Loading…
Loading…
935 results • Best match
Providing Laying of UPVC pipe sewer (Dismantled due to Construction of ROB by BR Department) including the cost construction of brick masonry manhole chamber complete in all respect and all other works contingent thereto at Anand Nagar at Kotkapura
Widening and Reconstruction of existing Two Lane Carriageway to Four Lane with Paved Shoulder in Makhu Town from km. 170.000 to km. 171.900 including ROB at km. 171.387 of NH-54 in the State of Punjab on EPC mode.
Construction of 5 No. H.L Bridges (75.35,30.14,26.14,26.14,22.32 m long) over Patiala ki Rao Nadi Crossing Nayagaon Tanda Tandi L/R at RD 5.25,5.58,6.05,6.35,6.55 Km in Distt. SAS Nagar including approaches (under NABARD RIDF XXVIII)
Six laning of Panipat-Jalandhar section of NH-1 (new NH-44) from Km. 96.000 to Km. 387.100-Construction of 6 nos. of Foot Over Bridges at various locations in the State of Punjab
Modernization Const. Of Bridges of various Span in MC Dhuri and Sherpur, Halqa Dhuri, Distt. Sangrur (Special Assistance to states for Capital investment 2026-27 Funds, Part-II) Gp-08 W.C. Sgr 2026-092
Planning design and Const of HL Steel Bridge over Narvana Branch Canal and 2 No. Box Cell HL Bridge over Minor Canal in Replacement of Existing Old Bridges on Patiala-Fatehgarh Sahib-Chamkaur Sahib-Bela (MDR-31) Road From Km 1.250 to 29.551
Estimate for Cement Concrete Lining of Jandwala Link Channel (With 20 Percent Enhancement) Slice Rd 0-12100 Including Construction of VR Bridge at RD 0/40, Drainage Crossing at RD 7310 and Construction of Bridge at RD 7273.
Construction Bridges culverts on various Link Roads under special assistance to state under capital investment 2026-27 from Earth Work upto Premix Carpet culverts Drains Ret.Walls With 5YearMaintenance MC and Distt Pathankot Gr 02
Construction of link between already constructed three-legged elevated rotary on Amritsar Taran Taran road MDR103 to Amritsar Bhikhiwind Khemkaran road NH 354 in district Amritsar Punjab ic Construction of ROB near closed LC No C 11 at KM 701 Betwe
Construction of approaches including box culvert of ROB 1x48 Mtr. Bow String Girder at Km 7/0-1 on Ludhiana- Dhuri section between missing link-II PartA and Part B, Manned Crossing No.-5A/2E, including Public Health, Electrical and Horticulture
Construction of Approaches to ROB in lieu of Level Crossing No.C-167 on Ambala-Ludhiana Section at KM 357/19-21 between Doraha-Sahnewal Railway Station Crossing Rampur Kalan to Kanetch Road in the State of Punjab Excluding Railway Portion
Construction of Approaches of 2 Lane ROB at level X-ing No.1-A on Rajpura Bathinda Rail Section of Northern Railway falling on Old G.T.Road Rajpura Distt. Patiala, inclusive Service roads, Drain and Retaining wall, Miscellaneous works, electrical wor
CS FOR FS DETAILED SURVEY/INVESTIGATION PREPARATION OF GAD DETAILED PR FOR CONSTRUCTION OF 4 LANE ROB IN LIEU OF RC NO A 8 A at KM 3.600 on NH 154 (PATHANKOT KULLU ROAD) DISTT PATHANKOT IN THE STATE OF PUNJAB
Balance work of ROB and Other Associated Works of Four Laning of Ludhiana to Talwandi Section of NH-95 from km 92.000 to km. 170.000 of old NH-95 (new NH-05) in the State of Punjab (Part-2) (2nd Call).
4 Lane Elevated Highway between Samrala Chowk (Design Chainage km 0.000) to Ludhiana Municipal Limit (Design Chainage km 12.951) of NH-95 in the State of Punjab-Replacement of Expansion Joints of existing Flyovers/ROB from km 1.570 to km 5.010
(Bridge Work) (Work Code TT-2022-18)
Construction of 2 No single span bridges 7.50 Mtr each Eff. Skew over warring drain and 8.00 Mtr each Eff over sarainaga drain Xing Kotkapura Shri Muktsar road including approaches in District Shri Muktsar Sahib
Widening of Narrow Bridges 2 Span 5.107 M Each Over Bist Doab Canal Xing Link Road Garhshanker Mehtiana Road to Binjon Reehla, Including Approaches and Replacement of Slab MC Garhshanker, Distt. Hoshiarpur Under NABARD XXV
Tender for the Construction of 3 mtr single span on link road Boundli to Samrala Jhar Sahib road. MC Samrala District Ludhiana. (Widening/ Upgradation of Narrow Culverts and Bridges Project 400 Crore) Phase-I.LDH2021-173
Modernization of Bridges and Culverts Falling on link roads in MC Baghapurana and Nihal singh wala District Moga (INCLUDING CONSTRUCTION OF APPROACH ROAD PREMIX WORK AND ROAD FURNITURE ETC.) GROUP NO.16 Work Code 26021
Desilting Clearing of Sarkanda, Weed, Jala, Booti and other obstructions etc from U S and D S of bridges of Budha Nallah in between RD 99620 to 156000 down stream Ludhian city reach by Machinery
Strengthening of bandh on the left side of the Patiala Ki Rao by Constructing revetment of boulder stone crates to protect nearby abadies of Nayagaon ( RD 35400 to RD 36400 D/S of Nada Bridges ).
Widening of Narrow Bridges 2 Span 5.107 M Each Over Bist Doab Canal Xing Link Road Garhshanker Mehtiana Road to Binjon Hospital, Including Approaches and Replacement of Slab MC Garhshanker, Distt. Hoshiarpur Under NABARD XXV
Construction Bridges culverts on various Link Roads under special assistance to state under capital investment 2026-27 from Earth Work upto Premix Carpet culverts Drains Ret.Wall With 5YearMaintenance MC and Distt Pathankot work code PTK2026009 Gr08
Construction of 4 Lane VUP at Km 34.420, Flyover at Km 35.940 and 2 nos. FOB at Km 34.890 and Km 37.045 on Ambala-Chandigarh section of NH-22 (New NH-152) from Km 33.800 to Km 37.100 in the State of Punjab on EPC mode
Clearance of sarkanda weed jala, booti etc. from the u/s side of 8 no. bridges of East Bein.mandala channa- mandala bridge null bridge jalalpur bridge nawapindkhalewal bridge phull-kudoowal bridge nawapinddonewal bridge saraikham-malsian bridge
Construction of bridge over existing drain in village Jhinjri b/w Houdi No. JML-5 and JH-11 for work of lift irrigation sheme of villages Thapal , Muhewal, Jhinjri and tarapur in changar area of the Shri Anandpur Sahib Block
Widening of Narrow Bridges 2 Span 5.107 M Each Over Bist Doab Canal Xing Link Road Garhshanker Mehtiana Road to Binjon Pandori Ladha Singh, Including Approaches and Replacement of Slab MC Garhshanker, Distt. Hoshiarpur Under NABARD XXV
TENDER FOR Construction of 3 mtr Span Slab Culvert at link road DHR road Rattowal Tusse Leelan, MARKET COMMITTEE MULLANPUR DISTRICT LUDHIANA. (Widening/ Up gradation of Narrow Culverts and Bridges Project (200 Crore) Phase-II LDH2021-04
CONST OF HL BRIDGE 33 SPAN 36.00 MTR EACH OVER SATLUJ RIVER IN DISTT RUPNAGAR AND SINGLE SPAN STELL BRIDGE OVER BIST DOAB CANAL NEAR VILL. PANYALI IN DISTT SBS NAGAR INCLUDING APPROACHES OF BOTH THE BRIDGES
A) Schedule for the work of 'Cleaning and Desilting of drains including catch water drains and removal of Muck Garbage night soil etc. for KYN-KJT, PNVL-KJT and NRL- MAE Section' under ADEN(Track)Kalyan. B) (a) bridge waterway cleaning and removal of ... from bridges to ... of bridges of ...
Construction of one no. minor Bridge i.e. Br.No.1A with provision of twin RCC Box of internal size (4.60Mx2.10 M) by Box Pushing technique and other balance works of Ludhiana Yard remodelling i.e. extension of high level passenger platform, drainage work, CC, footpath, hydrant works, discharge wells and other misc. civil and Pway works in connection with Ludhiana -Mullanpur doubling in Ferozepur division over Northern Railway.
Repair of Bridges on various link roads in MC Morinda Distt. Rupnagar 1. SYL Canal Bridge 42 Meter on MC Bela Road to Chotti Rouni Barri Rouni 2. SYL Bridge on Kalheri Badwali Nanowal Section Lachhmangarh Group - II
Construction of ROB and its Approaches in lieu of LC No. 115-B/2T at KM 140/7-8 and at (T.P) 140/11-12 between Tapa-Rampura Phul Railway Stations on Dhuri Bathinda Section at Rampura Phul District Bathinda in the state of Punjab
Construction of Approaches to ROB at KM 330(09-11) and LHS at KM 331(13-15) in lieu of LC No. C 154 on UMB-LDH Rail Section Near Markfed and Sohna Industries, Khanna in the State of Punjab on EDFC.(Excluding Railway Portion)
RECONSTRUCTION, OF MAJOR BRIDGE 6 SPAN 8.42 MTR. EACH ON CHAND BHAN DRAIN X-ING OF L/R BHULLAR TO RUPANA M/C DISTT. SRI MUKATSAR SAHIB
Modernization of L/R and Bridges falling under MC Mullanpur, Jagraon and Sidhwanbet Distt. Ludhiana (earth work upto PC including constr. of culverts, side drains and road furniture etc.)Including 5 yr routine maintenance etc(G.no.12)LDH2026-20
Clearing weed (carpet grass, elephant grass), booty (water hyacinths), sarkanda(tripidium bengalense), silt, and obstruction etc from u/s and d/s of various bridges on Basouli choe near villages Amlala, Khazoor Mandi etc from villages Basouli to Khaj
Tender for the Construction/widening of 4.88 mtr single culverts on link road Khanna Samrala road to Samrala Jhar Sahib road, MC Samrala Dist Ludhiana. (Widening/upgradation of Narrow culverts and Bridges Project 400 crore)Phase-I. LDH2021-151
Construction of H/L Bridges 15.56 M long over Khui Khera drain x-ing Fazilka to Malout Road (MDR-40) at RD 37200 including its approaches, road Diversion and protection work in district Fazilka (Under Head 5054 RB-10)
Construction of 3 nos. of Ramp Type Foot Over Bridges at various locations on Six laning of Panipat-Khanna section of NH-44 (old NH-1) from Km.96.000 to Km. 272.000 in the State of Haryana and Punjab
RE-CONST. OF MAJOR BRIDGE 6 SPAN 8.42MTR. EACH ON CHAND BHAN DRAIN X-ING TO BHULLAR TO RUPANA IN M.C SRI MUKATSAR SAHIB DISTT. SRI MUKATAR SAHIB
P/Laying Interlocking tiles under ROB near Karnail Singh Nagar Ward 16, P/L Interlock Tiles at Gali No. 8/2 in Balraj Nagar Bathinda Zone 8 and Raising of Interlocking Tiles in Street No. 20 Sanjay Nagar and Street near Bhola Palace Ward No. 22
Laying 20 mm thick open graded premix carpet with Seal Coat/BC in Zone No. 3 on Amrik singh Road, Vishal Nagar 45 ft Road Santpura road ROB to Canal, Street No.1,2,3 Mela Ram Road, Street No. 1,2,3 Aggarsain Nagar, Street No. 1 to 7 etc.
Estimate for removing obstruction/bottlenecks from bed/under bridges of River Ghaggar from RD 131628 to 58000 (Village Khanauri to Makror Sahib and spreading the earth removed (including clearing waterway u/s and d/s at BML Aquaduct at RD 460793
Removing of obstruction/bottlenecks from the bed/under bridges of river Ghaggar from vill. Khanuari to vill. Karail and Strengthening of bandhs on left side and right side of river Ghaggar by laying of EC bags and spreading the earth removed.
Estimate for removing obstruction/bottlenecks from bed/under bridges of River Ghaggar from RD 131628 to 58000 (Village Khanauri to MakrorSahib) and strengthening of banks on weak points by using earth removed and by using Ec bags filled with earth in
3. L I.T D.A.V School Road (13.06) D.B.P Gali Mand (2.82) L I.T street Mohinder (15.91) D.B.P Gali Sarwan (3.01) Cleaning of pound Back of Gurdwara Kalgidhar Sahib (20.98) Const. Nalla back Gurudwara Sahib (10.22) Repair bridges in M.C Limit (4.89)
Desilting,Clearing of Sarkanda, Weed, Jaala, Booti etc. from Budha Naalah in between RD 0 to 55000 Upstream Reach and Desilting,Clearing of Sarkanda, Weed, Jaala, Booti and Other Obstructions etc. from Upstream and Downstream of Bridges of Budha Naa
Strengthening of existing carriageway from Km 16.490 to Km 44.780 and Km 46.100 to Km 49.500 of Bathinda.Muktsar Sahib.Jalabad road NH.754 in the State of Punjab Length.31.640 km under Head 5054.01.01.337.03 Capital outlay on Road and Bridges Job No.