Ch 0.620 to 12.70 km) including Palli and Kurkanar yards in connection with "Rowghat-Jagdalpur new line (140.00 Km) on South east Central Railway
CONSTRUCTION OF HIGH LEVEL BRIDGE ACROSS GHODAGAON NALA ON JAKKE-GHODAGAON ROAD.
CONSTRUCTION OF HIGH LEVEL BRIDGE ACROSS PHOOLDORGI NALLA ON AMAKONI - CHORBHATTI ROAD.
Annual day-to-day cleaning and upkeeping of different weigh bridges including removal of coal, muck, slush, etc. away from Weigh Bridges Premises at KOCP of Kusmunda Area.
Construction of ROB (1 X 48.0m )Bow String Girder as superstructure resting on Pile Foundation including its both approaches and General Electrical works for the work of Kusmunda opencast of Kusmunda area
Repair of Road side Main Drain and Approach along ROB toward Chakabuda at Gevra Area
Miscellaneous maintenance of bridges like through/patch painting, greasing, replacement of elastomeric bearings and epoxy grouting in various bridges in the jurisdiction of SSE/Bridge/NIR in Nagpur Division
Construction of one number ROB ( 3x30m and 1x24m) having composite Girders resting on Pile Foundation in connection with Detailed Engineering (DE) , Project Management Consultancy (PMC) at Dipka Siding
Metallising and painting of steel girder bridges (05 nos.) over MGRtrack for NTPC - TSTPS
FSR DPR and Detailed Engineering of Additional ROB for Forest Nikas pathroad crossing at Ch 13 600Km of KRL TM Section
Repair/ Realignment of 350mm dia DI Pipeline under Kusmunda and Ganga Nagar ROB at Gevra Area
Annual day to day cleaning and upkeeping of 03 nos. road weigh bridges and 02 nos. rail in-motion weigh bridges at Gevra Road Railway Siding at KOCP of Kusmunda Area.
Manpower Deployment For Operation Of Weigh Bridges And Other AshUtilization Activities At NTPC Lara For Two Years
Construction of approach road to 03 NOS. weigh bridges under Bijari Sub Area.
Improvement to road surface and drainage arrangement at RUB No.389B (Tekari), 392A (Mandhar) and 395B (Banbanda).
Construction of one ROB at Dipka Market Level Crossing under Dipka Area of SECL, Distt. Korba , Chhattisgarh
Construction of Approach Road for connecting ROB with Gevra-Korba Road at Kusmunda Project of KUSMUNDA AREA.
Annual day to day cleaning and upkeeping of 03 nos. road weigh bridges and 02 nos. rail in-motion weigh bridges at Gevra Road Railway Siding at KOCP of Kusmunda Area. (Re-tender)
CONSTRUCTION OF 2-LANE ROB AT LC NO.AB-27 (BELBAHARA ROB) ON MANENDRAGARH TO AMBIKAPUR SECTION OF NH-43 (OLD NH-78) AT NH KM 264.000 AND RAILWAY CHAINAGE 937/14-15 BETWEEN UDALKACHAR-BORIDAND STATIONS IN THE STATE OF CHHATTISGARH
Construction of 2-Lane ROB At LC No.AB-27 (Belbahara ROB) on Manendragarh To Ambikapur Section Of NH-43 (Old NH-78) At NH Km 264.000 and Railway Chainage 937.14-15 Between Udalkachar-Boridand Stations in the State of Chhattisgarh
Construction Of High Level Bridge and Approach Road Across Agar River on Surajpura-Budhwara Road
CONSTRUCTION OF HIGH LEVEL BRIDGE AT GOURELLA KARANGARA ROAD KM 3/2 AND APPROACH ROAD.
Construction Of High Level Bridge and Approach Road Across Maniyari River On Ghanaghat-Bagharra Road .
CONSTRUCTION OF HIGH LEVEL BRIDGE i/c APPROACHES ACROSS GHUMARIYA NALA ON PATHANDHORGI- DATRENGATOLA ROAD
CONSTRUCTION OF HIGH LEVEL BRIDGE ACROSS SHEONATH RIVER ON TAKAM DONGAGHAT TO DANGANIA BASTI ROAD
Construction of High Level Bridge and Approach Road Across Gurma Nalla on Kudmura-Shyang Road.
CONSTRUCTION OF HIGH LEVEL BRIDGE i/c APPROACHES ACROSS SURHI RIVER ON GANDAI-KRITBANS ROAD.
CONSTRUCTION OF HIGH LEVEL BRIDGE ACROSS MOTIYARI NALLA ON AMAKONI - CHORBHATTI ROAD KM 23/10 .
Dust suppression work from RUB to Bajrang Chowk and Ash Transportation Road, Manikpur OCP, Korba Area. (Re-tender)
Repairing and painting of the weigh bridges at Jampali OCM of Jampali Sub-Area.
Two (2) Year Maintenance Contract for Two Nos of Pit-Less Electronic Weigh Bridges of 100 MT Capacities Each at NTPC Sipat.
Facility Management Services - LumpSum Based - weigh bridges; O&M of Civil Work, Cleaning of 06 Nos. weigh bridges for two years at Baroud OCM of Baroud - bijari Sub Area; Consumables to be provided by service provider (inclusive in contract cost)
"Construction of 03m wide FOB at Km.675/17-19 (Nahariya Baba Mandir) near Naila Railway station to avoid pedestrian trespassing".
CONSTRUCTION OF HIGH LEVEL BRIDGE I/C APPROACH ROAD ACROSS LAWA RIVER ON MANORA -PERWATOLI ROAD
CONSTRUCTION OF HIGH LEVEL BRIDGE ACROSS KOKIYA RIVER INCLUDING APPROACH ROAD ON BHALUMUNDA TO KHAJURGHAT ROAD.
CONSTRUCTION OF HIGH LEVEL BRIDGE INCLUDING APPROACH ROAD ACROSS HASDEV RIVER ON PENDRI TO MANGORA ROAD.
CONSTRUCTION OF HIGH LEVEL BRIDGE I/C APPROACH ROAD CROSS PHONK RIVER ON BHONDA-BHIRA ROAD.
CONSTRUCTION OF HIGH LEVEL BRIDGE ACROSS IBB RIVER INCLUDING APPROACH ROAD ON DAIJBAHAR TO DHAURASAND ROAD.
Construction Of High Level Bridge i/c Approach Road Across Banki River on Banapati - Dhamni Road.
Construction of High Level Bridge i/c Approach Road Across Kursa River on Lodha - Dharmi Road.
Construction of High Level Bridge i/c Approach Road Across Iria River on Karamdiha – Bengo Road.
CONSTRUCTION OF HIGH LEVEL BRIDGE i/c APPROACHES ACROSS KARRA NALLA ON GANDAI-LIMO-DULLAPUR ROAD.
Construction Of High Level Bridge i/c Approach Road Across Moran River on Kapildevpur – Basera Road.
Construction of High Level Bridge i/c Approach Road Across Iria River on Wadrafnagar – Mendhari Road
BORING WORK FOR CONSTRUCTION OF HIGH LEVEL BRIDGE UNDER SUB-DIVISION JAGDALPUR (BUDGET YEAR 2026-27)
Construction of High Level Bridge i/c Approaches Across Kharun River on Patan - Motipur - Amleshwar Road.
Improvement to road surface and drainage arrangement at RUB No.356A (Nehru Nagar), 363C (Sirsa) and 376A (Doomar talab).