Loading…
Loading…
3,347 results • Best match
Tool Kit Bag as per Specification Attached
Sipper Bottle (V2) (Q4) MSE Exemption for Years of Experience and Turnover
Ammonium Salt Of Glyphosate 71% Soluble Granules (V2) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller OEM Authorization Certificate, Additional Doc 1 (Requested in ATC) *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) -- Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6601365 Dated : 25-08-2025 Bid Document 1/5 Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) No Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Required No ePBG Detail Required No Splitting
High Visibility Warning Clothes (V3) (Q2) MSE Exemption for Years of Experience and Turnover No Startup Exemption for Years of Experience and Turnover No Document required from seller Past Performance, Certificate (Requested in ATC), OEM Authorization Certificate *In case any bidder is seeking exemption from Experience Turnover Criteria, the supporting documents to prove his eligibility for exemption must be uploaded for evaluation by the buyer ? ? Do you want to show documents uploaded by bidders to all bidders participated in bid? Yes (Documents submitted as part of a clarification or representation during the tender/bid process will also be displayed to other participated bidders after log in) Minimum number of bids required to disable automatic bid extension 1, -- Number of days for which Bid would be auto -- extended 7 Bid Number : GEM/2025/B/6799145 Dated : 16-10-2025 Bid Document 1/9 Number of Auto Extension count 1 Past Performance 20 % Bid to RA enabled No Type of Bid Single Packet Bid Time allowed for Technical Clarifications during technical evaluation 2 Days ( )/Inspection Required (By Empanelled Inspection Authority/Agencies pre-registered with GeM) Yes Inspection to be carried out by Buyers own empanelled agency Yes Type Of Inspection Pre Dispatch Name of the Empanelled Inspection Agency/Authority RITES Evaluation Method Total value wise evaluation Arbitration Clause No Mediation Clause No Bid Details EMD Detail Advisory Bank State Bank of India EMD Amount 49450 ePBG Detail Advisory Bank State Bank of India (%) ePBG Percentage(%) 5.00 ( ) Duration of ePBG required (Months). 14 (a). EMD EXEMPTION: The bidder seeking EMD exemption, must submit the valid supporting document for the relevant category as per GeM GTC with the bid. Under MSE category, only manufacturers for goods and Service Providers for Services are eligible for exemption from EMD. Traders are excluded from the purview of this Policy. 2/9 (b)., EMD & Performance securityshould be in favour of Beneficiary, wherever it is applicable. Beneficiary : Sr.DFM/NCR/JHANSI Office of the Senior Divisional Finance Manager, Divisional Railway Manager, Compound, North Central Railway, Near Railway Station, Jhansi- 284001 (Sr.dfm/ncr/jhansi)
as per BoQ attached
as per BoQ attached
Supply of Aggregates at ROB 544 Chhata-Barsana Road in Distt- Mathura
SUPPLY OF MACHINE ON HIRE CHARGES FOR ROB 300B IN DISTT HARDOI
25 KV Electrification Work in Connection with Proposed construction of 02 Lane ROB on NH-227A at LC 9C at Railway Km. 19/09-20/0 between sisai Gulab Rai and Barahaj Bazar Stations on salempur-Barhaj Bazar section in Varanasi Division (NH Chainage ... Lane ROB on ...
BALANCE GENERAL CIVIL WORKS WITH CONSTRUCTION OF a) MINOR,MAJOR BRIDGE b) FENCING WORK c) BOULDER PITCHING d)PRE -STRESSED PRECAST SLAB e) BORE CAST in situ pile
Construction of R.E. Wall and Related Structure of 04-Lane R.O.B. At K.M. 11/5-6 in lieu of Level Crossing No.-11C/2T at Agra Fort-Achnera Rail Section on Runakta-Rohata Marg (South by Pass) Connecting NH-2 to NH-3 in Distt. Agra
Construction of R.E. Wall and Related Structure of 04-Lane R.O.B. At K.M. 11/5-6 in lieu of Level Crossing No.-11C/2T at Agra Fort-Achnera Rail Section on Runakta-Rohata Marg (South by Pass) Connecting NH-2 to NH-3 in Distt. Agra (Runakta/Bichpuri S
20MM GRIT, COARSE SAND
R.E. Wall and Related Structure Work of RAILWAY OVERHEAD BRIDGE LEVEL CROSSING NO.-54 AT KM. 0060/01-02 ON BAYANA - YAMUNA RAIL SECTION BETWEEN KIRAWALI (NH-11) TO KAGAROL ROAD IN DISTT. AGRA
Construction of R.E. Walls and Related Structure of 02 Lane R.O.B. at Level X-ing No. 62 At Km 1228/25-27 of Kanpur-Tundla Rail Section on Ashfabad Chauraha-Fatehabad Road in Distt. Firozabad (U.P.)
Construction of R.E. Walls and Related Structure of 02 Lane R.O.B. at Level X-ing No. 63 At Km 1232/9-11 of Kanpur-Tundla Rail Section on Firozabad Railway Station-Labour Colony Road in Distt. Firozabad (U.P.)
Construction of Road Work in Service Road at 02 Lane R.O.B. at Level X-ing No. 43 At Km 1192/15-17 of Kanpur-Tundla Rail Section on Ukhrend-Bhadan Road in Distt. Firozabad (U.P.)
Construction of R.E. Wall and Related Structure of 02 Lane R.O.B. at K.M. 1358/05-09 in lieu of Level Crossing No.-507 at Agra-Palwal Rail Section on Heera Lal Pyau-Panwari Marg in Distt. Agra (NH-2 Side)
Construction of R.E. Wall and Related Structure of 2 Lane R.O.B. At Level X-ing No. 83C At Km 1272/31-33 of Tundla-Ghaziabad Rail Section on Jalesar Karnau - Sahpau Marg in Distt- Hathras (U.P.)
Supply of RMC (Batching Plant) within 10Km from site of M35 Grade concrete by Fiorie/Transit Mixture and swing pump including pouring in pile on 02 Lane ROB Xing No 162A on Domingarh and GKP Railway Stn in Distt GKP (Cement shall e pro by the Deptt)
Design Fabrication Supply Erect and Launching of Steel Composite Plate Girder made of Str Steel Grade Fe-410/E350 IS2062 in Span Nos P9 P10 incl proof checking of designs by IIT for Construction of ROB Xing No 6 Special on NH 29 in Distt Gorakhpur
PMC for preparation of DPR, Pre construction activity and Project supervision for the work of 4 lane construction of Major of 1.20 Km length along with its approaches on NH 135A and construction of ROB at Km 406 on NH 730 in the State of U.P.
Construction of 02 Lane ROB (End to End including Approaches) in lieu of LC No. 349 at KM 1087/8-9, LC No. 394 at Km.1182/1-3 and LC No.434 at Km.1238/216.70 in between Bina-Dholpur section of North Central Railway.
Signal & Telecom cable shifting and circuit alteration work in connection with construction of LHS at 253C(MOTG-BRCK), 267C(GDK-MIR), 283C(CLJ-SUJ), 284C(CLJ-SUJ), 306C(BUW-BUR), 313C(BUR-JBR), 25C(PDR-CLW), 27C(PDR-CLW) & ROB at 189C(MND)in LJN Division.
Supply of RMC Bat Plant of M35 M40 M45 Grade conc as per req in diff components by Transit Mixture Self Propelled Mixture Fiori and swing pump incl pouring in remain Open Foundation Pier Pier Cap Girder DSlab etc for Constr of ROB Xing 5A Nakha GKP
Supply of RMC(Ba Plant) of M35 M40 M45 Grade concrete as per requ in diff components by Transit Mixture Self Propelled Mixture Fiori and swing pump incl pouring in remaining Pier Cap Girder Deck Slab for Constr of ROB Xing No 6 Special in Gorakhpur
Providing and laying GSB, WMM, PC, DBM, TC, BC etc. work in Viaduct portion, R. E. Wall and Service Road of 2 Lane Railway Overhead Bridge (ROB) in lieu of Level Crossing No. 17-C at Km. 768/19-21 on Mugalsarai Prayagraj Rail Section of NC
Manufacturing and installation of 1.5 meter Height of Mono Absorbent Acoustic/Noise Barrier at 02 (Two) lane ROB at L-xing No 75-A, Teliarganj/Mazar to Bara Baghara/Salori Road) in Between Prayag to Fafamau Railway Station at Km. 149/10-1 1 on Prayag
Providing and laying GSB, WMM, PC, TC, DBM, BC etc. work in Approach Road of 2 Lane Railway Overhead Bridge(ROB) in lieu of Crossing No. 78A on Bakshi Bandh at Km.151/1-2 between Prayagraj-Phaphamau Rail Section near Prayag Railway Station in Distric
Providing and laying of Earth, GSB, WMM, PC, TC, DBM, BC etc. work in RE Wall and Service Road of 02 Lane Rail Overhead Bridge (ROB) in lieu of Railway Crossing No. 31-C of North Central Railway on Mugal Sarai-Prayagraj Rail Section at Rail
Execution of Piling by Hydraulic Rig machine of 1.20 m dia cleaning of hole making and lowering of cage pouring of ready mix concrete with Cement (OPC/Ultratech/Prism) of M35 Grade by Trimie Only Steel supplied by Deptt. at 4 Lane ROB 86B-2 SDR
TN-02/EE/2025-26 Repair of damaged pitching located at Km 0.200 of Anupshahar Branch Canal and repair work of damaged bridges located at Km 0.200, 2.137, 4.800, 7.886, 10.611, 13.927, 15.754, 20.102, 23.741, 25.625, 25.726, 25.727, 30.491, 35.071, 37
WIDENING AND STRENGTHENING OF BILGRAM SANDI ALLAGANJ ROAD (SH-138) KM-26 TO PALIYA BEDIJOR TO FARRUKHABAD VIA KADHAR ROAD (MDR-108 C) CHAINAGE 5.350 TO 19.600 (LENGTH 12.560 KM, WITHOUT LENGTH OF BRIDGES) IN DISTT. HARDOI. (WITH FIVE YEARS MAINTENANC
Day to day preventive and minor breakdown maintenance works with coal dirt and slurry cleaning for smooth and un-interrupted dispatch through 04 Nos. (02 Nos. 50T and 02 Nos. 100T) Road Weigh Bridges installed at Dudhichua for 730 days.
Consultancy Services for Preparation of DPR for construction of 02 Lane Bridges (adjacent to existing structure) at Km146.400 (Sharda Canal),Km 162.905 (Sharda River),Km 189.225 (Ghaghra River)and Km 212.724(Saryu River)of NH-730 in the State of UP.
Establishment of 4 No. Highway Nest Mini Shop for sale of food and beverage items on Delhi Meerut Expressway NH No. 9 at Km 0.500 and Km 1.150 on LHS and RHS of Yamuna Bridges in the State of Delhi
Construction of Foot Over Bridges providing and fixing of median guard rail pedestrian guard rail and widening of existing service road on Delhi Agra sec of NH-2 old (New NH-19) in the State of Haryana on EPC Mode
Replacement of girder bridges having spans more than 6.10m & upto 12.20 m (Bridge No. 13, 38, 44, 59, 759 & 793 Total= 6 Nos.) with PSC slabs in the section of ADEN-I-LKO in the jurisdiction of Sr.DEN-I/LKO.
As per tender documents
REFER TENDER DOCUMENT
Lot No.-8
Construction Work
Construction Work
Superior Quality Safety Shoe As Per Specification. (Q3)
Superior Quality Safety Shoe as per IS 15298 (Part 2) 2016 ISO 20345: 2004. As per specification
Portable LED Lighting System, Inflatable (Q2)
Monthly Basis Cab & Taxi Hiring Services - MUV; 2000KM X 720 Hours; Outstation
cotton towels, glass or window cleaners, Alcohol Based Hand Rub/Hand Sanitizer, liquid handwash
Construction of 1200 mm dia R.C.C. Pile Work at 02 Lane Flyover at Road Over Bridge on Urban Road (Length 1291.69 M) from Suhag Nagar to Subhash Chowk/ Jain Temple Chowk in Distt. Firozabad (U.P.)
Providing and laying of GSB, WNIM, PC, TC, DBM, BC etc. work in Approach Road and RE Wall of 02 Lane Rail Overhead Bridge (ROB) in lieu of Railway Crossing No. 31-C of North Central Railway on Mugal Sarai-Prayagraj Rail Section at RailwaY km. 807/23-