Loading…
Loading…
43,458 results • Best match
CONSTRUCTION OF MAJOR BRIDGE ACROSS NIRGUNA RIVER ON INDIRA NAGAR ROAD VR-60 TQ.BALAPUR DISTT.AKOLA
Const. of Major Bridge at Chainage 245 of Main Drain on Noh Road Bridge Bharatpur
Repair and Protection work of Approach Road of Major Bridge at Bahuwa Chilla Ghat Road
Construction of Major Bridge at Km 0 4 of Mothiramalai Kuttiyar road in Reserve forest
CONSTRUCTION OF MAJOR BRIDGE ON SANGVI ARDHAPUR ROAD MDR-100 KM 11/200 TQ.ARDHAPUR DIST.NANDED
Construction of Major Bridge on Lahan Shahada to Khodasgaon Road VR-55 Tal. Dist. Nandurbar
Construction of Protection Wall Near Major Bridge on Khushgavan Shirve Road Tal. Taloda Dist. Nandurbar
Construction of Major Bridge on Ghagarwada Jiwachiwadi Road VR-109 Km. 2/00 Tq.Dharur Dist.Beed
Repairs to Major Bridge on Ambulga Halgara road, MDR-42 km 15/800 Tq.Nilanga Dist.Latur
Construction Of Major Bridge between Shirse Aawlas Village on Ulhas River, Tal- Karjat, Dist- Raigad
Repair to Major Bridge on Nimkarda Paras Balapur SH-279 Km 65/100 Tq.Balapur Dsit.Akola
Bearing replacement work on NH-27 to Talhati road Major Bridge at ch. 0/200
Construction of Major Bridge Across River Mula on Khadaki Pimpri Road (VR-109) Tal.Akole Dist.Ahmednagar.
CONSTRUCTION OF MAJOR BRIDGE ACROSS PURNA RIVER ON VR-78 NEAR WALSA KHALSA TQ. BHOKARDAN
Construction of Major Bridge on Kalibel Padali Astamba Road Near Padali Udai River Tal.Dhadgaon Dist.Nandurbar
Construction of Major Bridge Across Sapan River on Adnadi Approach Road V.R.89 Tq.Chikhaldara Dist.Amravati.
CONSTRUCTION OF MAJOR BRIDGE BETWEEN SHELU NIKHOP VILLAGE ON ULHAS RIVER, TALUKA KARJAT, DISTRICT RAIGAD
Constructing Major Bridge on Bori River with Approaches on Dhamangaon Khordad Road VR-128 Tal.Dist.Dhule
Construction of Additional Major bridge at km 11/10 of Pollachi - Valparai Road (SH-78)
Constt. of Major Bridge at Chainage 245 of main drain on Noh road bridge Bharatpur
Constt. of Major Bridge at Chainage 245 of main drain on Noh road bridge Bharatpur
Const. of Major Bridge at Chainage 245 of main drain on Noh road bridge Bharatpur
Constt. of Major Bridge at Chainage 245 of main drain on Noh road bridge Bharatpur
Construction of Major Bridge at km 22/727 on Munugode - Nampally road in Nalgonda District
Constructionof Major Bridge Across Panzara River on Nagai to Kokale Road ODR-27Tal.Sakri Dist.Dhule
D/o PLANTATION IN KUNJPURA-KARNAL KHANAURI ROAD FROM CHARO MOR TO KAITHAL FORM 2-LANE TO 4-LANE IN THE STATE OF HARYANA EXCEPT CULVERTS, RETAINING WALLS AND MINOR BRIDGES (UNDER CRF SCHEME) (ESTIMATE PART-I) PART-I FROM KM 17.100 TO 42.00 in kaithal
Repair Bridge over Kudheikela Nallah on SH-10-A- to Kudheikala PMGSY Road _Road_Minor Repair to Railing, Deck slab, Painting of Bridge, Repair of Bridge Approach ROAD -BT-, Wearing Coat -0.300 km-_At 2.500 km
Repair to Bridge over Local Nallah on Kenaveta Chhak to Phalsaghat RD Road _Road_Minor Repair to Railing, Deck slab, Painting of Bridge, Repair of Bridge Approach ROAD -BT-, Wearing Coat -0.300 Km-_At 3.500 Km
Construction of Connecting Arm Skywalk from Sewree Station FOB to FOB across R.A. Kidwai Marg in F-South Ward. -Phase-II
REPAIR TO MINOR BRIDGE ON NAGAD SAGAD HATA AGAR UGVA ROAD MDR-9 CH.30/800, REPARIS TO MINOR BRIDGE ON NER BORGAON VAIRALE HATRUN ROAD MDR-8 CH.6/400 AND REPARI TO MINOR BRIDGE ON PINJAR MAHAN RAJANKHED CHARANGAON CHANNI ROAD MDR-22 CH.36/200 TQ.AKOLA
Construction of Road Over Bridge (ROB) 1x36.0m Composite Girder + 2x24.0m Composite Girders(Bridge proper) + 2x24.0m Composite Girder in lieu of LC-364 at Rly km 668/15 - 17 km in between Mandasa - Summadevi station on Howrah- Vishakhapatnam main line of East Coast Railway under Khurdha Road Division.
Construction of Road Over Bridge (ROB) 1X18.0m Composite Girder + 1x24.0m Composite Girder + 1x36.0m Composite Girder + 1x24.0m Composite Girder + 1X18.0m Composite Girder in lieu of LC-356 at km 660/10-12 in between Baruva to Mandasa Railway station on Howrah - Vishakhapatnam main line under Khurdha Road Division.
GENERAL Junction Improvement At Koduvally ROB NH 66 Old NH 17 Junction and City Center Junction Thalassery in Kannur district General Civil Work
CONSTRUCTION OF MINOR BRIDGE ON PADEL TRILOT NAVANAGAR ROAD M.D.R. 11 AT KM. 4/000, TALUKA DEOGAD DISTRICT SINDHUDURG.
Repairs to Bridge at Ch 43/800 Amoda Pal Bhikangaon Road SH - 45 Tal- Raver
REPAIRS TO BRIDGE ON KHELNA RIVER AT RIKAM TEKADI USMANPETH ROAD AT BHOKARDAN TQ.BHOKARDAN DIST.JALNA
Flood Damaged Repairs to Bridge approach to Vadluru- Teeparru road KM 9/600 in E.G.Dist
Repairs to bridge at Km 11.75 of Virajpet - Byndoor State Highway 27 in Virajpet taluk.
CE/EAP/ARRBP/OCB/Bridges-3/Tinsukia/12 Construction of Bridges in Tinsukia district i.Br. No. 1/1 on Beesakopie 9 no. line to Beesakopie Factory ii.Br. No. 4/1 on Dangari Dighaltarang to Samaguri Habigaon Road iii.Br. No. 2/1 on Nahorjan to Tara TE
Repairs to Bridge and Bridge Approaches U/S and D/S at Km 100.73, 116.20 and 128.50 on Shiradon-Lingasagur SH -41 in B. Bagewadi Tq. of VJP. Dist. (H/A3054-03-102-0-01-200 SH Bridges-2025-26)
Construction of High level bridge across Chittar river along the Venkatachalapuram to Pirancheri road at ch.672 m at Pirancheri Panchayat at Manur Panchayat union
Construction of Retaining Wall at High Level Bridge North SideAcross Nallaru River Connecting Lakshmi Nagar Main Road and Poombarai in Ward No. 08 and 16
CONSTRUCTION OF MAJOR BRIDGE ACROSS MINA RIVER ON MDR- 156 TO GUNJALWADI SH-117 ROAD (VR -199) AT KM. 0/170, TALUKA JUNNAR, DIST. PUNE
RECONSTRUCTION OF HIGH LEVEL BRIDGE AT CH. 162/500 ON PULGAON DEOLI HINGANGHAT KHANDSANGI CHIMUR NERI SINDEWAHI GANGALWADI ARMORI ROAD S.H.322, TAH.- BRAMHAPURI, DIST. CHANDRAPUR
APPROACHES TO HIGH LEVEL BRIDGE ON ANJANGAON MURTIJAPUR KARANJA DARWHA YAVATMAL ROAD SH-282 ON KM133/400 TQ DARWHA DISTT YAVATMAL. VIA DUCT and RETAINING WALL
Construction of High Level Bridge 10.776 Meter Long Eff. over Sadiq Drain Crossing Faridkot-Sadiq-Deep Singh Wala Road at 19400 in District Faridkot Including Approaches
Consultancy Services for Detailed Project Report (DPR) Preparation for work of Construction of High Level Bridge (across Banas River) on Swrooganj to Deri Road District Bhilwara
Reconstruction Of High Level Bridge Inplace of Week Mionr Bridge On Lote Kotavali Songav Pedhe Road O.D.R.35 At Km. 5/500 Tal. Khed Dist. Ratnagiri.