Loading…
Loading…
2,651 results • Best match
Construction of High Drain with cover slab from Iraj Sk to Abdul Rob at Puratanhat, Mouza- Hat-Kalna, J.L. No.- 92 under Hat-Kalna G.P. from 15th F.C. (2024-25) Tied Fund.
Construction of ROB at Km-11 of NH-419 at Chittranjan (LC No. 5 SPL/E) in the State of Jharkhand on EPC mode.(JOB NO-NH-419-JHR-2020-21-292).
Balance work of E. R. and Rehabilitation of bridge (Natun Pole) over Diversion Canal at Km 55.50 of NH-117 during 2020-21.
Repairing and Rehabilitation of Bridge at Guma Rajibpur Balisha Road under Barasat Highway Division No II in the district of North 24 Parganas
Signalling and Telecom outdoor Cable shifting work including other gears inconnection with following Engineering works: (i)Strengthening/Rehabilitation/Reconstruction of bridges, 31 No. by pipe pushing and 08 No. rehabilitation in MDN-GBA Section. ... of bridges , ...
25KV OHE Work in connection with Provision of passenger lifts connecting to FOB at ABKA, NDAE, KWAE, AZ,KGLE,HWH,DKAE,TAK,SNT,LLH,BDC,KQU,SALE,BOI,PDA & MYM over Howrah Division OF Eastern Railway.
CIVIL WORKS FOR PROVISION OF 12M WIDE FOB AND OTHER MISCELLANEOUS WORKS AT ANDAL AND PANAGAARH AND OTHER STATIONS IDENTIFIED FOR THE DEVELOPMENT UNDER AMRIT BHARAT STATION SCHEME IN THE JURISDICTION OF GATI SHAKTI UNIT ASANSOL
Carrying out soil investigation in connection with construction of 62.01 m Bow String Girder with four ramps for Shalimar Station development project under South Eastern Railway
SET OF TERMINALS FOR SHOVAN CHAIR CAR COACHES FOR BANGLADESH RAILWAYS., as per Drawing: EDML263,REV-0,, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURI
Provision of LHS/RUB in lieu of "A" class manned LC Gate No. NN/112 (UP & DN) at Km 177/9-178/0 between JOQ-SRPB under the jurisdiction of DEN/I/APDJ.
CORTEN STEEL PLATE 8X1250X5500/6350 MM., as per Drawing: IRS:M-41-1997 SURFACE FINISH SF-1., Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPOR
SPRING WASHER B12, COATING AS PER MDTS 057, as per Drawing: IS:3063-1994 GRADE 60C6, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION.
SET OF PIPE SEALING ARRGT. FOR LHB NON AC COACHES, as per Drawing: MPLSKGSAB VERSION 1, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATIO
CORTEN STEEL PLATE 8X1250X5500/6350 MM., as per Drawing: IRS:M-41-1997 SURFACE FINISH SF-1., Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPOR
Lead Acid cell, Low Maintenance, 2 volt in hard rubber(or Transparent container Polypropylene) container conforming to IRS:S-88-2004(with amdt. upto date if any). The cells should be complete with rub
LIFT STOP FOR PRIMARY SUSPENSION FOR TRAIN-18 BOGIES, AS PER DRAWING :MEDHA Drg.No.:B-A675UV2-138021, REV-01, PACKING INSTRUCTION : AS PER STANDARD PACKING.IT SHOULD BE ENSURE THAT ITEM SHOULD NOT RUB
Lead Acid cell, Low Maintenance, 2 volt in hard rubber(or Transparent container Polypropylene) container conforming to IRS:S-88-2004(with amdt. upto date if any). The cells should be complete with rub
Lead Acid cell, Low Maintenance, 2 volt in hard rubber(or Transparent container Polypropylene) container conforming to IRS:S-88-2004(with amdt. upto date if any). The cells should be complete with rub
SPRING WASHER B20, COATING AS PER MDTS 057, as per Drawing: IS:3063-1994 GRADE 60C6, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION.
Preparation of DPR for Construction of Bridge on Un-bridge Gap over PMGSY Road namely Barakhanji to Ramdaspur Road (via Musthuli) within Katwa-II block, Pkg No. WB-22-BRI-07
Emergent Repairing of Wing Walls of Pampubasti Narrow Bridge and mending damages of DRM chowpathi culvert,Loharpool bridge and Allied works under Alipurduar Division,P.W.D. during the year 2022-23
WORK
PREPARATION OF DPR WITH SURVEY, DRAWING AND DESIGN FOR BRIDGES BEING UNDER TAKEN UNDER PMGSY III FUND WITHIN PINGLA AND GHATAL BLOCKS IN THE DISTRICT OF PASCHIM MEDINIPUR
Sub soil inventigation for proposed construction of Single lane RCC bridge in replacement of existing dilapidated RCC bridge at Korapara, Block-Basirhat-II in the District of North 24 Parganas.
Widening and trengthening of Link Road portion of luberia - Bagnan Road from Uluberia ROB to Gangarampur More of a length of approximately 350.00 Mtr. under Howrah Division, P.W.D. in the district of Howrah
Laying of Rising main pipe line and jack pushing including supplying and fixing for Dihika Water Supply Scheme from Kashinath Lahari School to Kali Mandir behind Rangapara Rob t Haramdih Village within A.M.C
CONSTRUCTION OF RCC BRIDGE OVER JHUMI RIVER AT MONSUKHA UNDER GHATAL BLOCK
Construction of 2 nos RCC bridge at Ch 360 and Ch 720
Civil jobs for facilitating Soil-air interface inspection at DHDT,FOB Block and DYIP Block (Part-A), OHCU Block and LOB Block (Part-B) and DHDS Block (Part-C) during the M and I Shutdown Haldia Refinery.
Construction of 3.00mtr. Span foot bridge over Gorkhey Khola at Gorkha busty, Rungbull, Darjeeling 3.00mm x 1.50 x 0.30m.
Rehabilitation of Bridge over Irrigation Canal at 6.58 km of Rangamati Asuria Dejuri under Bankura Highway Division in the district of Bankura.2nd Call
Lead acid Starter Batteries for Power car, engine starter 8V - 290 AH Capacity, 3 Nos. in 1Set of 24V System IS-7624-1990 assembled with Tubular Positive & Pasted Negative plates in Monoblock Hard Rub
CAPACITOR BANK FOR LHB EOG TYPE COACHES, as per Drawing: EDML130,TYPE-1,REV-1,COR-5., Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION.
SEALING RING A 105/130/12, as per Drawing: DIN 3760/A, Packing Instruction: AS PER STANDARD PACKING. IT SHOULD BE ENSURED THAT ITEM SHOULD NOT RUB DURING TRANSPORTATION. THE ITEM SHOULD BE PACKED
Sub Soil investigation for proposed bridge work at 9th KM of Kachuberia - Gangasagar Road at Fuldubi Canal, Sagar Island under Kakdwip Highway Sub Division during the financial year 2024-25
Construction of Bridges at 1.50 km, 2.50 km and 3.00 kmp of Mahespur to Khurka BOP Link Road, Replacement by old Triple Box Culverts 2 Nos. and 1 no Box culvert under Uttar Dinajpur Highway Division in the District of Uttar Dinajpur.
Sub soil inventigation for proposed construction of double lane RCC bridge 5.50m carriageway in replacement of existing dilapidated RCC bridge at kedua gopalpur ghona , Block basirhat II, Dist North 24 Parganas.
Electrical lighting arrangement for the construction of Road Over Bridge and Approach Ramps at Fulbari Gazoldoba Canal Road in the district of Jalpaiguri
Fencing Work on Culverts Bridges of Kana Darakeswar at various places in different Wards within Arambagh Municipality, District Hooghly under Hooghly Division, M. E. Directorate, Department of UD MA
EXECUTION OF CIVIL WORK AND OTHER ANCILLARY WORKS IN CONNECTION WITH CONSTRUCTION OF ROB BETWEEN STATION BAHIRKHAND TARAKESWAR IN SEORAPHULI TARAKESWAR LINE WITH ELIMINATION OF LC NO. 23A IN HOWRAH DIVISION UNDER EASTERN RLY
Thorough painting of bridge no.1, 1A, 16A, 17, ROB at Barasat, Madhyamgram, Barrackpore, Durganagar, Berhampore Court, Bethuadahari, Bathna Krittibas, Bridge-K/1, S/47, 76T and 17A DN Line etc. in Sealdah Division.
Karimpur Town Bye Pass Road at 1.00 kmp from Natna More to Bathan Para via Kalaberia - Construction of bridge in place of weak bridge under Nadia Division, PWD in the district of Nadia during the year 2018-19.
BRIDGE CONSTRUCTION
BRIDGE CONSTRUCTION
BRIDGE CONSTRUCTION