Loading…
Loading…
3,204 results • Best match
Construction of Chandon to Karpa road. 1st Call, PAC Rs. 365.20 Lacs on Road and Bridge Works SOR 25.03.2022 (Ammendment upto date), Completion period 300 days i/c rainy season.
Construction Of ROB at Railway Level XING NO 255 in KM 844/8-10 at Bhopal Bina Section On Bhopal Vidisha Road at Chopda Kala District Bhopal
BT OVERLAY ON EXISTING MAIN CC ROAD AT WARD NO 12 FROM ROB TO SLEEPER FACTORY MAIN MANA ROAD UNDER KAYAKALP IN NAGAR PARISHAD BUDNI. (2ND CALL)
On Turnkey Basis Construction of Bridge of Aulliya Medium Irrigation Project on Khandwa - Khirkiya road, as per detailed scope of work but not limited to that
Repairing of Bridges Culverts Refixing Painting Writing Figuring of KM Point Stone and Side Birm Filling on Roads under PWD Sub Division Nowgong
Repairing of Bridges Culverts Refixing Painting Writing Figuring of KM Point Stone and Side Birm Filling on Roads under PWD Sub Division Luvkushnagar
Zonal Tender For Repair of Pot Hols of Raod Under Div. Sidhi Distt. Sidhi PWD Road and Bridges SOR w.e.f 25-03-2022
Repairing of Road and Bridges and Culverts in Km 81 to 100 of Mandla Dindori road Damaged due to Rains of NH 543
Repairing of Bridges Culverts Refixing Painting Writing Figuring of KM Point Stone and Side Birm Filling on Roads under PWD Sub Division Bijawar
Repairing of Road and Bridges and Culverts in Km 7 to 35 of Mandla Dindori road Damaged due to Rains of NH 543
Repairing of Bridges Culverts Refixing Painting Writing Figuring of KM Point Stone and Side Birm Filling on Roads under PWD Sub Division Chhatarpur
PAINTING AND FIGURING ON BRIDGES AND CULVERTS PARAPITS,RAILING ON DINARA PICHHORE CHANDERI MELUA CHOURAHA ROAD KM 0 TO 184 ON NH 346
CAUTIONARY WORK FOR TRAFFIC AT WATER LOGGED BRIDGES AND CULVERT DUE TO HEAVY FLOOD DURING RAINY SEASON UNDER PWD DIVISION SHIVPURI DISTT. SHIVPURI
Nagda -Maksi, Maksi - Dewas and Indore -Dewas -Ujjain Section - Annual repair and Maintenance of bridges in ADEN (West) Ujjain Section . (For Two Year)
Bridge Repair work
Construction of Paliya Pipariya to Machherakala road. 1st Call, PAC Rs. 308.56 Lacs on Road and Bridge Works SOR 25.03.2022 (Ammendment upto date), Completion period 300 days i/c rainy season.
DISMANTLING AND SHIFTING OF 11 KV, LT LINE AND DTR OF ROB UNDER ITARSI-MANIKPUR RAILWAY SECTION KM 906/3-4 LEVEL CROSSING NO 278 NARSINGHPUR DISTT. NARSINGHPUR.
DESIGN AND CONSTRUCTION OF RAIL OVER BRIDGE (ROB) BETWEEN RAILWAY KM 71.9 AND 72.0 BETWEEN LAXMI BAI NAGAR STATION AND MANGLIYA RAILWAY STATIONS ALONG MR-10 ROAD INDORE
Operation and Maintenance of Gantry Package-02 G2 and FOB as Detailed in RFP against Advertisement Rights for a License Period of 10 Yeard, Municipal Corporation Gwalior file No. 114/25X2/10
Construction of new 3.0m wide FOBs at Bharsendi(BSDL), Sursaraighat Jhara(SSGJ) an Khanna Banjari(KHBJ) stations along with extension of existing FOB at Vijaysota(VST) station in connection with Katni-Singrauli Rail Doubling Project under West Centr
Assistance in daily Cleaning of Weighing Table Computer Room and nearby areas of 04 Nos. 50 MT Capacity Road Weigh Bridges, STPS, Sarni.
INVITING RATE FOR ALL KIND OF REPAIRING AND CONSTRUCTION WORK UPTO 1.00 LACS BASED ON MPUADD ISSR 08.11.2025 ROAD AND BRIDGES SORS ALL ITEM
Repairing of approach road and ramp connecting coal stock yard and Weigh Bridges Ramp of BG Siding at Newton Sub Area of Pench Area.
Strengthning work of Banjari Padkhuri Road L- 1.10 Km, Under Sub. Dn. Sidhi Distt. Sidhi PWD Road and Bridges SOR w.e.f 25-03-2022
Strengthning work of Kapuri Bedauliyan Road L- 1.95 Km, Under Sub. Dn. Churhat Distt. Sidhi PWD Road and Bridges SOR w.e.f 25-03-2022
Strengthening of Nandarwada Koylajhir road. 1st Call, PAC Rs. 80.96 Lacs on Road and Bridges SOR 25.03.2022 (Ammendment upto date), Completion period 60 days.
Const. of Mamdar Padkhuri Gaddi Road L- 1.20 Km, Under Sub. Dn. Churhat Distt. Sidhi PWD Road and Bridges SOR w.e.f 25-03-2022
Strengthening of Raisalpur approach road. 1st Call, PAC Rs. 101.84 Lacs on Road and Bridges SOR 25.03.2022 (Ammendment upto date), Completion period 90 days.
Restoration work of Road, Bridges and During the rain and after Rains under the Maintance Section Singhpur under Sub Division Nagod Distt. Satna (M.P.)
Strengthning work of Agdal Majhiyar Road L- 1.00 Km, Under Sub. Dn. cHURHAT Distt. Sidhi PWD Road AND Bridges SOR w.e.f 25-03-2022
Strengthning work of Gandhigram Pawaiya Road L- 2.70 Km, Under Sub. Dn. Majhauli Distt. Sidhi PWD Road AND Bridges SOR w.e.f 25-03-2022
Const. of Jhagrauhi App. Road L-2.30 Km, Under Sub Dn Churhat, Distt. Sidhi PWD S.O.R. Road And Bridges SOR W.e.f 29-08-17
Strengthning work of Kudiya Kaimor Road L- 1.80 Km, Under Sub. Dn. Churhat Distt. Sidhi PWD Road and Bridges SOR w.e.f 25-03-2022
Strengthning work of Sagauni App Road L- 2.00 Km, Under Sub. Dn. Churhat Distt. Sidhi PWD Road and Bridges SOR w.e.f 25-03-2022
Strengthning work of Aithi App. Road L- 2.36 Km, Under Sub. Dn. Sidhi Distt. Sidhi PWD Road and Bridges SOR w.e.f 25-03-2022
Strengthning work of Padkhuri Satnara Road L- 3.05 Km, Under Sub. Dn. Majhauli Distt. Sidhi PWD Road and Bridges SOR w.e.f 25-03-2022
Construction of earth pits including connection at different locations of Sub-station A, B at CHP phase-II and Weigh bridges in Amlohri Project
Strengthning work of Morcha Sukwari Road L- 1.95 Km, Under Sub. Dn. Majhauli Distt. Sidhi PWD Road and Bridges SOR w.e.f 25-03-2022
Construction of Divine City Colony to Badi Pahadiya road. 1st Call, PAC Rs. 401.38 Lacs on Road Bridge Works SOR 11.04.2025 (Ammendment upto date), Completion period 300 days i/c rainy season.
Construction of Kharigav approach road, length 1.00 Km. 1st Call, PAC Rs. 153.48 Lacs on Road and Bridge Works SOR 25.03.2022 (Ammendment upto date), Completion period 240 days i/c rainy season.
Metal Supply, Repair of Bridge and Culvert, B.T. Patch repair, Jungle clearance , Shoulder repair. Including necessary Maintenance of various road Under P.W.D. Division Chhindwara. ( All items Including in M.P.W.D. Road/Bridge S.O.R. w.e.f. 25/03
Pole Shifting and Raising of 33 KV ,11 kv HT and LT line on Railway Crossing 379 And Railway Over Bridge (RoB) on Jhansi Manikpur Rail Line,Distt. Niwari
CONSTRUCTION OF CEMENT CONCRETE ROAD AND CROSS DRAIN AT WARD NO 29 PRATAP NAGAR KE SAMNE SAMYAK RECIDENCY KS PAS ROB KE NICHE RATLAM AS PER NIT AND ESTIMATE
B.T. Renewal work on Harda (Khirkiya) - Khandwa Road (SH-71) in Km 1 (including ROB Portion), 42,43,44,46 - 56, 58, 60 - 65, 68, 70, 75 - 78 (Total Length 27.30 Kms)
EXTERNAL ELECTRIFICATION OF OVERHEAD 33KV/11KV/LT LINE/DTR SHIFTING STREET LIGHTING IN NEW CONSTRUCTED OF ROB ON SHIVPURI POHARI ROAD RAILWAY CROSSING IN DISTRICT SHIVPURI LENGTH 0.710 KM
Design and Construction of Rail Over Bridge (ROB) Between Railway Km 6-20 AND 6-22 Between Karchha Station and Ujjain Railway Station VRG-MABG on IDU Section, Ujjain.
Pole Shifting and Height raising of 11 KV, LT line Due to Construction of Bridge on Maina River From Maina to Mainapolay road unde DC Maina Dist Sehore
Canal Bridge Repair work
Strengthning work of Marsharha Rojha App. Road L- 2.00 Km, Under Sub. Dn. Sidhi Distt. Sidhi PWD Road and Bridges SOR w.e.f 25-03-2022
SEALING OF CRACKS WITH EPOXY GROUT AND GUNITING CONSTE FOR BRIDGES IN KM 85/6 AND 76/4 ON NH-346 DINARA TO CHANDERI ROAD