Loading…
Loading…
3,347 results • Best match
Please refer uploaded Tender doc
OHE Modification work at various Proposed ROB under Electrical Construction Unit Gorakhpur (At LC No. 115 Spl in Bhatni Yard, LC No. 67C in Padrauna, LC No. 4 in Indara)
Road Restoration work of the road from Lohia Path ROB Bridge infront of the Ministers Residence on Heinemann Gomti Nagar Road from SBI Bank to Shaheed Path via RK Timber
OHE Modification work at various Proposed ROB under Electrical Construction Unit Gorakhpur (At LC No. 115 Spl in Bhatni Yard, LC No. 67C in Padrauna, LC No. 4 in Indara)
Supply of 20 mm 10 mm Stone Grit from Coarse Sand from Kabrai Quarry and Banda Hamirpur Quarry to construction of 02 lane ROB 51 Special in District Sitapur (U.P.).
25 KV Electrical work in connection with removal of infringement due to construction of ROB at LC 7 C in section PEE-KYH in BSB division of N. E. Railway.
SUPPLY OF MACHINES ON HIRE CHARGE BASIS WITH OPERATOR AND HELPER EXCLUDING P.O.L. WHICH SHALL BE PROVIDED BY UPSBC FOR ROB 262 SPECIAL IN DISTT GONDA UNDER BCU 3 LUCKNOW.
Construction of 02 lane ROB on Najibabad-Bundki-Nagina road at Moradabad-Saharanpur rail section Km. 1482/28-30 level crossing no. 477-B in District- Bijnor under CRIF scheme.
Construction of 6Lane ROB at Km. 314.630 over Existing NH24 of Bareilly Sitapur section on EPC basis in the state of Uttar Pradesh for proposed private railway siding of KFL
25 KV Electrical work in connection with removal of infringement due to construction of ROB at LC 7 C in section PEE-KYH in BSB division of N. E. Railway.
25 KV Electrification work in connection with Provision of Ramp for FOB at various station of under jurisdiction of DEN-G/BSB (KRND, MMA, SMZ (total-03 station), BSB Division of N. E. Railway.
(Zone no. 1 MB) ( Km.1381 to 1407) DLP-HRH All service building in MB yard between Sambhal side ROB to kapoor company, FOB and station building, Good shed, washing line etc including wood , steel, and road work in the section of JE/I/W/station/MB and all residential building in North side of PF No 1 and up to kapoor company and near goods shed in the section of JE/I/W/station/MB including wood work, steel work,road work under ADEN/HQ/MB.(2026-27)
Repair and rehabilitation work of rail over bridge located in km-1 of Mall Road (up to Avantibai Crossing) from Kheria Airport in Agra district( Bridge Work)
Construction of RUB and other associated works at KM 863/15-17 to eliminate L.C No. 13 at Bharwari Railway Station Yard under the section of Assistant Divisional Engineer/Line/Prayagraj.
BRACKET (SS), as per Drawing: 3 10113.0.76.095.003 ALT AR, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED
BRACKET (SS), as per Drawing: 3 10113.0.76.095.003 ALT AR, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED
Reconstruction of VRB at km. 0.010, 3.400 and 4.300 in Tigai Mr.
Reconstruction of VRB at Km 10.807 in Akbarpur Dy.
Reconstruction of VRB at km 0.000, km 2.986 and km 3.997 in Sarwankhera Mr.
Repairing of VRB at Km 24.559 in Reona Dy.
Reconstruction of VRB at km 30.515 and 32.261 in Akbarpur Dy.
Reconstruction of VRB at km 4.000 and 10.100 in Bhadesha Dy.
Repairing of VRB at km 17.465 and 21.234 in Akbarpur Dy.
Repairing of VRB and Protection wall between Km 0.000 to 17.150 in Hasnapur Dy.
Reconstruction of VRB at km 0.540, km 2.370, km 3.510, km 5.460 and Extention of VRB km 0.000 in Bhilsa Dy.
Reconstruction of VRB at km 0.000, km 0.200 in Fatehpur Roshanayi Mr. km 0.000 in Saitha Mr. and New Construction of VRB at km 1.500 in Saitha Mr.
Repair/Widening of VRB at km. 0.010, 1.400, 4.790 and 5.500 in Badapur Mr.
Reconstruction of VRB at Km 0.000 and 1.840 in Aagapur Mr.
Repairing and Reconstruction of VRB at km 28.310 and 29.010 in Akbarpur Dy.
Repairing and Reconstruction of VRB at km 0.809, 1.008, 1.373, 2.346 and 3.465 in Makhauli Mr.
Reconstruction of VRB at km 0.640, km 2.760, km 8.910, km 10.435 and km 11.090 in Jalala Dy.
Reconstruction of VRB at km 0.300, km 3.525 and km 5.020 in Lohari Mr.
New Cross Regulators and Repair of Head Regulater of Bhadras Dy.
Construction of Bridge at KM 0.750, 2.000 of Amdeva Mr, KM 1.100 of Pidhi Mr, Km 2.600 of Chandpur Mr And Km 0.700 of Kalyanpur Mr in District Sultanpur
Supply of Crushed Stone Grit 10mm 20mm and washed coarse sand Zone-IV on construction of bridge over UGC Ch. No. 144.530 Mohiuddinpur Siwal Khas Road in Distt Meerut
Supply of 20mm Stone Grit, 10mm Stone Grit and Coarse Sand at Construction of Bridge Over River Basuhi Between Nagesara and Purelala Village at Nagesara Ghat in Distt-Jaunpur
WORK FOR SHIFTING OF 33KV OVERHEAD LINE AT SONAKPUR KASHIRAM YOJNA FOR CONSTRUCTION OF BRIDGE FOR INTERLINKING DELHI ROAD TO HARIDWAR ROAD UNDER THE JURISDICTION OF EUDD-II, MORADABAD
NPP Jalalabad ke Dajgiyayan Marg Setu Avm Surxatmk Kary ka nirman
Bridge work
Request for Proposal for Design, Build, Fund, Operate and Transfer of Foot Over Bridges (for a license period of 20 years) at Greater Noida (Package A)
Repairing of Bridges , Head regulator cum VRB of LRC (main canal), Ghisoly Dy, Chitra Minor, Aagar Minor, Nagwas Minor and Vinekamafi Minor at Lower Rajghat Canal.
Earthwork in Embankment/Formation, Blanketing, Retaining wall, Extension of bridges etc., in connection with Proposal of loop line on Guna line at Sithauli -A Cabin Station
EDD-II, Mughalsarai under Estimated work for G / S for transfer of 11 KV Town Feeder No-1 and 2 due to construction of ROB-247, Mughalsarai District under Deposit Scheme
Repair and painting of Culverts, Divider and ROB parapet between Ch 13.000 to Ch 40.000 of NH 328A under OR in the State of Uttar Pradesh in the year 2022-23.
Manufacturing and installation of 1.5 meter Height of Mono Absorbent Acoustic/Noise Barrier at 04 (Four) lane ROB between IC/2T Gohri Phatak between Shantipuram to Phaphamau on Soraon Road, Prayagraj
Construction of2 lane ROB in lieu oflevel X-ing 75 at 149/10-11 on Prayagraj Phaphamau Rail Section between Teliyarganj to Bada Baghada on Salori Sadak Marg in District-Prayagraj
Design and Construction of 02 lane ROB at LC 136 SPL/3E On Bahraich Tulsipur Marg (NH-730) Near Jharkhandi in Tulsipur Assembly Constituency of District Balrampur, U.P. on EPC Mode.
Brooming and sweeping of coal transportation road from barrier no. 3 to ROB near Nautola village at Khadia Project for a period of one year (excluding monsoon period) at Khadia Project
Construction of Service Road of 2 Lane ROB Baraut Meerut Road in lieu of LXing No 48T on Delhi Shahdara Shamli Saharanpur Rail Section Near Baraut Railway Station in Distt Baghpat
Providing and Laying GSB, WMM, etc. in R.E. Wall Portion For construction of 4 lane ROB in lieu of level X-ing IC/2T Gohari on Phaphamau Lucknow Rail Section on