Loading…
Loading…
3,347 results • Best match
Construction of 2 lane ROB in lieu of level X-ing 34-A on Prayagraj-Mugalsarai Rail Section at K.M. 815/19-21 between Chhiwaki-Karchhana Railway Station of North Central Railway in District Prayagraj.
Construction of side Drain and service road at Unchahar ROB (Km.116.200) of Raebareli Allahabad Section of NH24B to 2Lane with paved Shoulders from km 82.00 to km 188.600 in the State of Uttar Pradesh
Widening and Upgradation of existing two lane Ghazipur Zamania Saiyedraja section of NH 97(New NH 24) to 2L plus PS configuration including construction of ROB in the state of Uttar Pradesh on EPC Mode
Laying of foundation stone and installation of stone slabs, work of painting/painting of kilometer stone, hectometer stone, bridges and culverts on various roads under Vidhansabha Khadda in Kushinagar district.
Consultancy Services for Preparation of DPR for construction of 2L Bridges at Km92.911, Km99.206, Km100.600,Km121.800,Km126.901, Km144.135,Km150.794, Km171.056, Km178.612,Km192.354,Km194.118, Km201.176,Km216.801 and Km226.195 of NH730 intheStateofUP
Laying of foundation stone and installation of stone slabs, work of painting/painting of kilometer stone, hectometer stone, bridges and culverts on various roads under Assembly Ramkola in Kushinagar district
Construction of 2 Nos. Stair Case at 2-Lane R.O.B. on DFCC Route cum LHS in Lieu of at L-Xing 79 at Km. 165/5-6 on Meerut City-Saharanpur Rail Section Near Nagal Railway Station in Distt. Saharanpur
Provision of RUB in lieu of LC no.103/C (Km936.489), 128/C (Km969.097), 142/C (Km 986.789) & 124/C (Km963.606) on RBL - MBDP Section of Lucknow Division on Northern Railway under Dy CE /C/AY.
MILD STEEL PIPE 25MM MEDIUM PLAIN END GALVD., as per Drawing: IS: 1239 (PT-1) 2004, TAB-4 (ERW), Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRAN
CAPACITOR BANK FOR LHB EOG TYPE POWER CAR COACHES, as per Drawing: EDML130,REV-1,COR-5 ,TYPE-II, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRA
Provision of RUB in lieu of LC no. 118/C (954.447), 129/C (970.635), 136/C(979.702) & 140/C (948.670) on BSB- PBH-LKO Section of Lucknow Division on Northern Railway under Dy CE /C/AY.
Approach Road/RE Wall/Vioaduct Portion, , Service Road and Super Structure for Construction of 2 lane ROB in Ilieu of Railway Crfossing No. 3-A at R Prayagraj Kanpur Rail Section of NCR in District-Prayagraj.
Construction of Bridge over River Mansaita including its Approach road and Protection work at K.M. 09 of Phaphamau Sahsoan Hanumanganj Road in District Prayagraj as per attached GAD and silent Features on EPC MODE
Construction of bridge, approach roads, additional approach roads, and protection works over the Gomti River In place of Pipa Pul on Murarchak-Katsari road in Constituency of Lambhua in Distt Sultanpur on EPC Mode.
Electrification of newly constructed Platform, buildings, P.F. shelter, FOB , 11 KV line shifting works, Other allied Works under modification in Gonda Jn. yard & Upgradation work of Electrical Installations/ Facilities in FBWP Plant in connection with GD-BUW- Third line Project
Construction of 6 nos. of FOB at Km.34.500 (Badalpur), Km.42.800 (Dadri), Km.50.050 (Sikandrabad Industrial Area), Km.53.540 (Sikandrabad), Km.68.130 (Bulandshahr Dehat) and Km.83.100 (Khurja Dehat) on Ghaziabad Aligarh NH-34 in UP on EPC mode
Electrification of newly constructed Platform, buildings, P.F. shelter, FOB , 11 KV line shifting works, Other allied Works under modification in Gonda Jn. yard & Upgradation work of Electrical Installations/ Facilities in FBWP Plant in connection with GD-BUW- Third line Project
Electrical work in connection with the work of "Subedarganj-Provision of additional parking shed, extension of portico, pathway & other associated work at NCR/HQ office campus".Electrical/G work due to construction of ROB in lieu of Lc no. 18-C ... at RUB stn ...
Under the state plan general damaged bridge construction in the year 2019-20, the work of constructing RCC wax culvert in NH-2 to Niyamatpur road Other District Road
Supply of Crushed Stone Grit 10mm 20mm and Washed Coarse Sand Construction of 02 Lane ROB in Lieu of L Xing no 42 between Khatauli Sakoti Railway Station on MTC SRE Rail section in Distt Muzaffarnagar
Balance/Left Over work of Construction of ROB No.123 at CH.108640.0 m Over NH- 28 between Sahajanwa-Piprauli in Connection with Sahjanwa-Dhorighat New Railway line Project in Lucknow Division of N. E. Railway.
Modification in 132 kV 3 phase double circuit transmission line due to construction of 02 lane ROB in lieu of LC -24,31,83,85 Spl and 86B between FTP-TDL section in Prayagraj division of North Central Railway.
(Zone no. 2 MB ) All service/Residential building between Sambhal road and LOCO shed, ROB and south side UP dep. Line in the section of SSE/W/South colony / MB under ADEN/HQ/MB (2026-27)
MC EW D RoB to Providing and fixing window grill and channel shed and grill fencing Toilet Ramp facility for Disabled Person at Bijnor sub Circle office building at Pathar garh fort Najibabad Bijnor 2025 26
Supply of Ready Mix Concrete Construction Site of 02 Lane ROB on Varanasi Jafrabad Rail Section Between Jalalganj and Sirkoni Railway Station at Km 811/29-30 Level X ing No 30 C in District Jaunpur
Piling work by Hydraulic drill machine cleaning of hole making and lowering of cage pouring of ready mix concrete of M35 Grade by Transit Mixture and swing pump at ROB 8 SpL Para Crossing Rajajipuram Lucknow
as per BoQ attached
Laying of foundation stone/inauguration and installation of stone slabs, work of painting/painting of kilometer stone, hectometer stone, bridges and trees on various roads under Vidhansabha Hata in Kushinagar district
Construction of 02 Number of Bridges (Two Lane) over Pahadi River along with Approaches and Protection works from Bhuradev Mandir to near Maa Shakumbhari Devi Mukhya Mandir in Distt. Saharanpur, U.P.
Construction of Foot Over Bridges FOBs at IR Stations of Rasulabad, Malwan, Kurastikalan, Bindki Road, Bidanpur and Katoghan Between New Karchana to New Kanpur Section Under the Jurisdiction of CGM/PRYJ
END FITTING TO PG-11,ANNX A,TAB.A2,SNO2., as per Drawing: RDSO/PE/SPEC/AC/0138-2009(REV-I), Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORT
HEX HEAD SCREW M12X25, as per Drawing: IS:1364(PART-2)-2002,5.6, CE COATING AS PER MDTS-057, packing instruction-PI042. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. Make:-TVS/TUFF/DFL/UNBRAKO .
Construction of R.E. Wall and Related Structure of 2-lane Road Over Bridge Suhag Nagar Chauraha to Subhash Chauk/Jain Mandir in distt. Firozabad (U.P.)
Design and Construction of Bridge, Approach Road and Protection work over Back Flow of Sharda River in Village Basha Badagaon of Development block Phoolbehad in Assembly Constituency Srinagar of District Lakhimpur Kheri on EPC Mode.
Design and Construction of Bridge, Approach Road and Protection work over River Sarayan on Lalkurti - Maheshpur Road Near Maheshpur - Chelwara Village in Development Block Khairabad of Assembly Constituency Sadar of District Sitapur on EPC Mode.
Construction of Road Work of 02 Lane R.O.B. At Level X-ing No. 504 At Km 1354/23-25 in Agra-Agra Rail Section on NH-2 TO UPSIDC Road in Distt- Agra (U.P.)
Construction of Road Work in Service Road of 04-Lane R.O.B. At K.M. 11/5-6 in lieu of Level Crossing No.-11C/2T on Agra Fort-Achhnera Rail Section on Runakta-RohataMarg (South by Pass) Connecting NH-2 to NH-3 in Distt. Agra
Construction of Road Work in Service Road at 02 Lane R.O.B. at Level X-ing No. 62 At Km 1228/25-27 of Kanpur-Tundla Rail Section on Asfabad Chauraha-Fatehabad Road in Distt. Firozabad (U.P.)
Construction of Road Work (Approach Portion) at Construction 2 Lane R.O.B. At Level X-ing No. 309 Spl. (Talab Chauraha) in Distt- Hathras (U.P.)
Construction of Service Road Of Level Crossing No.-54 At km. 0060/01-02 on Bayana - Yamuna Rail Section Between Kirawali (NH-11) To Kagarol Road in Distt. Agra
Construction of 04 Lane R.O.B. At Level X-ing No. 105C., (Near Daud Khan Rly. Station) in Distt- Aligarh (U.P.)
Construction of 2 lane ROB in lieu of level X-ing 76 Special at Railway K.M. 149/9- 150/0 on Prayagraj Phaphamau Rail Section on Lalla Chungi to IERT Marg (Near IERT Gate ) in Digtrict.-Prayagraj
Construction of ROB Including Service Road, Drain, Stair Case, View Cutter and Electrical Lighting work on Bilpur railway crossing no 344A on Fatehganj East to Dataganj road under Faridpur Vidhansabha constituency of Bareilly dist under CRIF Scheme
Design and Construction of 02 lane ROB in lieu of LC 37 C at Km 54/15-16 of RAC-SPC Rail Section of Northern Railway on Chandra - Bargavan - Kulhaghat Road In District Sitapur on EPC Mode.
Providing and laying of Earth work GSB and WMM for Construction of service road for 02 lane ROB on LXing no 42 Tabita Titauda Bhangela road between Sakoti-Khatauli railway stations on DFCC route in dist Muzaffarnagar
Construction of ROB in lieu of LC No. 20 A at Km 170/8-9, ARJ yard in connection with doubling of BTT-ARJ with electrification excluding IAA-MAU (116.95 Km.) in Varanasi Division of NE Railway.
Construction of 2 Lane ROB in lieu of Railway Crossing No. 78-A of North Railway on Prayagraj -Phaphamau Rail Section at Railway km.151/1-2 Bakshii Bandh Road Near Prayag Railway Station in District Prayagraj
25 KV Electrification work in connection with proposed construction of 4 - lane ROB at Railway Km 7/26-24 between Peokol & Salempur station in Bhatni - Aunrihar section in Varanasi Division (NH CH 2+645) of N.E. Railway.
Reconstruction work of 28 Nos damaged bridges located on Dy. and minor emanating from upper deoria branch, Vishunpur Dy. and upper narayani branch system under the control of irrigation division 1st maharajganj
Request for Proposal For Consultancy services for preparation of Feasibility Report (FR) and Detailed Project Report (DPR) for construction of Foot Over Bridges (FOBs) at six (6) location in Greater Noida City