Loading…
Loading…
3,204 results • Best match
Ratlam Division - Vikram Nagar - Electrical work in connection with provision of One 06 meter wide FOB with ramp with cover and improvement to water arrangement (Simhastha 2028)
MAINTENANCE OF SD S BRIDGES WORK OF ROAD UNDER DHEEMARKHEDA PUBLIC WORKS DEPARTMENT (B/R) SUB DIVISION NO 1 KATNI
Collection and removal of coal spillage on and under the 02 Nos. Weigh bridges at AOCP of J K Area.
REPAIR OF CULVERTS AND BRIDGES WITH PAINTING, FIGURING IN KM 1 TO 50 DINARA TO CHANDERI ROAD ON NH 346
Invitation for Consultancy Services for Road and Bridges Construction and Other Infrastructure Development Work Planning Drawing Designing Preparation of DPR
REPAIR OF HUMPS AT APPROACHS OF BRIDGES IN KM 2 TO KM 17/6 OF CHANDAN PIPALIYA JAITHARI PRATAPGARH ROAD.
Annual Patch Repair And Maintainance Of Roads, Bridges And Culverts Under PWD Division No 1 Balaghat. Total Road Length 223.00
REPAIR OF CULVERTS AND BRIDGES WITH PAINTING, FIGURING IN KM 51 TO 100 DINARA TO CHANDERI ROAD ON NH 346
Removal and Refixing of Pipe Railing on submersible Bridges under PWD Bridge Sub Division Indore. Distt- Indore and Dhar (MP)
On Turnkey Basis Construction of Bridge under submergence of Chakora Minor Tank, as per detailed scope of work but not limited to that.
CONSTRUCTION OF SHALAIYA TO KON VIA MUDARIYA CHAOBAN WITH CONSTRUCTION OF BRIDGE IN SAILAR RIVER ROAD LENGTH 2.30 KM SUBDIVISION MAUGANJ (THIRD CALL)
Construction of Submersible Bridge Across Kshipra River From Shani Mandir to Prashanti Dham Near Shani Mandir, Parallel to Indore Ujjain 6 Lane Road Including Approach Road, Electical Pole Shifting and Street Lighting Work District Ujjain in EPC Mode
Supply installation testing and commissioning of Signalling material in connection with:-Indore-Dewas-Ujjain section: Providing subway(RUB) to eliminate level crossing no. 10,13,34 & 36.
Construction of 2-lane road Railway under Bridge (RUB) connecting Mahalgaon to Harishankarpuram in Gwalior city in the State of Madhya Pradesh on EPC mode.
11KV Line and LT line Shifting work Neveri Bypass bridge construction under NDB plan at Village Nevri Distt. Dewas.
11KV Line and LT line Shifting work Gangi river bridge construction under NDB plan at Village Nevri Distt. Dewas.
Construction of Cement Concrete Pavement, Median , Centre Lighting ,Bridge Work And Electric line shifting Etc -MR-3 Pipliyapala Regional Park To Bypass.
Providing Architectural and Engineering Consultancy Services for Construction of ROB in lieu of LC No. 418 at Km 1221/40-42 on Jhansi-Gwalior section
B.T. Repair work on ROB LC No 287 in Railway km 926/10-9 on Bhopal Beena Section on Vidisha -Pawai-Gulabganj Road. Distt Vidisha
S&T work in connections with construction of LHS/ROB - 4, 16, 20, 52 & 62 of Jabalpur division on West Central Railway (Signalling & Telecom Work).
BT OVERLAY ON EXISTING MAIN CC ROAD AT WARD NO 12 FROM ROB TO SLEEPER FACTORY MAIN MANA ROAD UNDER KAYAKALP IN NAGAR PARISHAD BUDNI.
Design and Construction of RCC Pier for Pipe Support and Providing, laying, jointing and testing shifting of Ductile iron clear water rising main and sewer rising main pipeline of different Dia as per alignment of Proposed Submersible Bridge Across
Annual Maintenance work of Bridges for year 2025-26 under PWD Bridge Sub Division Indore. Distt- Indore, Dhar and Jhabua (MP)
Annual Maintenance work of Bridges for year 2025-26 under PWD Bridge Sub Division Khargone. Distt- Khargone, Badwani and Alirajpur (MP)
Assistance in daily Cleaning of Weighing Table Computer Room and nearby areas of 03 Nos. 50 MT Capacity Road Weigh Bridges.
Repair and Rehabilitation work of Poor and very Poor bridges other than RAMS under Bhopal Dhar and Sagar Division Group J
Engagement of Consultant for the Preparation of Detailed Project Report for Construction of Bridge at Sarpa River In Ward No. 14, 15, Mohgaon, Chhindwara
CONSTRUCTION OF BRIDGE AND APPROACH ROAD AT GORSARI NALA ON KHUTHA TO NARAYAN DEV ROAD LENGTH- 0.37 KM, UNDER SUB DIVISION MAJHGAWAN, DIVISION SATNA
Repair of Bridge and Culvert with damage approach different roads of Hoshangabad Sub Dn. 1st Call, PAC Rs. 19.00 Lacs on Road SOR 29.08.2017 (Ammendment upto date), Completion period 120 days.
Planning, Designing, Construction including Surveying,Geo-Technical and Hydrological Investigation for Construction of RCC Bridge of length 40m and 11.50m overall width across Dhankasa Nallah at Dhankasa UG, Pench Area,WCL on Turnkey basis (2nd Call)
Repair of Bridge/Culverts
11KV Line and LT line Shifting work on Sendla river bridge construction under NDB plan at Village Manasa Distt. Dewas.
Estimate for Proposed Bridge/New work Survey for the year 2026-27 under PWD Bridge Construction Sub Division Nowgong (M.P)
Estimate for Proposed Bridge/New work Survey for the year 2026-27 under PWD Bridge Construction Sub Division Sagar (M.P)
Construction of U Shape Drain and Footpath from Ingoriya Road Over Bridge to Old Bus Stand
Beautification and Lighting Work of Existing Road from Old Bus Stand to Ingoriya Road Over Bridge
SOIL INVESTIGATION AND BORING WURKS FOR PROPOSED BRIDGE AND D P R WORK ON PWD BRIDGE CONSTRUCTION DISTT KATNI UNDER SUB DIVISION JABALPURSOIL INVESTIGATION AND BORING WURKS FOR PROPOSED BRIDGE AND D P R WORK ON PWD BRIDGE CONSTRUCTION DISTT KATNI UND
Shifting of HT/LT Lines and Poles and Transformer of Creating Obstacles in Construction of Bridge Near Barudmall Village on Ruparail River at Distt. Khandwa.
Shifting for 11kv AND LT line for Construction of bridge on Mahana River of Baikunthpur-Lalgaon road Dewas feeder under Baikunthpur DC, Dist. Rewa (M.P.)
Shifting of HT/LT Lines and Poles and Transformer of Creating Obstacles in Construction of Bridge Near Bhawaniya Village on Ghodapachhad River at Distt. Khandwa.
Construction of Cement Concrete work and drain at mandi yard semriharchand and Construction of Bridge Box culvert on Canal At Mandi Yard Semriharchand , Distt Narmadapuram
REPAIR AND MAINTENANCE OF KM 42,58,60,61,62 AND REPAIR OF DAMAGED MINOR BRIDGE IN KM 67/6 INCLUDING DIVERSION AND REPAIR OF SHOULDER WITH PAVER BLOCK IN KM 63/2 TO 64/10 OF INDORE BETUL ROAD NH-59A NEW NH-47 SECOND CALL
Part A)Track work (including Formation work) required for Execution of part of PSSS GCT phase-I (deposit work) Part B)Civil works (Minor Bridge extension, RCC Pathway, RCC drain) required for Execution of part of PSSS GCT phase-I (deposit work)
Execution of Earthwork Minor Bridge Supply of Point and Xing P Way Fittings Supply and Spreading of track ballast execution of P Way works and other allied works in connection with Renovation of track and OHE at Govinda Siding of Jamuna Kotma Area
Restoration work of Road, Bridges and During the rain and after Rains under the Maintance under Sub Division Nagod Distt. Satna (M.P.)
Removal and Refixing of Pipe Railing on submersible Bridges under PWD Bridge Sub Division Khargone. Distt- Khargone, Badwani, Alirajpur and Jhabua. (MP)
Zonal Tender for Annual patch Repair and Maintance of Roads bridges and culvert under pwd dn no 1 jbp( length 143.43 K.m.)
Construct RCC channel for releasing of rain water at Vindhyachal nagar located near covered nalla bridges under ward 6 of zone 2.
Construct RCC channel for releasing of rain water at Ramchandra nagar located near covered nalla bridges under ward 6 of zone 2.
Custom Bid for Services - PROVIDING SERVICES FOR AMC OF ELECTRONIC STATIC WEIGH BRIDGES Similar Category Customized AMC/CMC for Pre-owned Products