Loading…
Loading…
1,518 results • Best match
Construction of 0.5 TPD Biogas plant at Nidanampadu Gudi, Durgi Village, and Mandal in Palnadu district, Andhra Pradesh from Organic waste like Agriculture waste, Cow Dung, Food waste under GOBAR-dhan Project on EPC Mode.
Major Upgradation of Visakhapatnam Railway Station of East Coast Railway on Engineering Procurement And Construction mode
Construction of New multi storied Administrative office Building in premises of Old DCI office- Dr. B. R. Ambedkar Bhawan for Visakhapatnam Port Authority, Visakhapatnam, Andhra Pradesh- on EPC basis.
Widening to 4 Lane with paved shoulder Configuration of Vodarevu Chilakaluripet Section Design Chainage 0.00 to 47.000 of NH 167A Package-I on EPC mode in the State of Andhra Pradesh under Annual Plan 2022 23
Construction of 4 lane access controlled highway from Samarlakota to Achampeta Jn (from km. 0.000 to Km. 12.250) as a part of Kakinada port to NH16 connectivity in Andhra Pradesh on EPC mode under Bharatmala Pariyojana
Atkuru Supplementation scheme on Budameru in G.Konduru Mandal of Krishna District on turn key basis
Standardization of Labour rooms at 67 Health Facilities in Andhra Pradesh on Turn Key basis
Standardization of Labour rooms at 21 Health Facilities in Andhra Pradesh on Turn Key basis
Widening of Kondamodu to Perecherla Section Design Ch. Km 0.00 to Km 49.917 of NH 167AG to 4 Lane with paved shoulder Configuration on EPC Mode in the state of Andhra Pradesh under AnnuaI Plan 2022 23
Consultancy Services for Authority Engineer for Supervision of Widening of Urban Link of NH-42 to 4-lane Km 0 to Km9.2 and formation of Mudigubba bypass 2LPS from Km130.400 to Km137.500 on NH42 on EPC Mode
Construction of approaches to the existing 2Lane ROB in lieu of L.C. No. RV 324 at Km.436.12 13 between Komatipalli and Gajapathimagaram station at km 515.200 NH26 in the state of Andhra Pradesh on EPC mode
Improvement of 4 lane road to 6 lane road and 4 lane dedicated Port Roads for the Port connectivity road from Convent junction to Sheelanagar Junction in the State of Andhra Pradesh on EPC mode (2nd Call)
Construction of 3 lane western side flyover from Design Km 0.300 existing Km.1098.680 (Before Jyothi Mahal Junction) to Design Km 2.770 existing Km.1096.210 (Beyond Ramesh Hospital Junction) on NH16 in Andhra Pradesh on EPC mode.
Const. of EC for Gammon Junc at Km. 903.265 (Blackspot ID No. AP(05)-092)and Diwancheruvu junc at Km. 902.308(Blackspot ID No.AP(03)-299) on NH16 in Andhra Pradesh under NH(O) on EPC mode
Consultancy Services for assisting Authoritys Engineer for supervision of Construction of Major Bridge across Papagni river including approaches at Km 153/200 of Renigunta Kadapa Muddanur road NH716 in the state of Andhra Pradesh on EPC Mode
Strengthening of Bypassed stretch of Amalapuram from Km 91.960 to 99.800 of NH 216 in the State of Andhra Pradesh through EPC Contract under Annual Plan 2021 to 22
One Time Improvement from Km 101.000 to Km 106.600, Km 107.600 to Km 111.600 and from Km 112.600 to Km 124.600 of Madanapalli Naidupeta road NH71 in the state of Andhra Pradesh under NH(O) on EPC Mode
Supervision Consultancy Services SC for Supervision of Operation and Maintenance including Supervision of Completion of Balance work of Timmapuram to Losari Section 5 Packages of NH216 Total length 147 Km 2L PS on EPC Mode in Andhra Pradesh
Strengthening the selected stretches from Km 58.900 to 66.960 Km 74.000 to 75.780 and Km 104.960 to 107.760 of Pamarru Digamarru Road of NH165 in the State of Andhra Pradesh on EPC mode under Annual Plan 2019 20
Widening to 4 lane of existing road from Km 184.200 to Km 191.100 of NH 214A (NH 216) in Bapatla town in Guntur District as one time improvement proposal in the State of Andhra Pradesh on EPC mode
Construction of Bypass Road to Adoni town Connecting NH-167 (Hagari-Jadcherla Road) from Km. 62/700 to 71/400 in Kurnool District in State of Andhra Pradesh, on EPC Mode under Annual Plan 2022-23(2nd call)
Rehabilitation and upgradation to 2 lane with paved shoulders from Design Ch. Km 248/010 to 269/900 i.e., Kurnool/Kadapa border Jammalamadugu. Section of NH167K in the state of Andhra Pradesh on EPC mode under Annual Plan
Construction of 1.4 TPD Biogas plant at Society for Prevention of Cruelty of anmils, Nagamalli Thota in Kakinada district, Andhra Pradesh from Organic waste like Agriculture waste, Cow Dung, Food waste under GOBAR-dhan Project on EPC Mode.
Construction of 0.5 TPD Biogas plant at Sri Lakshmi Narasimha Swamyvari Devastham, Anthervedi Village, Sakhinetipalli Mandal, in Konasema district, Andhra Pradesh from Organic waste like Agriculture waste, Cow Dung, Food waste under GOBAR-dhan ... on EPC Mode .
Construction of 1.4 TPD Biogas plant at Society for Prevention of Cruelty of anmils, Nagamalli Thota in Kakinada district, Andhra Pradesh from Organic waste like Agriculture waste, Cow Dung, Food waste under GOBAR-dhan Project on EPC Mode.
Construction of 0.5 TPD Biogas plant at Byragi Matam Goshala, Kaspa Pentapadu village, Pentapadu Mandal, in West Godavari district, Andhra Pradesh from Organic waste like Agriculture waste, Cow Dung, Food waste under GOBAR-dhan Project on EPC Mode.
Construction of 1.5 TPD Biogas plant at Chilukuri Balaji Goshala, Baruva Peta Village & Panchayat, Sompeta Mandal in Srikakulam district, Andhra Pradesh from Organic waste like Agriculture waste, Cow Dung, Food waste under GOBAR-dhan Project on EPC Mode...
Supervision Consultancy Services SC for Supervision of Operation and Maintenance including Supervision of Completion of Balance work of Losari to Ongole Section 4 Packages of NH 216 Total length 204 Km 2L PS on EPC Mode in Andhra Pradesh
Engagement of user fee agency on the basis through etender for Gorribanda user fp Km.19.755 for the Rehabilitation and up gradation of NH326A in the State of Andhra Pradesh under NH(O) on EPC Mode developed by MoRTH
Permanent rectification of Accident Spot at Lingampally X Road for construction of VOP at Km 463.138 on MH KNT Border to Sangareddy Section of NH 65 Old NH 09 in the state of Karnataka and Telangana on EPC mode
Consultancy service for preparation of Detailed Project Report for One time Improvement for Bypass reach of Naidupeta twon from Km 180/200 to 190/ 600 of NH 71 in the State of AP under NH (O) On EPC Mode
Construction of 1.0 TPD Biogas plant at Iskon Goshala in G. Donthamuru village of Rangampeta Mandal in East Godavari district, Andhra Pradesh from Organic waste like Agriculture waste, Cow Dung, Food waste under GOBAR-dhan Project on EPC Mode.
Construction of 1.0 TPD Biogas plant at Iskon Goshala in G. Donthamuru village of Rangampeta Mandal in East Godavari district, Andhra Pradesh from Organic waste like Agriculture waste, Cow Dung, Food waste under GOBAR-dhan Project on EPC Mode.
One time improvement of bypasssed section of NH 544DD of Kalyandurgam Rayadurgam Molakalmuru road (Rayadurg town including approaches to the ROB) from Km 92.660 to Km 96.191 in the state of Andhra Pradesh under NH(O) on EPC mode
Renovation of Chetnihalli L.I.Scheme on Tungabhadra River in Mantralayam(M) of Kurnool District on turn key basis
Renovation of Chetnihalli LI Scheme on Tungabhadra river in Mantralayam (M) of Kurnool dt.on turn key basis
Standardization of Labour rooms at 16 Health Facilities in Andhra Pradesh on Turn Key basis (Reverse Tender)
Standardization of Labour rooms at 67 Health Facilities in Andhra Pradesh on Turn Key basis (reverse tender)
Standardization of Labour rooms at 67 Health Facilities in Andhra Pradesh on Turn Key basis (Reverse Tender)
Renovation of Chetnihalli LI Scheme on Tungabhadra river in Mantralayam (M) of Kurnool dt.on turn key basis
Renovation of Chetnihalli LI Scheme on Tungabhadra river in Mantralayam (M) of Kurnool dt.on turn key basis
Consultancy Services for Authoritys Engineer for Supervision of Rehabilitation and Up gradation from Km 170 700 Bhadrachalam to Km 234 567 Konta of NH 30 to Two Lane with Paved Shoulders in the State of Andhra Pradesh on EPC mode
Consultancy Services for Authoritys Engineer for Supervision of Widening and Strengthening to four lane of Gorantla Hindupur section of NH-716G from km 120.300 to km 153.880 Package 03 EPC mode in the State of Andhra Pradesh Annual Plan 2022 23
Consultancy Services for Authoritys Engineer for Supervision of Rehabilitation and Upgradation from 2 lane to Four lane of Muddanur to B. Kothapalli section of NH 716G from Km. 0.000 to Km. 56.500 in the State of Andhra Pradesh on EPC mode
Strengthening the selected stretches from km 5.600 to 16.000 and km 18.400 to 20.000 and km 27.400 to 49.350 of Rajamahendravaram Madhurapudi airport section of NH 516E in the state of Andhra Pradesh on EPC mode under Annual Plan 2019 20
Construction of Bypass road to V.Kota (Km.333/400to340/900) and Byreddypalli town (Km315/900to318/250) to 2 lane with paved shoulder of NH-42 (Palamaneru Krishnagiri Boarder) in Chittoor District of Andhra Pradesh on EPC mode under Annual Plan2022-23
Construction of High-level Bridge and its approaches in place of existing Low-level Bridge at Km 466.310 on Penchalakona to Yerpadu section of NH-565 with Two Lane Paved Shoulder configuration in the State of AP on EPC mode.
Rebuilding of 2L ROB with 3L ROB at Rly km.20/201 between Guntur and Vejendla Stations of Guntur-Tenali Section at km.406.300 (LHS) of Chilakaluripeta-Vijaywada sectioni of NH-16 in the state of AP on EPC Mode.
Construction of 2 Lane ROB with approaches in lieu of existing L.C. No. 41E at Km 86/100 (Railway chainage Km 64/5 6) of NH42 under Setu Bharatam in the state of Andhra Pradesh on EPC mode (2nd call)
Construction of VUP including approaches and Service Roads at Chevuru Cross Road at Km.1307.275 (Black spot ID AP-(03)-190-BS) on Chilakaluripeta-Nellore Section of NH-16 (Old NH-5) in the State of Andhra Pradesh on EPC Mode