Loading…
Loading…
3,347 results • Best match
Manufacturing and installation of 1.5 meter Height of Mono Absorbent Acoustic/Noise Barrier at 04 (Four) lane ROB Near Subedarganj Railway Station (Near G.T. Road to Airport Road) in Dist.- Prayagra
NER-LJN Division:- Provision of Ramp for FOB under Harmonized guideline for Divyangjan facilities at 08 stations (GADM,CLW,BEU,BGAN,PDR,AA,KMP & BNKJ) (Total- 16 Ramps) under the jurisdiction of Sr.DEN-II/LJN.
Electrical work in connection with Provision of Ramp for FOB under Harmonized guideline for Divyangjan Facilities at 54 stations (Total 108 Ramps) and Improvement of sub-station building in different Sub-Station over LJN- DIV.
(1) Provision of Ramp with roofing in FOB at (BTRI, BEM, BPR, KHH) NSG 5 stations in jurisdiction of Sr DEN/HQ/IZN section.(2) Provision of Height Gauge at Level Crossing in Izzatnagar Division.
Modernization of Railway station including improvement to traffic circulation, entrance, porches, front elevation, beautification of circulating area and FOB Ramp, etc. at Bahraich Station of Lucknow Division of N.E. Railway under Amrit Bharat Station Scheme.
Balance Electrification of Offices, Depots, Platforms, Station Buildings, Cabins, IBH, Level Crossing Gates, FOB, Staff Quarters etc. coming in the work of 3rd Line of JHS - BINA Section of Jhansi Division in North Central Railway.
Customized AMC/CMC for Pre-owned Products - Comprehensive Annual maintenance of automated Key-Fob dispenser (Keymanagement system) with 32 keys slot capacity for two years with spares parts; M/s Impex Engineering Corporation; Comprehensive Maintenanc..
MOUNTING PLATE FOR GRAVITY TAP, as per Drawing: LE63147 ALT b, Packing Instruction NO. PI042 VER1.0 : AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE
MOUNTING PLATE FOR GRAVITY TAP, as per Drawing: LE63147 ALT b, Packing Instruction no.PI042 VER1.0 : AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE I
STAINLESS STEEL WASH BASIN COMPLETE (L.H) FOR LHB COACH, as per Drawing: MI004544 ALT e, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATI
FIXING CLIP 72MM DIA, as per Drawing: LP63137, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED WITH ADEQUAT
SUPPORT BRACKET COMPLETE FOR LHB SLR HOG COACHES, as per Drawing: LR63270, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM S
STAINLESS STEEL BAR DIA 20X6000MM, as per Drawing: IS:6603-2001, X04Cr12, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SH
SET OF DOORWAY PARTITION FOR MEMU/DMC/3PH COACHES, as per Drawing: MPLDWPMEMU3PH VERSION 0, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORT
STAINLESS STEEL WASH BASIN COMPLETE (L.H) FOR LHB COACH, as per Drawing: MI004544 ALT e, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATI
FIXING CLIP 72MM DIA, as per Drawing: LP63137, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED WITH ADEQUAT
SET OF FRAMES FOR LHB POWER CAR COACHES, as per Drawing: MPFRAMEPOLHB VERSION 4, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE
MOUNTING PLATE FOR GRAVITY TAP, as per Drawing: LE63147 ALT b, Packing Instruction no. PI042 Ver1.0 : AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE
SET OF ALUMINIUM FLOOR END PROFILE FOR ANTYODAYA COACH, as per Drawing: MPLALFEP VERSION 0, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORT
SYNTHETIC THERMOPLASTIC TPV WATER HOSE 50MM, as per Drawing: MDTS-234 REV.1, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM
CONSTRUCTION OF 04 LANE ROB AT LEVEL X-ING NO. 10A IDGAH-BANDIKUI RAIL SECTION AT RAILWAY KM 0010/03-04 ON BODLA TO BICHPURI-BHARATPUR ROAD IN DISTT. AGRA on SBD Mode
Construction of Bridge Over River Magai at Narahi Near House of Late Vinod Rai in Distt Ballia Tender for Construction of Approach Additional Approach Protection Work On Percentage Rate Basis)
Construction of Bridge over River Rind including its Approach road , Additional Approach road and Protection work in between Village Ranmastpur and Naraicha Village of Vikas Khand Khajuha in District Fatehpur
Construction of Bridge Over River Gomti near Village Gathana and Dandva, in Vikas Khand Khutahan of Vidhansabha Kshetra Sadar including Approach road, Additional Approach road and Protection Work in JNP
Design and Construction of Bridge, Approach Road and Protection work River Kathina in Village Gahiya of Development Block Mitauli in Assembly Constituency Kasta of District Lakhimpur Kheri on EPC Mode.
Design and Construction of Bridge Approach Roads Additional Approach Roads and Protection Works over Ganga River near Madaiyan Ghat on Hardoi Kamalganj Road under Kamalganj Development Block in District Farrukhabad
Electrical work for ABSS:Provision of Foot over bridges and high level platforms at stations Amroha,Chandausi,Roorkee, Kotdwar,Hardoi,Bulandshahr ,Garhmukteshar, Hapur, Najibabad,Nagina,Seohara,Shahjehanpur & Rampur.
Work of brick soling in between and bituminous painting on approach road of bridges at Km. 91.406 and Km. 96.873 of Rapti Main Canal in district Balrampur
Work of brick soling in between and bituminous painting on approach road of bridges at Km. 87.820 and Km. 89.898 of Rapti Main Canal in district Balrampur.
Construction of short bridges access roaeds additional access roads and protective works on the Zabdi river from Khaikheda to Panuwala via Khawajapur Dhantala Road in district Moradabad
Work of Bituminous painting and brick soling on approach road of bridges at Km. 80.329, Km. 81.100 and Km. 82.806 of Rapti Main Canal in district Balrampur.
Carrying and handling of standard weights for testing, calibration and stamping of all road weigh bridges of Khadia Project (05 nos) for a duration of two year.
Request for Proposal for Design, Build, Fund, Operate and Transfer of Foot Over Bridges (for a license period of 20 years) at in Greater Noida- Package 1
Request for Proposal for Design, Build, Fund, Operate and Transfer of Foot Over Bridges (for a license period of 20 years) at in Greater Noida- Package 3
25 KV Electrification work in connection with Provision of Ramp for FOB at various station of under jurisdiction of Sr.DEN-III/BSB (GYN, DLR, JKN, SDT, SRNT (total-05 station), BSB division of N. E. Railway.
NER- LJN Division:- Provision of Ramp for FOB under Harmonized guideline for Divyangjan facilities at 10 stations.(GDK, BRCK, BUR, JBR, BUW, SUJ, MIR, CLJ, JLD & BKT Total- 21 Ramps) Under Jurisdiction of Sr.DEN-III/LJN.
Construction of Cement Concrete CC road for service road at ROB in LIEU of at Lxing no 49A over DSA SRE rail section between Baraut Kassam kheri railway station in distt Baghpat
Service Road work Bitumen Concrete in Super Structure and construction of Side Drain at Clover Leaf towards Rani Lakshmi Bai Hospital from ROB Sampar No. 218A built in Rajajipuram under district Lucknow
Electrification of under construction ROB in lieu of level crossing No.157-A at Gorakhpur Cantt Station and Provision of lighting arrangement of surrounding area of proposed 5th Stabling line at Gorakhpur.
MOUNTING PLATE FOR GRAVITY TAP, as per Drawing: LE63147 ALT b, Packing Instruction No. PI042 VER1.0: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE I
SET OF HAND RAIL FOR LHB DSLR COACHES, as per Drawing: MPLHRLWLRM501 VERSION 2, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE I
FIXING CLIP, as per Drawing: DIN3016,B1-70X25 W4, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED WITH ADEQ
MOUNTING PLATE FOR GRAVITY TAP, as per Drawing: LE63147 ALT b, Packing Instruction: PI042 VER 1.0 AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM
STAINLESS STEEL ROD DIA. 8MM., as per Drawing: SS GRADE AISI-304., Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE
Associated telecom works for provision of RUB at KM 98/16-99/1 between LMN- DYP, Km 11/2-3 b/w BYHA-URPR, Km 37/8-9 and Provision of RUB for closure of LC- 61/C at KM 861/17-19, LC-77/C at KM 893/24-26 in ZBD-AYC, LC no. 70/C, 75/C, 103/C, 116/C & 119/C in DMW-ON sections of Lucknow Division.
Construction of Bridge at KM 4.300, 8.300, 10.100, 13,400 of Bhaggupur Mr, KM 3.800 of Jagdishpur Mr, Km 0.900 of Vishnagarpur Mr And Km 0.000 of Gadauli Mr in District Sultanpur
Construction of Bridge Approach Road and Protection Work Over River Chauka Near Godiyanpurwa village in Gram Panchayat Rasoolpur of vidhan Sabha Kshetra Sevta in District Sitapur Uttar Pradesh on SBD Mode
Design and Construction of Bridge, Approach Road and Protection work over River Kiwani in Village Belva Basahiya of Development Block Sakran of Assembly Constituency Biswan of District Sitapur on EPC Mode.
Supply of 20mm Stone Grit, 10mm Stone Grit and Coarse Sand at Construction of Bridge From River Gomti on Kaboolpur-Sungulpur-Navabad Jungle-Naipura Road at Naipura Ghat in Distt-Jaunpur.
Supply of 10 mm, 20 mm Stone Grit (Kabrai) and C sand (F.M. 2.5 Ken Banda/Hamirpur) for CONSTRUCTION OF BRIDGE OVER RIVER SAI ON SINGHNI-LADWAT MARG IN DISTT PRATAPGARH