Loading…
Loading…
43,269 results • Best match
Construction of HL Major Bridge across river Baitarani at Km 105.080 and Rehabilitation of Bridge across river Deo at Km 90.850 of NH-220 in the state of Odisha on EPC mode.
Construction of HL Bridge on main road to mahadalittola on CH .95 km bhengadhar
Construction of HL Bridge over river Dhanua at 4.50km on Narada-Darada-dalakasati road
T01-SUNDARI TO BALCHANDA CONSTRUCTION OF HL BRIDGE AT CH-8.20KM NEAR SUNDARI VILLAGE
T01-SUNDARI TO BALCHANDA CONSTRUCTION OF HL BRIDGE AT CH-5.60KM NEAR BALCHANDRA VILLAGE
Construction of Rain Water Drainage at 13th Mile Near- CASFOS, Byrnihat, Steel Footpath along Bridge, Foot Over Bridge (FOB) at various locations, Service Road, Truck lay-by and Street light facility along the Project Highway
WORK OF SHIFTING OF LINES AND TRANSFORMERS ETC. FOR CONSTRUCTION OF FOOT OVER BRIDGE (FOB) AT GOVIND NAGAR, OPPOSITE SATYA UTSAV MANDAP (IN DEPOSIT SCHEME) UNDER THE JURISDICTION OF ELECT. URBAN DISTN. DIVISIONO-III, MORADABAD.
Balance civil work i.e. Earthwork in formation & extension of minor bridges at Rundhi Station in Mathura-Palwal section for running of python trains.
CONSTRUCTION OF MINOR BRIDGES ON CHIKALTHAN LONI BODHKHABAJARSAWANGI ROAD SH-219 AT KM 22/300,22/900,25/200,25/600, AND 29/800 TQ.KHULTABAD DIST.AURANGABAD
Construction of Minor Bridges on Local Nalla on SH-34 to Amgaon Bramhangaon Road MDR-40 Ch. 1/400 Tal. Wada, Dist. Palghar.
Restoration of Minor Bridges on Watur Jintur Aundha Basmath Road MSH 2 at ch 78/400, 82/400 and 84/800 Tq Aundha
Construction of minor bridges on SH-121 Nimbut Khandobachiwadi Gadadharwadi Galunchephata road ODR189 near Khandobachiwadi on Nira left canal, Tal. Baramati, Dist. Pune
Construction of Two Minor bridges on Chirane Hol Gorane Malich Walkheda Songir Rod MDR-15 km.6/00 to 7/500 Tal.Shindkheda Dist.Dhule
CONSTRUCTION OF MINOR BRIDGES IN KM 156/400, 168/00 AND 176/600 ON NAGAD BANOTI SOYEGAON FARDAPUR ROAD SH-24 TQ. SOYEGAON
Construction of two Minor Bridges on Bamni Mendhla Nala Road MDR-100 at KM 6/500 And 8/000 Tal. Ardhapur, Dist. Nanded.
Improvement and Upgradation of Road from Balichapori, Majuli to Bongalmara, Lakhimpur, including construction of two major bridges over Luit and Subansiri rivers on EPC mode under ASRIP
JAKHANIA TO BARGHAT ROAD IN KM 2 OF 3 x 6 M SPAN RCC MINOR BRIDGE REPAIR AND PROTECTIVE WORK
GAHWA TO SADHARI ROAD IN KM 2 OF 2 x 6 M SPAN RCC MINOR BRIDGE REPAIR AND PROTECTIVE WORK
Naigoan- Proposed sky walk 6 M wide connecting north FOB and MMRDA authority 's ROB
Repair of bridge top pot holes with PCC in 3 nos. CTR bridges 2 nos. Saphi bridges and one no. Damodar bridges under CHP CPP Piparwar Area.
Facade illumination of Foot Over Bridge at Ullan Bater Road
CE/EAP/ARRBP/OCB/Bridge1/Barpeta/29 Construction of Bridge in Barpeta district RCC Bridge on Bhulukadoba to kalbari Road
Construction of Bridge at KM 4.10 of Kalagam-Avudaiyar Koil road (MDR 603) across Poonaikuthi River
Construction of Bridge at KM 10.2 of Kalagam-Avudaiyar Koil road (MDR 603) across Ampuliyar River
construction of HL Bridge in the district of Kendrapara
M.W. 1.Reconstruciton of Minor Bridges at Km.43.2 and 43.10 of Visakhapatnam Ananthagiri Araku Road in Visakhapatam District 2.Reconstruciton of Minor Bridge at Km.48.4 of Visakhapatnam Ananthagiri Araku Road in Visakhapatnam District S.W. Hiring of Vehicle to the Deputy Executive Engineer R and B S.Kota.
OHE work in connection with the Provision of 2-lane road over bridge (ROB) in lieu of LC No: 135 & 188 of Kota division.
Pipe Railing Removal and Refixing of Existing work of Submersible bridge Under Bridge Construction - Sub Division Vidisha
CONSTRUCTION OF BRIDGES ON KANNAD BHARADI SILLOD BHOKARDAN ROAD SH-51 IN KM 62/800 TQ. SILLOD
CONSTRUCTION OF BRIDGES WITH APPROACHES ON JHODEGAON TO DOMEGAON ROAD VR-108 ON GALHATI RIVER TQ. AMBAD
Construction of Foot-Over-Bridge at RGB Road connecting Assam State Zoo and Shraddhanjali Kanan, Guwahati under SOPD(G) for the year 2021-22
Supply & Application of Composite High Voltage insulation coating on Betwa River Girder Bridge in VGLJ-MKP & VGLJ-CNB section, Sank River Girder Bridge & Asan River Girder Bridge in VGLJ-DHO section of Jhansi Division
PLACHITHODE SIDE PROTECTION NEAR KOZHIPARABAN ROAD AND FOOT BRIDGE CONSTRUCTION
Construction of Bridges on roads in ABD Area under Nagpur Smart City Project PackageV MNB-05B 08A MJB 06 12 Balance work of 10 Bridges
Foot Over Bridge near Guwahati-North Guwahati Ropeway Service, MG Road, Guwahati including O and M for 60 months.
(1)Bridge No.520/1- Replacement of PSC Girders, (2) Bridge No.527/1- Replacement of PSC Slabs, Construction of return walls, (3) Construction of bridges at Ch 214075 (Aqueduct), Ch 214217 (Syphon), Ch 215750 (Hydraulic) and Ch.225475 ... ( RUB ),(4)Construction ... of Major Bridges ,flooring ... wall, RUB outlet ... balance FOB ,COP,ROB,Height ... FOB,COP, ROB ,Height ...
General up-keeping / maintenance of Bridges Vented Causeway 50 Mtrs Span PSC Bridge over Balole Nallah near SKUAST, 18 Mtrs Span Steel Girder Bridge at Bhore Camp W.No. 1 and 2, Vented Causeway at Bhore Kothey 27 Mtrs Span Steel Girder Bridge at
Construction of Iron Girder Bridge on Sissamara River under Jaldapara Wildlife Division
Design and Construction of formation in embankments, cutting including blanketing, Major bridges, Minor bridges, RuB, ERS/retaining wall, sacrificial retaining wall, drains, boundary wall ,fencing works and Station boxes of Nagawara and Kanakanagar
Hiring of Consultants - Milestone/Deliverable Based - Conducting Geo-technical investigation, survey, preparation of GADs of minor bridges, major bridges/RUB/via-duct, Station/service building, SIP, Sectioning diagram & LOP, structural drawings of va..
Construction of Foot Over Bridge (FOB) at Village Garh Mirakpur and Kanwali Mor on UP-Haryana border to Rohna section of NH-334B (Pkg-I) from Km. 0.000 to km. 44.800 in the State of Haryana
Construction of 3x6.00 M Span RCC Minor Bridge, work in Patra Nala in Distt Gorakhpur Lot No-2/03
MAINTAINANCE WORK OF BRIDGE AND ROB OF BRIDGE CONSTRUCTION SUBDIVISION BETUL SUBDIVISION
Construction of Major Bridges, ROB at Vasai, Vehicle Subway, Minor Bridges, Drain and Earthwork in formation in connection with 5th and 6th line between Borivali Virar in Mumbai suburban section under MUTP IIIA
Construction of High Level Bridge at Km 4/2 of Vikkiravandy Nemur Road across Varaga River in lieu of existing causeway
Construction of High Level Bridge at Km 7/6 of Tindivanam Thengapakkam Road across Vairapuram River in lieu of existing causeway
REPAIR OF MAIN GIRDER BRIDGE ALUMINIUM FOR ENGR