Loading…
Loading…
3,204 results • Best match
Zonal Tender for annual patch repair and maintenance of roads, bridges and culverts under division no. 2 Jabalpur.
Survey and Investigation work and Preparation of GAD for the Construction of Proposed Bridges under Sub-Division Shivpuri
PREPRATION OF D.P.R. AND SURVEY FOR RIVER BRIDGES ROBS AND FLYOVERS IN DISTRICT MANDSAUR UNDER SUB DIVISION MANDSAUR
Survey and Investigation work and Preparation of GAD for the Construction of Proposed Bridges under Sub-Division Gwalior
ANNUAL REPAIR WORK FOR EXISTING BRIDGES AND APPROACHES IN DISTRICT AGAR MALWA UNDER PWD BRIDGE SUB DIVISION SHAJAPUR
Annual Repair works of bridges works, protection works and approaches road under PWD Bridge sub division-2 Bhopal
Repair and Rehabilitation work of Poor and very Poor bridges other than RAMS under Rewa Division Group I
Renewal of channel sleepers using H-Beam in girder bridges under the jurisdiction of Sr.DEN/North/BPL section.
Shifting and Height Maintained of Poles of LT, 11KV Line at ROB Ordinance Factory At Katni South Section(687Mtr.) Distt. Katni (M.P.)
CONSULTANCY SERVICES FOR FEASIBILITY STUDY AND PREPARATION OF TENDER DOCUMENT OF 1 ELEVATED CORRIDOR, 1 ROB AND THREE FLYOVERS IN INDORE CITY
Pole Shifting and Dismentaling of 11 KV LT line Pole and Transformer shifting and construction ROB Level Crossing 273 Gulabganj Dist Vidisha
Construction of ROB in lieu of Level Crossing no. 451 at Km 1265_12-14 on Gwalior-Dholpur section under North Central Railway
Pole Shifting and Dismentaling of 11 KV LT line Pole and Transformer shifting and construction ROB Level Crossing 279 Gulabganj Dist Vidisha
Ratlam Division (1) UJN - Electrical work in connection with provision of one 6 meters wide FOB with cover with ramp between PF01 and PF08 located at BPL end (Simhastha 2028). (2) UJN - Electrical work in connection with provision of one 6 meters ... wide FOB with ...
ANNUAL REPAIR WORK FOR THE YEAR 2020-21 UNDER PWD BRIDGE CONSTRUCTION SUB DIVISION NOWGONG (M.P.) - 2nd Call
FOR BORING WORKS AT RIVERS AND NALA UNDER PWD BRIDGE CONSTRUCTION DIVISION REWA UNDER SUB DIVISION SATNA
FOR BORING WORKS AT RIVERS AND NALA UNDER PWD BRIDGE CONSTRUCTION DIVISION REWA UNDER SUB DIVISION SHAHDOL
FOR BORING WORKS AT RIVERS AND NALA UNDER PWD BRIDGE CONSTRUCTION DIVISION REWA UNDER SUB DIVISION REWA
FOR BORING WORKS AT RIVERS AND NALA UNDER PWD BRIDGE CONSTRUCTION DIVISION REWA UNDER SUB DIVISION SIDHI
auction of various unserviceable Scrap Matrial kept in Public Works Department Bridge Construction Sub-Division Satna Store
Annual Repair Work for the years 2026-27 under PWD Bridge Construction Sub Division Khandwa Distt. Khandwa.
Construction of new CC Road Drain bhth side Foot path WS Line Central Lighting and Electrical pole shifting Minor Bridge Box Culvert and Hume pipe Culvert at Ambe Mata Temple to Retired Colony Ratlam as per Estimate
Construction of Submersible Bridge Including Approach Road Across Kshipra River Parallel to Existing Bridge Connecting Kaal Bhairav Temple to Gadhkalika Road I/c Electrical Pole Shifting of H.T./L.T. Line and Street Lighting Work District Ujjain.
Repairing and maintenance of Rawanwara Road Culvert And providing RCC Platform near approach of RUB Road underRWA-CDA Sub Area under Pench Area.
Additional work of widening of approaches, Providing, Fixing of median/New jersey type divider and various other necessary work in newly constructed ROB.
PROVIDING HEIGHT RAISING AND SHIFTING OF HT (33/11 KV LINE) LT LINE AT ROB ALIGNMENT NO 323 LAMTI PHATAK PANAGER DISTRICT JABALPUR.
Shifting Installation of 33 KV, 11 KV, LT line Transformer in Middle Itarsi-Powerkheda station Railway Crossing 226 Itarsi-Sonasawari ROB Dist- Narmadapuram
Shifting Installation of 33 KV, 11 KV, LT line Transformer in Middle Itarsi -Powerkheda station Railway Crossing 226 Itarsi-Sonasawari ROB Dist- Narmadapuram
PROVIDING POLE SHIFTING WORK OF 33 KV, LT LINE TRANSFORMER FOR NEWLY CONSTRUCTED RAILWAY OVER BRIDGE(ROB) SALAIYA PHATAK UMARIYAPAN AT DISTRICT KATNI
BT RENEWAL WORK FOR EXISTING BRIDGE AND APPROCH IN PWD SETU SUB DIVISION UJJAIN UJJAIN DEWAS ROAD ROB AT ETAWA IN DEWAS CITY
Providing External Illumination Work in ROB at Ordinance Factory Katni Near Katni South Station (L.C. No.355A, 687.50Mtr. In Length) Distt. Katni(M.P.)
Supply and Installation of Decorative LED type strip light on existing Street light Poles on Bridges in Indore under IMC
Annual Maintenance work of Bridges for year 2025-26 under PWD Bridge Sub Division Khandwa. Distt- Khandwa and Burhanpur
MAINTENANCE OF CULVERTS AND BRIDGES ON DINARA PICHHORE CHANDERI MUNGAWALI BANGLA CHOURAHA, MELUA CHOURAHA LENGTH KM 100 TO 190
Construction of balance work of Roads, Bridges and Causeways under Khargone Lift Canal as per detail scope of work.
Operation of Passenger Boarding Bridges (PBBs), Advanced Visual Docking Guidance Systems (AVDGSs) etc. for 3 Years at Khajuraho Airport
CIVIL ,REPAIR AND BEAUTIFICATION WORK AT MAJOR INTERSECTIONS, ROADS, MARKET PLACES, BRIDGES, RIVER SIDES ETC. (PACKAGE -I) SECOND CALL
CIVIL ,REPAIR AND BEAUTIFICATION WORK AT MAJOR INTERSECTIONS, ROADS, MARKET PLACES, BRIDGES, RIVER SIDES ETC. (PACKAGE -II) SECOND CALL
Survey and Investigation work and Preparation of GAD for the Construction of proposed bridges under Sub-Division Bhind (M.P.)
Survey and Investigation work and Preparation of GAD for the Construction of proposed bridges under Sub-Division Shivpuri (M.P.)
Survey and Investigation work and Preparation of GAD for the Construction of proposed bridges under Sub-Division Gwalior (M.P.)
Construction of Bridge on Tagadi to Bankalpur Road in Km 1/10 and 2/6 under Sub Division Chanderi Division Ashoknagar (MP)
Development of internal roads, Construction of bridge for second entry including approach roads and other facilities in Sheesh Mahal Campus at Orchha.
Construction of Bridge at Gurjanghat of Two Connecting Dhara of Dhasan River between Village Kutora District Chhatarpur and Village Kakarwaha District Tikamgarh.
Repairing of approaches of minor bridge, culverts etc. under H.Q. No. 2, section Sub Dn. Narmadapuram. 2nd Call, PAC Rs. 19.82 Lacs on Road Bridge SOR 25.03.2022 (Ammendment upto date), Completion period 60 days i/c rainy season.
Survey Investigation and Boring Works For Proposed Bridge and DPR Work On Pwd Bridge Construction Sub- Division Jabalpur
Construction of Submersible Bridge Aross Kshipra River From Durga Das Ki Chhatri to Gonsa Village (Ranjeet Hanuman Mandir) Approch Road Including Electrical Pole Shifting and Street Lighting of HT/LT Line, Xmer And High Mast. District Ujjain
REMOVING AND REFIXING OF ORNAMENTAL RAILING PIPE RAILING BEFORE AND AFTER RAINS INCLUDINGTRANSPORTATION FROM BRIDGE TO STORE AND SECURITY IN RAINY SEASON AND REPAIRING AND MAINTANCE OF SUBMERSIBLE BRIDGE RAILING ETC OF PWD SETU SUB DIVISION UJJAIN
Construction of High Submersible Bridge Across Lakhunder River on at Bagula Mukhi Mata Mandir, M.P. Including External Electrification and Overhead Lines Shifting and Height Increasing of LT/11KV/33KV Lines With Area Lighting Work District Agar-Malw
Painting work on Guard wall, Parapet wall AND Railing of Culverts Bridges in Mandla- Dindori stretch on N.H.543