Loading…
Loading…
2,411 results • Best match
Widening, Strengthening, Improvements to Riding Quality,Reconstruction of Culvert Box Culvert Construction of Minor Bridge Retaining wall and Providing Speed Breaker works in the Government roads of Thiruppathur Highways CM SubDivisionMDU017
Widening from I Lto TL Streng Reconof box culvt Const of Minor Bridge inclng Construction of Reting Wall and Drain in Govnt Roads of Rajapalayam H CandM Sub Division TNV 06
Supply and Erection of New Escalator in Lieu of The old existing Escalator at Mepz FOB in Grand Southern Trunk Road
Supply and Erection of New Escalator in Lieu of The old existing Escalator at Chrompet FOB in Grand Southern Trunk Road
Construction of bridge Ward No.10 Nazareth Road to Railway Feeder Road in Alwarthirunagari Town Panchayat
Construction of Bridge at Ward No.12 Sarabanga River (Near Amman Kovil) in Arasiramani Town Panchayat
Construction of Bridge at Ward No.2 Thatchankulam Channel at Kalathu street in Melaseval Town Panchayat
Construction of Bridge Across Adayar river between Tharapakkam and Anakaputhur (Balance work on Anakaputhur side only)
Rerouting of existing HT/LT lines for the work of construction of ROB at LC No 427 Subwork
Widening from Two lane to Four Lane and Strengthening at km 9/6 -16/4 of Paruvakudi - Kovilpatti - Ettayapuram - Vilathikulam - Vembar Road including Construction of Major Bridge, CD works, Junction Improvements and Protective works (TNV-115)
Widening and Strengthening Improvements to Riding Quality Construction and Reconstn of Box culvert Widening of Minor Bridge and Construction of Drain works in Bhavani H C and M Sub division TPR 005
Widening from Two Lane to Two Lane Paved Shoulder and Strengthening Construction of Minor Bridge and Retaining walls in the Government roads of Kinathukadavu H C and M Sub Division CBE 044
Urban Improvements Widening, Strengthening, including Widening of Slab culverts, minor Bridge and Construction of Retaining wall works in the Government roads of Madurai West Highways C and M Sub-Division MDU 057
PACKAGE 85 Widening and improvements, Improvements, Minor Bridge, Retaining wall and Culvert works including up keeping for a period of 60 months in Govt. Roads in respect of Thiruvidaimaruthur H, CandM Subdivision
Widening and Strengthening, Improvements to Riding Quality, Construction of Retaining wall, Reconstruction of Drains and Minor Bridge in the Government Roads of Coimbatore North H, C and M Sub Division - CBE - 015
Widening and Strengthening, Improvements to Riding Quality including Construction of Minor Bridge and Construction of Retaining wall works in Govt. Roads in respect of Thanjavur and Orathanadu H CandM Subdivision TRY-28
Widening, Strengthening, Improvements to riding Quality, Reconstruction of Culverts, Construction of Minor Bridge and Providing Speed Breaker works in the Government roads of Thiruppathur Highways C and M Sub-Division MDU 025
Improvements, Widening of Curve and Improvements to Riding Quality to Government Roads including Construction of Minor Bridge, CD Work, Retaining Wall and Protective Works in Krishnagiri (H) CandM Sub Division (SLM-32)
Widening from IL to DL Strengthening Improvements to Riding Quality Construction of Minor Bridge including Reconstruction of Box Culvert in Government Roads of Ottapidaram H C and M Sub Division TNV 43
PACKAGE 26 Widening, Improvements, Improvements to Riding Quality, including Reconstruction of Minor Bridge, including up keeping for a period of 60 months in Govt. Roads in respect of Thiruvidaimaruthur H CandM Subdivision
Widening and Strengthening, Improvements to Riding Quality including Reconstruction of Culverts, Construction of Retaining Wall and Reconstruction of Minor Bridge on Government road in Thirupattur H, C M, Sub Division - TVM-62
Strengthening Improvements Improvements to Riding Quality Reconstruction of Box Culverts Reconstruction Culverts Widening of culverts Construction of Minor Bridge to Government Roads in Ambasamudram H C and M Sub Division TNV 23
PACKAGE 95 Widening and improvements, Strengthening, Minor Bridge, Retaining wall and Culvert works including up keeping for a period of 60 months in Govt. Roads in respect of Papanasam H, CandM Subdivision
Widening from SL to IL and Strengthening, Improments to Riding Quality Reconstruction of Minor Bridge, including Providing CC Pavement in Government Roads of Palayamkottai H C and M Sub Division TNV 56
Widening and Strengthening, Improvements to Riding Quality including Reconstruction of Culverts, Construction of Retaining Wall and Reconstruction of Minor Bridge on Government road in Arni H C M, Sub Division - TVM-48
Improvements to Riding Quality and Reconstruction of Box Culvert, Construction of Box Culvert, Minor Bridge, Providing Speed Breaker works in the Government roads of Devakottai Highways C and M Sub Division MDU121
Strengthening,Improvements to Riding Quality Reconstruction of Minor Bridge in lieu of existing causeway including Protective works in Government Roads of Rajapalayam and Srivilliputhur H C and M Sub Division TNV-04
Widening from Two lane to four lane and strengthening at Km2by300 2by6 of Erode Chennimalai road MD 108 including reconstruction of Minor bridge at Km 2by4 and construction ofcentre median TPR 023
Provision of lighting arrangements in between Sulur Somanur railway limited use subway in lieu of the existing LC No.142 in Rasipalayam Thennampalayam Road Km.0/2 railway Km.467/6-8 road over bridge railway Km.466/21 23 in Coimbatore District.
Providing Load Bearing Drain on Valayapatti side Balance work in the Main work of Construction of Road Over Bridge at Km 0 8 of Sholavandhan Valayapatti Road via Andipatti in lieu of existing LC No 346 at Railway Km 473 600 700
Construction of Road Over Bridge at Km.12/8 of Suramangalam-Omalur (via) Muthunaickenpatty Road (Major District Road 696) in lieu of existing LC No 7 at Railway km 6/200 300 in between Magnesite and Omalur railway Stations Sub Works -3 Nos
Construction of Road Over Bridge at km 40/8 of Sankari Mecheri Road (via) Edapadi State Highways 220 at Railway km 23/800 900 in lieu of existing Level Crossing No 18 in between Omalur and Mecheri Railway stations Sub Works - 3 Nos
Formation of Western Bypass road to Aruppukottai town starting at Km.171 0 of NH45B (New NH38) and connecting SH42 Srivilliputhur-Parthibanur road at Km 61 6 and ends at Km 179 6 of NH45B New NH38 including construction of Road Over Bridge
Construction of Bridge at Km 2/8 of Kakkadasam - Thogarai Road in lieu of existing piped causeway
Construction Bridge Across Vettar River at Madapuram Thonikarai-Pakkam Link in Ayikudi Panchayat.
PACKAGE 25 Widening, improvements and Improvements to Riding Quality, Minor Bridge and Culvert works, including up keeping for a period of 60 months in Govt. Roads in respect of Trichy H CandM Subdivision
Package 4 idening ImprovementsImprovements Riding qualityConstruction of Minor Bridge Reconstruction of Pipe culverts and Construction of ing wall to Government Roads in Sivakasi H CandM Sub Division including upkeeping for a period of
Widening from Single Lane to Two Lane Strengthening Constrn of Minor Bridge Reconstruction of Damaged Culvert Widening of existing Culvert including Protective works in Government Roads of Sattur H CandM Sub Division TNV01
Widening from Intermediate Lane to Two Lane and Strengthening at km 0/0 - 5/4 of Anaipiranthan Perumbakkam road including Reconstruction of Culverts and widening of Culvert, Widening of Minor Bridge- TVM-31
PACKAGE 92 Widening and improvements, Improvements to Riding Quality, Minor Bridge and Culvert works including up keeping for a period of 60 months in Govt. Roads in respect of Peravurani H, CandM Subdivision
Widening and Strengthening, Improvements to Riding Quality, Reconstruction of minor bridge, Reconstruction of Culvert, Construction of Drain and Construction of Retaining Wall on Government road in Tiruvannamalai (H), CandM, Sub Division-TVM-33
Package 49 Widening Improvements to Riding quality Reconstruction of Minor Bridge Paver block including CD works to Government Roads in Nanguneri H CandM Sub Division including upkeeping for a period of 60 months
Construction of RUB at Km 80 4 of Avinashi Tiruppur Palladam Pollachi Cochin via Meenkarai road in lieu of existing LC No 3 at Railway Km 2 1 2 in between Pollachi and Anaimalai Railway stations Sub Work Providing Service road on either sides of RUB
Providing solar light Arrangement to the Major Bridge across-vellar River- at km 1/6 - 2/2 in the road branching from km.6/8 of Vridhachalam-Tholudur road to Madhanathur road-via- Jayankondam. SH-140 VPM-123
Desilting the Culverts and Bridges by Engaging Machineries at Km 7.0_17_5 of Inner Ring Road
Construction of Road Over Bridge at Km 2/2 of Salem new bypass road in lieu of existing LC NO 183 at Railway Km 189/400 500 in between Salem Town and Salem East Railway Stations Sub Work Widening of Vent way of Thirumanimutharu River
Construction of Road Over Bridge in 66 feet road at Bharathipuram in Railway Km 65/000-100 including construction of Motorable Over Bridge at Km.0/8 of Vennampatty road in lieu of existing Level Crossing No.41 at Railway Km 65/600-700
Provision of Lighting arrangements to the Road over bridge at Km.1/4 of Tiruppur Somanur road to Chikkanna College road in lieu of existing railway arch Bridge No.29 at Railway Km 445/19-21 in btw Tiruppur and Vanjipalayam Railway Stations in Tpr
Construction of Road Over Bridge at Km.3/2 of the road branching from Km.133/8 of Salem Cochin road to Karavazhi Madhappur (via) Kaniyur in lieu of existing LC.No.141 at Railway Km.463/23-25 in between Somanur and Sulur Railway Stations
Widening from Single Lane Intermediate Lane and Strengthening, Construction of Minor Bridge in lieu of existing causeway Strengthening and Construction of Drain in the Government Roads of Sulur H CandM Sub Division CBE 040