Loading…
Loading…
262 results • Best match
REPAIR AND MAINT OF CIVIL WORKS TO SPILL WAY, HARDSTANDING, DE-WEEDING AND PURING OF VEGETATION GROWTH AND CONNECTED WORKS AT MES INSTALLATIONS AT CHOULDARI DAM, PROTHRAPUR FILTRATION PLANT, NAD, NTS ETC UNDER AGE B/R II AT GE MINNIEBAY, PORT BLAIR
WELCOME MAINTENANCE TO OFFICER MARRIED ACCN AT PEREIRA ENCLAVE AND PERIODICAL SERVICES TO OTM AND MD ACCN AT NTS , MARCOS, NAD , CHOULDARI DAM , PORTHRAPUR FILTRATION PLANT , DAD QTR PERIERA ENCLAVE AND CERTAIN B/R MISC WORKS UNDER AGE B/R II OF
8823/E8- REPAIR / MAINT OF TANK CLEANING OF OHT SERVOIR, UG SUMPS AND OTHER CONNECTED WORKS AT INS UTKROSH, NTS, NAD, MARCOS, CHOULDHARI DAM, PROTHRAPUR FILTRATION PLANT, VAYU VIHAR BROOKSHABAD, MINNIE BAY, PORT MOUT UNDER AGE E/M-II OF GE MINNIE BAY
Providing wall with Polymer flexible gabion structure for erosion control and protection to existing check weir at Tirur.
8503- REPAIR OF JOINERY AND CERTAIN B/R REPAIRS AT NTS, MARCOS, NAD, CHOULDHARI DAM, PROTHRAPUR FILTRATION PLANT, DAD QTRS,PEREIRA ENCLAVE AND DAY TO DAY COMPLAINTS AND CERTAIN B/R REPAIRS AT LLTR PORT MOUNT UNDER AGE B/R II OF GE MINNIEBAY
Construction of Check weir across Nallah including 1 No Pump House at Tusnabad. S.W Conducting Environmental Impact Assessment Studies
Providing and laying of PPR line at Abdul Kalam Colony Dhanikhari Dam.
Providing Gabion Structure over nallah at Humphrygunj and downstream of Vasundhara Dam
Laying of PPR pipeline from newly constructed earthen weir to existing well at Karupuswamy Nallah Pump House at Bimblitan Village
SITC of 01 No 20HP 15KW Kirloskar Make Electric Monoblock Pump Model KDI 2050 by replacing existing Old 20 HP Electric Monoblock Pump Set at Water Treatment Unit of Kamsarat Dam under SD II APWD WGunj of EandM Div APWD PPur during the Year 22-23
REPAIRS AND MAINT RAISING MAIN PIPE LINE, SLUICE VALVE, AIR RELEASE VALVES CI/DI PIPE LINE FROM CHOULDARI DAM TO MINNIE BAY, CLEANING OF UG SUMPS AND SEMI UG SUMPS AND OTHER ALLIED WORKS AT NTS MARCOS PROTHAPUR CHOULDARI UNDER AGE E/M-II AT GE MINN
RandM/O Water Pump Sets at various Location under B/Flat and W/Gunj area under SD-II, APWD W/Gunj under EandM Division, APWD, Prothrapur 2024-25 SW Re-Winding of 100 HP / 75 KW, 3 Phase, 415V, 50 Hz Induction Motor Installed at Kamsarat Dam
RandM/O Water Pump Sets at various Location under B/Flat and W/Gunj Area under SD-II, APWD W/Gunj under EandM Div, APWD, P/Pur, SVP drg 2025-26 SW SITC of New Outdoor Panel Board in Place of Old Damaged Panel at Kamsarat Dam
Construction of 01 No. Ring well, check weir, pump house and pipeline at Wrightmyo Nallah at downstream under RCD , APWD, Wimberlygunj.
Laying of pipeline from Joda Nallah weir to Brichgunj water treatment plant and construction of intake well, pump house including of pump
SITC of 127HP diesel engine with Kirloskar RKB 125/207 pump at Chouldari Dam
Construction of Check weir, pump house, pipeline and 01 No CWR 2.45 Lakh ltr at Shoal bay 11 under RCD, APWD, Wimberly Gunj
Construction of Check weir, pump house, pipeline and 01 No CWR 2.45 Lakh ltr at Shoal bay 14 under RCD, APWD, Wimberly Gunj
Augmentation of Service network in the downstream side of Kamsarat Dam under Jal Jeevan Mission.
SITC of 127 HP diesel engine with Kirloskar RKB 125/27 pump at Chouldari dam
Construction of 01 No. Ring well , 2 Nos check weir and pump house at Kalatang Nallah at D/S and U/S under RCD,APWD, Wimberlygunj.
Supplying and Laying of 3.5 Core x 185 Sqmm XLPE Power Cable from Old Pump House to New One with Installation of Automatic Star Delta Starter at Kamsarat Dam in lieu of A/R and M/O IEI and EEI to NR Bldgs at PB under SD-IV EandM Div APWD PB drg 21-22
AR and MO Water supply under Ferrargunj Sub Division under RCD, APWD, Wimberly Gunj. S.W Widening of Catchment area of upstream side of Weir No.II at Namunaghar.
AR and MO Rural Water Supply under Sub Division II during 2022 2023. SW Construction RCC Weir at Afra Bay in GNI under CD APWD Campbell Bay.
REPAIRS AND MAINT OF CIVIL WKS TOSLUICE GATE, SPILLWAYS, H/S OVER EARTHERN DAM, RAILING, FOOTPATH, DEWEEDING AND PRUNING OF VEGETATION GROWTH AT BUND STOPES AND CONNECTED WKS AT CHOULDARI DAM AT NAD, NTS AND MARCOS UNDER AGE B/R NOII 8790
Improvement of Road from SH-09 to check dam including CC toe wall at Panighat under RCD Wimberly Gunj.
AR MO Water supply under Ferrargunj Sub Division, during 2023 24. S.W Desilting of Dam No 1 at Namunaghar
CONSULTANCY SERVICES FOR DETAILED STUDY OF CHOULDARI DAM FOR STRUCTURAL STABILITY,CAPACITY AUGMENTATION AND ALLIED SERVICES AT PORT BLAIR
Providing and Laying of D.I. Pipe line from Sonapahad Dam to Ferrargunj 5000 mtr including CC pillars wherever required
Laying of raw water pumping main pipe line from Dhobighat (Calicut) first weir to Birdline water treatment plant and Construction of pump house under SD No.III PHED APWD Prothrapur
AR MO Water supply under Ferrargunj Sub Division, during 2023 24. S.W Desilting of Chakku Pahad Nallah on upstream side of existing check weir No 1 near Panchayat Building Mithakhari
Replacement of complete filter media of Rapid Sand Gravity filter at Water Treatment Plant, Kamsarat Dam under RCD, APWD, Wimberly Gunj.
Replacement of complete filter media of Rapid Sand Gravity filter at Water Treatment Plant, Kamsarat Dam under RCD, APWD, Wimberly Gunj
Improvement of Rural Road from Bangla Pahad link road to Kamsarat nallah Dam through IB at Stewartgunj under RCD, APWD, Wimberlygunj.
AR and MO water supply under Bambooflat Sub Division RCD, APWD, Wimberlygunj during 2022-2023. Sub Work Desilting of Panighat Dam.
Augmentation of Spring Nallah source at Templemyo near GPS Herbartabad by construction check weir, Intake well, pump house and Laying of delivery lines under GP Collinpur under RCD, APWD, Wimberly Gunj
AR and MO water supply under Ferrargunj Sub Division RCD, APWD, Wimberlygunj during 2022-2023. Sub Work Desilting of Chakku Pahad Nallah on upstream side of existing check weir near Panchayat Building Mithakhari.
Augmentation of Spring Nallah source at Hobdypur Ward no.I near Niranjan Singh plantation by constructing check weir, Intake well, pump house and Laying of delivery lines under GP Tusnabad under RCD, APWD, Wimberly Gunj.
AR and MO water supply Sub Division No II under EE PHED Prothrapur during 2023 to 24. SW Providing and fixing of GI sheet spill way for flow of surplus water for Bimblitan weir
Sub Work - Extension of pipeline from Lamiya Bay Source No II Tamboo Nallah beyond 3130 meters to Lamiya Bay Forest Check Post 5920 meters
Improvement of Rural Road Malapuram main Road to Malapuram Water Tank under RCD, Wimberly Gunj in lieu of improvement of Approach road to Bambooflat Dam.
AR and MO water supply under AE FG RCD APWD Wimberly Gunj during 2022-23. SW Desilting of Dam No.-I at RCD APWD Wimberly Gunj.
Extension of Double Row Hume pipe culvert for Upstream and Downstream at Nayashar Dam Junction CH 3900mtr State Highway No. 07 under SD-II, CDIII, APWD
AR and MO Water supply under Ferrargunj Sub Division during 2024-24. S.W Desilting of Dam No.III at Namunaghar under AE, Ferrargunj, RCD, APWD, Wimberly Gunj.
Design, Build and Commissioning Of works SW1, Construction of 4 Nos Weir in Birsa Nagar, Aatam Pahad SW2, Construction of slow sand Filter of 3 .00 Lakhs Liters capacity with Pumping House in Birsa Nagar , Aatam Pahad
AR and MO water supply under AE, Ferrargunj RCD, APWD, Wimberly Gunj during 2022-23. SW Construction of Apron Curtain walls i/c wire mesh fencing as a protection works for existing check weir at Chakku Pahad Nallah.
Addition of filtration tank by demolishing old sedimentation tank and replacement of filter media in existing treatment unit at Netaji Nagar under SD II MID APWD Hut Bay SW Strengthening of existing weir of Waterfall Nallah at Hut Bay
Laying of Raw water pumping main pipe line from Dhobighat Calicut first weir to Bird Line Water Treatment Plant and Co Pump House with installation of pump under Sub Division NoIII PHED APWD Prothrapur SW Supplying Installation Testing and Commission
Laying of pipe line from Joda Nallah weir to Brichgunj water treatment plant and Co intake well pump house including installation of pump SW Providing IEI works for Air force station Port Mourt Pump house Krishna Temple Manglutan Pump house Rubb
ARand MO Water Supply under Wimberly Gunj Sub Division during 2021-22. S.W Construction of 1 No Temporary Shed for pump house at Kamsarat Dam under Wimberly Gunj Sub Division.