Loading…
Loading…
935 results • Best match
For Construction of Bridge with 3x8 Mtr 2 Span Bridge onLink Road Kauli to Baran via Palondian Gurudwara Nim Sahib M.C. and District Patiala. Code PTA24049
NEW CONSTRUCTION OF 7mtr 3 span RCC Bridge AT LINK ROAD KATHGARH-RATTEWAL ROAD TO Balachaur Rattewal road via KUTIA SWAMI GANGA NAND up to Neelewal road. MC Balachaur Distt. SBS Nagar NSR(SBSN)024-019 Time 6 Months
Upgradation of Dhuri Mullowal road, Dhuri Bagrian road and Ludhiana Malerkotla Sangrur road (Section Sangrur ROB Portion and its service lanes) including Main. of road for 3 years
Construction of ROB and its Approaches in lieu of Level Crossing No. B-50 at KM 37/770 on Jalandhar Cantt. Hoshiarpur Line, Hoshiarpur in State of Punjab.
Modernization of Rural Link Roads and Bridges falling under MC Jagraon and Raikot District Ludhiana. Including 5yr routine maintenance. Group no 06. LDH2026-21
Estimate for clearance of sarkanda, weed, jala, booti from various bridges of East Bein under jurisdiction of Sub Division Head Quarter in distt jalandhar.
Construction of 52 mtr. Span new H.L. RCC bridge including approach road on 100 feet wide road dividing Sector 62/63, S.A.S Nagar near PSEB and retrofitting of existing bridge adjacent to new proposed H.L. bridge including maintenance for five years
CABINET FOR EQUIPMENT CONTROL PANEL, as per Drawing: EPS.VSDA.RK-2022041044 ALT R1, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. T
MOUNTING ARRANGEMENT OF ROLLING SHUTTER FOR LOWER DECK, as per Drawing: LD56236, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE
STABILIZER ASSEMBLY FOR VANDE BHARAT COACHES, as per Drawing: 72705003 ALT. 'NIL', Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. TH
BRACKET, as per Drawing: 3 10113.0.30.095.188, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED WITH ADEQUAT
STABILIZER ASSEMBLY FOR VANDE BHARAT COACHES, as per Drawing: 72705003 ALT. 'a', Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE
FERRITIC STEEL SHEET 10X1250X3000MM., as per Drawing: RDSO SPEC NO.C-K201GRADE X2CRNI12 (409M)., Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRA
SET OF SKIRTINGS FOR LHB COACHES, as per Drawing: MPLLHBSKIRTING VERSION 1, Packing Instruction:PI042 VER1.0, AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATI
Construction of 2 No H/L Bridges on Dashmesh Nagar to Malowal road and Nariangarh to Jabowal Road in Assembly Constituency Jandiala Guru NABARD XXVIII
Repair, Construction and Widening of Carriageway of Bridges and Culverts on link roads falling under Sub Division No-2 Mohali, MC Kharar Distt SAS Nagar
Annual Mainteance various Pantoon Bridges including launching and D-launching over River Beas and Kahnuwan Swamp Drian for the year 2023-24 in District Gurdaspur
Painting of steel girder bridges 5-A UP, 5-A DN in LDH-JRC section of FZR division under jurisdiction of SSE/Br/M/JUC
Repair/Widening/Replacement of Culverts and Bridges on Rabbon Nichi to Lassoi upto MC Limit at RD 1.20 Phase-II in M.C Maloud Group-3
Annual Maintenance of various Pantoon Bridges including launching and D-launching over River Beas falling under Construction Division Batala in District Gurdaspur under Head 3054
ANNUAL MAINTENANCE OF VARIOUS PANTOON BRIDGES IN PROVINCIAL SUB DIVISION, PWD B and R BR., PATHANKOT FOR THE YEAR 2019-20 (5 Nos. Pantoon Bridge)
Restoration of damaged Railings and Painting of M.S railing of various Bridges/Superpassages between RD 17500 Mtr to 33820 Mtr of Anandpur Sahib Hydel Channel year 2022-23.
Supply Testing and Commissioning of CMAC Videolaryngoscope NO.1,2,3 and D blade with monitor and fibreless untubating bronchoscope with Video laryngoscope monitor (Adult FOB and 3.5 and 2.8 Pediatrics) 1 QTY for HBCHRC New Chandigarh Mohali Punjab
DNIT for Shifting of WS and Sewerage lines and all other works contingent thereto for construction of RUB in lieu of level crossing no 134 A ICL crossing Shambo Rajpura Section
Disposing of Rain water of RUB at KM 168/12-13 on RJP-BTI Section on Ring Road Phase-I from NH-7 to ITI Chowk Mansa Road Bathinda (3rd Invitation)
ELECTRONICS EQUIPMENT RACK, as per Drawing: LA64213 ALT c, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED
SET OF LUGGAGE RACK FOR MEMU3PH COACHES, as per Drawing: MPLLRMEMU3PH VERSION 0, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE
ELECTRONICS EQUIPMENT RACK, as per Drawing: LA64213 ALT NIL, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKE
SET OF SKIRTINGS FOR LHB COACHES, as per Drawing: MPLLHBSKIRTING VERSION 1, Packing Instruction:PI042 VER 1.0, AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTAT
SET OF SKIRTINGS FOR LHB COACHES, as per Drawing: MPLLHBSKIRTING VERSION 1, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM
WARDROBE COMPLETE FOR GUARD'S ROOM, as per Drawing: LP64154 ALT 'a', Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD
SET OF SKIRTINGS FOR LHB COACHES, as per Drawing: MPLLHBSKIRTING VERSION 1, Packing Instruction: PI042 VER1.0, AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTAT
SET OF LUGGAGE RACK FOR MEMU3PH COACHES, as per Drawing: MPLLRMEMU3PH VERSION 0, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE
SET OF SKIRTINGS FOR LHB COACHES, as per Drawing: MPLLHBSKIRTING VERSION 1, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM
BRACKET (SS), as per Drawing: 3 10113.0.76.095.003 ALT AR, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED
BRACKET (SS), as per Drawing: 3 10113.0.76.095.003 ALT AR, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED
BRACKET (SS), as per Drawing: 3 10113.0.76.095.003 ALT AR, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED
WARDROBE COMPLETE FOR GUARD'S ROOM, as per Drawing: LP64154 ALT 'a', Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD
WARDROBE COMPLETE FOR GUARD'S ROOM, as per Drawing: LP64154 ALT 'a', Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD
RECONSTRUCTION OF 26M TRIPLE SPAN RCC BRIDGE AT RD 59460 VILLAGE HERON KALAN ON BAHADUR SINGH WALA DRAIN ON LINK ROAD MATTI BHIKHI DHANAULA ROAD TO CHEEMA UPTO DISTRICT BOUNDARY, BLOCK BHIKHI, DISTT. MANSA. UNDER PMGSY- III (BATCH-2) PB-11-307
Engagement as consultant for evolving design for the work of construction of bridge/two number box culverts over the Siswan River on VR-6 road at New Chandigarh, Mullanpur
Conrete lining of Dayalpura Disty from RD 18945-36000, laying of undergroung pipeline from RD 36000-37600 and remodeling of bridges RD 20500, 22100,31600 and 36000
Painting of 2 No Steel Bridges on Sri Anandpur Sahib to Sri Naina Devi road Length of Bridge Under Head 3054 for the Year 2022 23
Widening/Repair/Reconstruction of Various Narrow/damaged bridges and culvers on link road falling in MC Badhni Kalan (200 Crore Project Phase-II) Gr. No.1
Widening/Repair/ Re-construction of various narrow/ damaged bridges and culverts on link road falling in MC Moga ( 200 Crore Project Phase-II) Group No. 1
MIRROR HOLDER LH, as per Drawing: LW62125 ALT b, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION.THE ITEM SHOULD BE PACKED WITH ADEQUA
SET OF DOORWAY PARTITION FOR MEMU/DMC/3PH COACHES, as per Drawing: MPLDWPMEMU3PH VERSION 0, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORT
FUNNEL FOR SLR COACHES, as per Drawing: LB64140 (COLOUR SHADE RAL-9006, MD46271 DT 18.01.2021), Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANS
MIDDLE CEILING SUPPORT FOR LHB FIRST AC COACHES, as per Drawing: LA44309, Packing Instruction: PI042 Ver 1.0, AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATI