Loading…
Loading…
43,246 results • Best match
Part A-TONHA BAIJNATH TO JOHAD Part B- Construction of HL Bridge
Construction of HL Bridge in Bahadurpur Amrauli Jagdishpur Road on Jamuari River
Construction of Foot Over Bridge (FOB) across Railway siding tracks at inside plant of NPGCL in connection with Construction of coal transportation system for Nabinagar Super Thermal Power Project (3x 660 MW) of NPGC Ltd
Construction of Foot Over Bridge at Hanuman Mandir, G.S. Road, Guwahati under SOPD (G) for the year 2019-20
1. FD Protecting the left bank of mogral river near Shiribagil biyaram foot bridge in Madhur Grama Panchayath of Kasaragod Taluk
Construction of 05 nos. of Foot Over Bridge (FOB) in Bilaspur-Pathrapali (Km 0.000 to 53.300 km) section of NH-111 (New NH-130) in the state of Chhattisgarh on EPC mode
Appointment of Project Management Consultant for Structural audit, estimation, supervising repairs and rehabilitation works of verious bridges/ FOB/ ROB/ Flyover/Underpasses /Culverts in city division of Pune Muncipile Corporation.
Civil works including Earthwork for Railway formation, Blanketing work, Minor Bridges, Major Bridges, ROBs, RUBs, Station building etc
RFP for Construction of 8 Nos. of Major Bridges and rebuilding of 3 Nos. of ROB, including associated S and T works in connection with Aluabari Road (AUB)-New Jalpaiguri (NJP) 3rd and 4th Line (57Km) of Northeast Frontier Railway .
Construction of 01 nos. Important Bridge,06 No. Major bridges, 02 Nos. ROB and other allied miscellaneous works from Km 0.620 to 42.3 km in Bastar District in connection with "Rowghat-Jagdalpur new line (140.00 Km) on South east Central Railway".
Provision of Foot Over Bridge & Raising of Platform to High Level at Gumgaon station & Replacement of Foot Over Bridge at Kalmeshwar station of Nagpur Division under UMB 2024-25 in PH-53.
MOEI, Pump, Lifts of Subway, Under Deck and FOB on Delhi PWD Roads under PWD Electrical Division South. (SH-Operation of lifts at Saket FOB and IIT FOB)
Premonsoon 2026-2027 of Various bridges under Bridges section Thiruvambady
Repairs to submersible bridge on Ds of Purna Medium Project and repairs to bridge near Belkund village in submergance area of Purna Medium Project.
Rebuilding / Rehabilitation/ strengthening of bridges (up line) in connection with running of higher loads and higher speed (678,732,739,775,787,846 etc. bridges) & Replacement of Existing slab Bridge No. 366A, Ballast retainer replacement and ... of Major Bridge no. ... & minor bridges of ...
Construction work of new bridges in place of damaged foot bridge of Dohrighat parallel canal in Mau district.
Civil Maintenance and Improvement work for Bridges Subways Culverts Foot Bridge in North Region Zone 1 to 5
Civil Maintenance and Improvement work for Bridges Subways Culverts Foot Bridge in Centre Region Zone 6 to 10
Construction of Two Minor Bridges on Bibral to Sakol road, VR-29, on Gharni river, Km.2/00 and on Lendi river at Km.3/00, Tq. Shirur Anantpal, District Latur. (Construction of Major Bridge on VR-29 road, on Gharni River at Km.2/00).
Construction of foot over Bridge with 2 landing in wagon tippler area atKhargone STPP
Proposal for repairing, water way cleaning, dressing, grouting etc. of major and minor bridges in ARA-SSM section under ADEN/XBKJ.
Improvement to Injegaon Singarwadi Road ODR-136 Km. 4/600 to 6/00 (incluidng 2 Minor Bridges) Tq. Kinwat Dist. Nanded
CONSTRUCTION OF MINOR BRIDGES ON SHENDURNI SOYGAON HALDA UNDDANGAON ROAD MDR.40. KM. 16/500 AND KM. 24/800 TQ.SILLOD DIST.AURANGABAD
CONSTRUCTION OF MINOR BRIDGES ON KATEWADI AWARDE MURUD MALOSHI ROAD, MDR-128, AT CH 7/910 AND 9/110, TALUKA.PATAN, DISTRICT.SATARA.
Reconstruction of minor bridges (2 no.s) in Km 45/8 & Km 46/2 of Gooty - Pattikonda - Adoni road in Kurnool district.
Reconstruction of minor bridges (2 no.s) in Km 45/8 & Km 46/2 of Gooty - Pattikonda - Adoni road in Kurnool district.
Construction of 7 Minor Bridges on NH 150A from Km 142.00 to 171.00 on EPC Mode in the state of Karnataka
Construction of Bridge Repair at Ramchaki River under Gopalpur-I Gram Panchyat
CONSTRUCTION OF BRIDGES ON STATE HIGHWAYS AND MAJOR DISTRICT ROADS. PACKAGE 19 Package No 19
Construction of Bridges (2Nos) at Ravi Chandra Girijana Colony and Chanakyapuri in Division No.31.
Consultancy Services for Contract Management and Supervision for Construction of Bridges / Culverts in Indore City
Foot Bridge
FOOT BRIDGE
Manufacture and fixing of 60kg Guard Rail including supply of P way fittings on Major Bridges and its approaches under ROBs and FOB of Electrified Tracks in between Ch_ 1.50Km to Ch_ 37.50Km of NTPC_Khargone STPP(2x660 MW) Railway siding in Khargone
Construction of High Level Bridge across Hathni River on Adwada- Khutaja Road. Distt- Alirajpur (MP)
Balance work for side slope protection work for approaches of Major Bridges and between KM 3 to KM 5 in DBG bypass line.
BAY-GTL, GY-KLU, DMM-PAK Sec: Provision of Cradle arrangements for various major bridges and ROBs in SSE/Br/Central/GTL jurisdiction.
Construction of Major Bridges in Km 15 400 on Pusad Bhojala Jambazar Lakhi to District Border Road MDR 32 Taluka Pusad Dist Yavatmal
Balance work for side slope protection work for approaches of Major Bridges and between Km 3 to Km 5 in DBG bypass line.
Rectification of Bekal ROB
(1) Construction of new Foot over bridge at Surat end with parcel lifts and (2) Construction 02 Nos. of 6.10M wide Foot over bridge on replacement account at Ahmedabad End and Surat End.
Seweni High Level Bridge to Bazidpur Harijan Tola (S.C.)
CONSTRUCTION OF HIGH LEVEL BRIDGE ON BAMNALA KAMODWADA ROAD
Ujaina-Kerbakoth(with High level Bridge of 2x18.75m span)
Construction of Foot Over Bridge (FOB) near Holy Shrine, Bambolim at Km 524.330 on NH-66 in the state of Goa on EPC Mode under Road safety Annual Plan 2023-24.( IIIrd call)
Construction of Civil Works of 2nd Entry-Exit structure and Foot Over Bridge (FOB approx.110m) connecting Station Building of Cotton Market Metro station in Reach 4 Section of Nagpur Metro Rail Projec
4 laning of NH-152 (Ambala-Chandigarh Section) in the State of Haryana and Punjab on BOT Basis-Construction of Foot Over Bridge (FOB) in front of Government School at Lalru (Ch.17.770)
CE/EAP/ARRBP/OCB/Bridges-1/Lakhimpur/04 Construction of Bridges in Lakhimpur district i.Br. No. 1/1 on Dimouruguri Panchayat to Lepong
GENERAL-Construction of submersible bridge to Pothukallu Iruttukuthi Tribal Colony across Chaliyar river in Nilambur LAC,Malappuram District.-Bridge Proper (High level bridge) and Approach road work ( Phase 1)-General Civil Work
Annual Plan-Project No 217/ 22-23-Foot Bridge Construction for Palathumkundu Keeran Vayal Thode-General Civil Work