Loading…
Loading…
935 results • Best match
PLAIN WASHER FOR CLEVIS PIN 36, as per Drawing: ISO8738 MATERIAL TO St52, COATING AS PER MDTS-057, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TR
FLOOR END PROFILE J SKIRTING,L=2M FOR LHB AC 3TIER ECONOMY COACHES., as per Drawing: ED41003 ALT NIL, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING
SET OF MOUNTING ARRANGEMENT OF SAFETY WALLS FOR LHB AC 3-TIER COACH, as per Drawing: MI007399 ALT NIL, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURIN
HEX NUT M22, as per Drawing: IS:1364(PART-3)-1992,6 COATING AS PER MDTS-057, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM
STEPPED GROMMET M 20, as per Drawing: SIMILAR TO CAT. NO. STM 20 M/S HENSEL OR EQUIVALENT, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTA
SPLIT PIN 8X45, as per Drawing: IS:549-2005 St34 COATING AS PER MDTS-057, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SH
SPLIT PIN 4X36, as per Drawing: IS:549-2005 St34 COATING AS PER MDTS-057, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SH
HEX NIPPLE 25 BORE, as per Drawing: IS:1239(PART-2)-1992 TABLE-28 THREADS ISO7-1, AISI304, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTA
MALE & FELMALE ELBOW 1 1/2" A4, as per Drawing: IS:1879-2010, (SEC 2), TAB-4, AISI304., Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTAT
SPLIT PIN 5X40, as per Drawing: IS:549-2005 St34 COATING AS PER MDTS-057, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SH
SPLIT PIN 10X63, as per Drawing: IS:549-2005 St34 COATING AS PER MDTS-057, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM S
NYLOC NUT M24 HIGH TENSILE, as per Drawing: IS:7002-1991/DIN982, 10, COATING AS PER MDTS-057, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPO
HEX NIPPLE 25 BORE, as per Drawing: IS:1239(PART-2)-1992 TABLE-28 THREADS ISO7-1, AISI304, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTA
BALL VALVE 1/2", as per Drawing: LW63106 ALT a ITEM 3, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED WITH
BALL VALVE 1", as per Drawing: LW63106 ALT a ITEM 5, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED WITH A
HT COMPARTMENT SS HATCH DOOR, as per Drawing: MEMU/DMC/3PH-9-0-015 COL- I, Packing Instruction NO.PI042 VER1.0: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTA
PUNCHED WASHER A30, as per Drawing: IS:2016-1967, MATERIAL STEEL TO IS:2062, COATING AS PER MDTS-057, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING
PLAIN WASHER FOR CLEVIS PIN 36, as per Drawing: ISO8738 MATERIAL TO St52, COATING AS PER MDTS-057, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TR
S&T works in c/w (i) construction of two no. RCC box bridges of size 3.00mX2.50m each at Km 505/4-6 on JUC-ASR section and OHE 6/9-11 on ASR-PTK section by municipal corporation, Amritsar (pushing method for crossing of water pipe) in the ... of ROB at ...
S&T works in c/w (i) construction of two no. RCC box bridges of size 3.00mX2.50m each at Km 505/4-6 on JUC-ASR section and OHE 6/9-11 on ASR-PTK section by municipal corporation, Amritsar (pushing method for crossing of water pipe) in the ... of ROB at ...
S&T works in c/w (i) construction of two no. RCC box bridges of size 3.00mX2.50m each at Km 505/4-6 on JUC-ASR section and OHE 6/9-11 on ASR-PTK section by municipal corporation, Amritsar (pushing method for crossing of water pipe) in the ... of ROB at ...
S&T works in c/w (i) construction of two no. RCC box bridges of size 3.00mX2.50m each at Km 505/4-6 on JUC-ASR section and OHE 6/9-11 on ASR-PTK section by municipal corporation, Amritsar (pushing method for crossing of water pipe) in the ... of ROB at ...
Construction of Approaches to ROB in lieu of Level Crossing No. A-2/E-2 on Chaugiti Ladhewali Road crossing Jalandhar-Pathankot Railway Line in district Jalandhar, Punjab (excluding Railway Portion) on Lump-Sum Basis.
Appointment of Technical Consultant for carrying out Consultancy Services for Construction Of two Lane ROB with footpath on Sheron Distributory adjoining Level Crossing 62-A on Rajpura Bathinda Railway Line at Dhuri town District Sangrur.
Widening Of Narrow Bridges 2 Span 5.107 M Each Over Bist Doab Canal Crossing Link Road Pachnangal Bridge to Chela Including Approaches And Replacement Of Slab. MC Garhshanker Distt. Hoshiarpur
Estimate for arranging machinery for removing Water Hyacinth (Jungle booti) from Bridges at RD 5790, 19076, 27125, 31236, 36832, 48770 and 55413 of Ferozepur Feeder for the year 2025-26
Widening Of Narrow Bridges 2 Span 5.107 M Each Over Bist Doab Canal Crossing Link Road Ajnoha To Baddon Phirni, Including Approaches And Replacement Of Slab. MC Garhshanker Distt. Hoshiarpur
Design and Construction of Approaches to RUB in Replacement of Level Crossing No. 292A at Km 168/12-13 of Rajpura-Bathinda Railway Line on Ring Road Near ITI Chowk, Bathinda in the State of Punjab.
STRAIGHT METRIC END FITTING, M25, as per Drawing: RDSO/PE /SPEC/ AC/0138 -2009 Rev '1', A-5, S.No.-7, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING
FLOOR SKIRTING PROFILE, L=3M FOR VANDE BHARAT COACHES, as per Drawing: TS/DTC-4-1-003 ALT nil, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSP
HEX HEAD BOLT M20X80 HIGH TENSILE, as per Drawing: IS:1364(PART-1)-1992-8.8, COATING AS PER MDTS-057, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING
ALUMINIUM FLOOR SKIRTING PLATE FOR MEMU/3PH LENGTH 3.7 METERS, as per Drawing: DMU/TC/SS-4-2-009, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRA
HASP AND STAPLE 90MM, as per Drawing: IS:363-1976 TAB.2 FIG.1, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PAC
ALUMINIUM FLOOR SKIRTING PLATE FOR MEMU/3PH LENGTH 3.7 METERS, as per Drawing: DMU/TC/SS-4-2-009, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRA
LOCKERS FOR CREW COMPARTMENT FOR HOT BUFFET AMRIT BHARAT COACHES, as per Drawing: LWCB/PP-6-4-005 alt a, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DUR
REDUCING SOCKET S3 3/4" X 1/2", as per Drawing: ISO 4144:2003 FIG. 8, TABLE -10, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE
ELBOW 40 BORE X 135 DEG., as per Drawing: IS:1239(PT.2)92TAB16AISI 304, THREADS TO ISO7/1., Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORT
HEX HEAD BOLT M20X220 HIGH TENSILE, as per Drawing: IS:1364(PART-1)-1992, 8.8, CE, COATING AS PER MDTS-057, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB
SPLIT PIN 5X32 ELECTROPLATED TO IS:1573-86 SERVICE GR 2 TAB 2, as per Drawing: IS:549-1974, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORT
ALUMINIUM FLOOR SKIRTING PLATE FOR MEMU/3PH LENGTH 3.7 METERS, as per Drawing: DMU/TC/SS-4-2-009, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRA
MILD STEEL PIPE 25MM MEDIUM PLAIN END GALVD., as per Drawing: IS: 1239 (PT-1) 2004, TAB-4 (ERW), Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRAN
HEX NUT M 6, as per Drawing: IS:1364(PART-3)-1992,6 COATING AS PER MDTS-057, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM
HEX HEAD BOLT M16X130 HIGH TENSILE, as per Drawing: IS:1364(PART-1)-1992-10.9, COATING AS PER MDTS-057, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURI
ELBOW 40 BORE X 135 DEG., as per Drawing: IS:1239(PT.2)92TAB16AISI 304, THREADS TO ISO7/1., Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORT
PA SYSTEM FOR LHB AC 2T/3T COACH, as per Drawing/Specification : EDTS173,REV-B,COR-2,TYPE-III, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANS
MILD STEEL PIPE 25MM MEDIUM PLAIN END GALVD., as per Drawing: IS: 1239 (PT-1) 2004, TAB-4 (ERW), Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRAN
HEX HEAD BOLT M16X130 HIGH TENSILE, as per Drawing: IS:1364(PART-1)-1992-10.9, COATING AS PER MDTS-057, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURI
ALUMINIUM FLOOR SKIRTING PLATE FOR MEMU/3PH LENGTH 3.7 METERS, as per Drawing: DMU/TC/SS-4-2-009, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRA
LOCKERS FOR CREW COMPARTMENT FOR HOT BUFFET AMRIT BHARAT COACHES, as per Drawing: LWCB/PP-6-4-005 alt a, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DUR
DOG BOX ARRGT. IN GUARD ROOM FOR LHB SLR AMRIT BHARAT COACHES., as per Drawing: LSLRD-6-4-006, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSP