Loading…
Loading…
3,347 results • Best match
Production and Pouring of Different Grades of Ready Mix Concrete (RMC) as per Design and Technical Specifications from fully Dedicated Concrete Batching Plant at ROB 31-C in District Prayagraj under construction by U.P.SBC Ltd., Bridge Construction U
Extension of Platform Shed at Open space on PF No. 1 and 2 with connection from FOB to existing shed at DDU and Provision of lift (03 Nos ) at VIP parking side and PF 7/8 at DDU station under ADEN/HQ/DDU.
1)Provision of Ramp with roofing in FOB at (STH, BJV, SSC, MALA and NOH) NSG-6 station.2) Development of new sick line covered shed (18x108m) for maintenance of rolling stock in jurisdiction of Sr DEN/I/IZN section of NE Railway.
Provision of 06 meter wide FOB at Aishbagh and Basti Railway stations and improvement works like raising of PF-1 & 2, extension of PF-2, water hydrant, water supply, toilet, pipeline and sanitation at Barhni Railway station of Lucknow Division, North Eastern Railway.
Construction of FOB near Govt. Primary School, Rampur Suiri, Pinjore at Ch. 55.000 on Zirakpur - Parwanoo section from KM 39.960 to KM 67.550 of NH-5 (old NH-22) including Pinjore-Kalka-Parwanoo bypass in the States of PB, HR, HP (2nd Call)
Electrical work connection to 1.Additional work of DEOS station under ABSS. 2.Additional work of BTT station under ABSS. 3.Provision of Foot over Bridge (6.0m wide) at CPJ. 4.Provision of store room at LIJ and JGP, KKT & SSU, New waiting hall at TRJ and miscellaneous work at KKT. 5.Provision of Interlocking LC gates irrespective of TVU on account of Restricted visibility in BSB Division with RTU & Power Supply arrangement (Total 08 No. LC). 6.Provision of Interlocking of LC gates having more than 50000 TVU in BSB Division with RTU & Power Supply arrangement (SQW-RTU-35 Spl & POU-KKT-64 Spl) (Total 02 No. LC).
As per BoQ attached
Bow String Steel girder (Procurement) fabrication erection launching including proof checking of designs by IIT on pier caps complete job of 02 lane ROB in lieu LC no 147B on Chaurichaura-chamda mandi mundera road in distt Gorakhpur
Supply of Crushed Stone Grit 10mm 20mm and Washed Coarse Sand at Construction of ROB Baraut Meerut Road in lieu of LXing No 48T on Delhi Shahdara Shamli Saharanpur Rail Section Near Baraut Railway Station in Distt Baghpat
Design and Construction of 02 lane ROB at LC 32-C of Budhwal-Sitapur Rail Section of North Eastern Railway on Lucknow-Kursi-Mahmudabad Road SH 172 in Mahmudabad Assembly Constituency of District Sitapur, U.P. on EPC Mode
Supply of Crushed Stone Grit 10mm 20mm and Washed Coarse sand For Construction of ROB Baraut Meerut Road in lieu of LXing No 48T on Delhi Shahdara Shamli Saharanpur Rail Section Near Baraut Railway Station in Distt Baghpat
Supplying Laying and Spreading of GSB and WMM at Construction of 2 Lane ROB in LIEU of at L Xing No 49A at Km 49 Over DSA SRE Rail Section on Baraut Meerut Muzaffarnagar Road in Distt Baghpat
Supply of RMC of M35 Grade concrete by Transit Mixture/Self Propelled Mixture Flori and swing pump including pouring in pile for Construction of ROB Xing No 6 Special om Omkar Nagar Tiraha to Balapar Tikariya at Gorakhpur
Four Lane Bridge Construction
Carrying and handling of standard weights for testing, calibration and stamping of all road weigh bridges (04 Nos) and 500 Nos standard weights for a job duration of two year at Krishnashila Project.
Repairing of Bridges , Head regulator cum VRB of Harshpur Dy , Jamalpur Minor and Painting (White cement washing) of V.R.B./D.R.B./P.R.B. Of Lower Rajghat Main Canal between k.m. 30.00 to 44.00 of LRC .
Earthwork in Embankment/Formation, Blanketing, Retaining wall, Extension of bridges, building work etc., in connection with Splitting of longer block section Bhind-Udimor by converting Phooph D-class station into B-Class station
SELECTION OF AN EVENT MANAGEMENT AGENCY FOR DESIGNING, FABRICATING, INSTALLATION, AND MANAGEMENT OF UPRRDA PAVILION AT INTERNATIONAL CONFERENCE ON NEW TECHNOLOGIES AND SUSTAINABLE MATERIALS IN CONSTRUCTION OF RURAL ROADS AND BRIDGES, PRAGATI MAIDAN,
Repairing-Con. Damaged bridges Drain repair work behind police station Kotwali, Chhipi Gate near police post, councilors house near Jyoti Chacha and Prahlad Vatika street No-1 in Sarai Jina in ward-78
Touchless Sanitizer Dispenser, Alcohol Based Hand Rub/Hand Sanitizer
HOSE, RUB, AIR, 3/4IN, 8KG/SQ. CM (Q3)
Design and Construction of bridge, approach road, additional approach road and protection work at Nirsahiya Ghat on Gomti River located on the Kumhayi-Nirsahiya-Bahadurpur route off the Sultanpur-Kudwar Road Block Dhanpatganj Distt Sultanpur EPC Mode
Special repair work of raised footpath, level footpath and drain from ROB Setu to Lohia Path in front of Ministers residence (Haniman). (Chainage - 0.750 to 2.000 on the left side and Chainage - 0.000 to 2.700 on the right side)
Electrical Utility Shifting including Shifting of Electricity Pole and Line for Construction of 2 lane ROB in lieu of level Crossing 76-Special (I.E.R.T. Gate), on Prayag-Lucknow Railway section and Between Phaphamau and Prayag Station and Between La
Supplying Laying and Spreading of GSB and WMM for Construction of 2 Lane ROB Baraut Meerut Road in lieu of L Xing No 48 T on Delhi Shahdara Shamli Saharanpur Rail Section Near Baraut Railway Station in Distt Baghpat
Composite Steel girder (Procurement) fabrication erection launching including proof checking of designs by IIT on pier caps complete job on 04 Lane ROB Between Level Crossing 86B-2 to 550m in East under Barhni Bypass in District Siddharth Nagar
Supervision Consultancy services for the construction of balance works of Bareilly-Sitapur section of NH-24 from Km 262.000 to Km 413.200 including balance works of ROB at Km 290.445 along with approaches in the state of Uttar Pradesh
Supply of Crushed Stone Grit 10mm 20mm and Washed Coarse sand for Construction of ROB Baraut Meerut Raod in lieu of L Xing No 48T on Delhi Shahdara Shamli Saharanpur Rail Section Near Baraut Railway Station in Distt Baghpat
Construction of 02 Lane ROB (End to End including Approaches) in lieu of LC No. 83 at KM 1032/9-11 and LC No. 86-B at Km. 1040/09-11A between Kanpur-Etawah section of North Central Railway
Construction of 11KV line UG/PP/T/F and dismanteling of existing HT and LT at Proposed over bridge at Crossing No.-54, Kirawali-Kagarol road in Kirawali distt. Agra.
20MM GRIT, 10MM GRIT, COARSE SAND
10mm Grit. 20mm Grit, Coarse Sand
20mm Grit, 10mm Grit and Coarse Sand
20MM GRIT 10MM GRIT COARSE SAND
Construction of R.E. Wall and Related Structure of 04-Lane R.O.B. At K.M. 11/5-6 in lieu of Level Crossing No.-11C/2T at Agra Fort-Achnera Rail Section on Runakta-Rohata Marg (South by Pass) Connecting NH-2 to NH-3 in Distt. Agra (Rohta Side)
20 MM GRIT, 10 MM GRIT, COARSE SAND
Construction of Road Work of 04-Lane R.O.B. At K.M. 11/5-6 in lieu of Level Crossing No.-11C/2T at Agra Fort-Achnera Rail Section on Runakta-Rohata Marg (South by Pass) Connecting NH-2 to NH-3 in Distt. Agra.
Construction of Road Work Of Railway Over Bridge, X-ing No. 11C Agra Fort-Achnera Rail Section, Runakta-Rohta Road in distt. Agra
GRIT 20MM, GRIT 10MM, COARSE SAND
GRIT 10MM, COARSE SAND
Construction of Road Work at 02 Lane R.O.B. at Level X-ing No. 63 At Km 1232/9-11 of Kanpur-Tundla Rail Section on Firozabad Railway Station-Labour Colony Road in Distt. Firozabad (U.P.)
Construction of Road Work (Approach Portion) at Construction 2 Lane R.O.B. At Level X-ing No. 83C At Km 1272/31-33 of Tundla-Ghaziabad Rail Section on Jalesar Karnau Sahpau Marg in Distt- Hathras (U.P.)
20MM GRIT 10MM GRIT COARSE SAND
Service Road Work at Construction of 2 Lane R.O.B. At Level X-ing No. 120B G.T. Road Chandaus Marg (Dorau Mod) in Distt- Aligarh (U.P.)
Stone Grit 20mm, Stone Grit 10mm, Coarse Sand
Construction of Road Work at 02 Lane R.O.B. at Level X-ing No. 67 At Km 1239/21-23 of Kanpur-Tundla Rail Section on Hirangaon-Tundla Station Road in Distt. Firozabad (U.P.)
WORK OF SERVICE ROAD
Construction of R.E. Walls and Related Structure of 02 lane Rail over-bridge on Railway crossing number-85B/E-2 (Near Begum Sultan Jahan Girls Hostel AMU) on Aligarh-Anupshahar road in Distt. Aligarh (U.P.)
Construction of Road Work of 04-Lane R.O.B. At K.M. 73/7-8 in lieu of Level Crossing No.-68 B/2E on Idgah Bayana Rail Section on Runakta-Rohata Marg (South by Pass) Connecting NH-2 to NH-3 in Distt. Agra
20MM GRIT, 10MM GRIT, COARSE SAND