Loading…
Loading…
1,518 results • Best match
Widening to two lane with paved shoulders of Sangameswaram Nallakaluva Velugodu Nandyal section from Km. 93.819 to 124.530 141.700 to 173.560 of NH 167K in the State of Andhra Pradesh under Annual Plan 2022 23 on EPC mode under NH O
Construction of 1.0 TPD Biogas plant at Goushala at Sri Lord Sri Venkateswara Swamy Temple of D.Tirumala Village & Mandal, Eluru District, Andhra Pradesh from Organic waste like Agriculture waste, Cow Dung, Food waste under GOBAR-dhan Project on EPC Mode...
Consultancy services for preparation of DPR for construction of new 2 alne Major Bridge including approaches from Km.733.800 to Km.739.800 across Penna River on NH67 at Nellore in the State of Andhra Pradesh under NH(O) on EPC mode.
Request for proposal ( RFP ) for Survey Investigation , Detail Design and Construction of Major Arterial Road - ELevated Corridor , E05 Road ( Package XXIII) on EPC basis in Amaravati Capacity City , AndhraPradesh ( including DLP -2 Years )
Desinfection drinking water of Saluru water supply distribution system on turn key basis from 12 months (2023-24)
Request for proposal (RFP) for Survey Investigation , Detail Design and Construction of Major arterial road Elevated Corridor , N13 Road ( Package - XXV ) on EPC basis in Amaravati Capital City , Andhra Pradesh ( including DLP 2 years )
RFP for Rehabilitation and Upgradation to 2-lane with paved shoulder configuration of Lambasingi to Paderu section Km 205/000 to Km 253/010 of NH-516E in the State of Andhra Pradesh under Green National Highways Corridor Project GNHCP on EPC mode
Engagement of user fee agency on the basis of EQ through etender for Annampalli FP (Km 78.000) for rehabilitation and upgradation of Gurajanapalli to Pasarlapudi of NH-216 to two lane with paved shoulder in the State of Andhra Pradesh on EPC mode
Engagement of user fee agency on the basis of CB through etender for Gorribanda FP Km 19.755 for the Rehab and upgradation of NH326A to two lane with paved Shoulders in Andhra Pradesh under NH(O) on EPC Mode developed by MoRTH
Consultancy Services for Assisting Authoritys Engineer for supervision of Construction of Tadipatri bypass from Km 0/000 to Km 6/285 of 4 lane on NH67 in Ananthapuramu district in the State of Andhra Pradesh on EPC mode under Annual Plan 2022 23.
Rehabilitation and Upgradation to 2 lane with paved shoulders configuration of Bowdara to Vizianagaram section Km 0/000 to Km 26/937 of NH 516E in the State of Andhra Pradesh under GNHCP with the loan assistance of World Bank on EPC mode.
Rehabilitation and Upgradation to 2-lane with paved shoulders configuration of Paderu to Gondiguda section (Km 2/400 to Km 27/480 ) of NH-516E in the State of Andhra Pradesh under (GNHCP) with the loan assistance of World Bank on EPC mode.
CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF Rehabilitation And Upgradation Of NH165 From Km 0 000 To Km 64 020 (Pamarru To Akiveedu Section) To Two Lane With PS in The State Of AP On EPC Mode Under Annual Plan 2020-21
CS for AE for Supervision of Construction of 4 lane access-controlled highway from Samarlakota to Achampeta Junction (from km. 0.000 to Km. 12.250) as a part of Kakinada port to NH-16 connectivity in AP on EPC mode under Bharatmala Pariyojana
Upgradation of port connectivity NH configuration from existing 2-lane-4-lane road from Achhampeta junction (NH-216) to Kakinada anchorage port connecting Vakalpudi light house (from Ch.0.0 to Ch.13.198) in the state of AP on EPC Mode under BMP
CS for AE for Supervision of Improvement of 4 lane to 6 lane road (Public Road) and Construction of 4 lane dedicated Port Road for the Port Connectivity Road from Convent Junc. to Sheela Nagar Junc. in Andhra Pradesh on EPC Mode
CS for AE for Const. of EC for Gammon Junc. at Km.903.265 BS ID No.AP-05-092 and Diwancheruvu junc. at Km. 902.308 BS ID No. AP 03 299 on NH-16 in Andhra Pradesh under NH(O) on EPC mode
Construction of 2 lane ROB with approaches in lieu of existing LC No.119 at Km 226/80 of NH205 (New NH71) under setu Bharatam in the state of Andhra Pradesh under NH(O) for the year 2021-22 on EPC Mode.
Rehabilitation and up-gradation of existing road from 2 lane to 2 lane with paved shoulders from Km 0 000 to Km 53 590 53.590 Km of Rayachoty to Vempalli section of NH 440 in the State of Andhra Pradesh on EPC mode
Rehabilitation and Upgradation of Existing two Lane Road to 4Lane With Paved Shoulders from km 32 00 to km 79 650 Puttaparthi Koduru Section of NH342 in Sri Satyasai District in the State of AP on EPC Mode under Annual Plan 2022 23
Rehabilitation Upgradation of Newly Declared National Highway Somayajulapalli Dhone Road of NH 340B from Km.0.0 To 56.200 Design Ch. Km 0.00 to km 53.33 to two lane with paved shoulders in Kurnool District in the State Of Andhra Pradesh on EPC Mode
Consultancy services for preparation of Detailed Project Report for widening and strengthening to 2-lane with paved shoulder from intermediate lane of NH-516E from km 16.000 to 28.800 of Rajamahendravaram to Rampachodavaram in the State of Andhra ... on EPC mode
Construction of half flyover at Km.1082.320 Design Chainage at Km 0.740 at Vijayawada Airport near Gannavaram on Gundugolanu Vijayawada section of NH 16 in the State of Andhra Pradesh on EPC Mode towards rectification of Black Spot ID AP 02 093
Rehabilitation and Up-gradation of NH-167B from Km 99.103 (CS Puram) to Km 143.320 (Malakonda) to two lane with paved shoulders in Andhra Pradesh through EPC Contract under Annual Plan 2021-22
Rehabilitation and Re-Construction of Devarapalli to Jeelugumilli (NH 516D ) from Km0.000 to Km 20.000 to two lane with paved shoulders in the State of Andhra Pradesh on EPC Basis under Annual Plan 2019-20
Revival/Renovation of Tangatur L.I. Scheme on Kundu River in Banaganapalli (M) of Kurnool District on turn key basis
Standardisation of Labour Rooms in region I (Kurnool, Kadapa, Chittoor and Ananthapur) on turn key basis in Andhra Pradesh
Revival/Renovation of Tangatur L.I. Scheme on Kundu River in Banaganapalli (M) of Kurnool District on turn key basis
Muktyla Lift Irrigation Scheme on Left Bank of Krishna River Near Muktyala Village of Jaggayyapet Mandal, Krishna District Detailed Investigation, Engineering, Estimation, Design and Construction of Lift Scheme Operation and Maintenance of entire ... under EPC Turn Key System
Investigation, Design, Engineering, Procurement and Construction of Grand memorial of Sri Nandamuri Taraka Rama Rao (NTR) with 60m height bronze statue including base and Pedestal, RC wall Super Structure, St. steel, Bronze cladding, Architectural Finishes, Internal Electrical, Internal Plumbing, Internal Fire Fighting, Elevator Works and Hill Roads works including Two Years Defect Liability Period and O&M for 5 Years at Neerukonda, Amaravati, Andhra Pradesh
Investigation, Design , Engineering , Procurement and construction of Grand memorial of Sri Nandamuri Taraka Rama Rao ( NTR) with 60 m height bronze statue including base and pedestal , RC wall super structure , St.steel , Bronze cladding , Architectural finishes , internal electrical , Intenal plumbing ,Internal Fire Fighting , Elevator works and hill roads works including two years Defect Liability Period and O&M for 5 years at Neerukonda, Amaravati Andhrapradesh
Investigation, Design , Engineering , Procurement and construction of Grand memorial of Sri Nandamuri Taraka Rama Rao ( NTR) with 60 m height bronze statue including base and pedestal , RC wall super structure , St.steel , Bronze cladding , Architectural finishes , internal electrical , Intenal plumbing ,Internal Fire Fighting , Elevator works and hill roads works including two years Defect Liability Period and O&M for 5 years at Neerukonda, Amaravati Andhrapradesh
Investigation, Design, Engineering, Procurement and Construction of Grand memorial of Sri Nandamuri Taraka Rama Rao (NTR) with 60m height bronze statue including base and Pedestal, RC wall Super Structure, St. steel, Bronze cladding, Architectural Finishes, Internal Electrical, Internal Plumbing, Internal Fire Fighting, Elevator Works and Hill Roads works including Two Years Defect Liability Period and O&M for 5 Years at Neerukonda, Amaravati, Andhra Pradesh
Widening from two lane to 2 lane with paved shoulders of link road between NH40 and NH440 from Km 0/000 to Km 1/532 of Rayachoty bypass in the state of Andhra Pradesh NH(O) for the year 2023 24 on EPC mode.
Rebuilding of ex. 2L ROB with 3L ROB at Rly km.421-6-8 between Peddavadlapudi and krishna canal jn. stn. of Gudur Vijayawada sec ast km.431.415 LHS of Chilakaluripeta Vijaywada section of NH 16 in the state of AP on EPC Mode.
Widening and Strengthening of existing two lane road of bypassed reaches of Punganur town limits from Km.0.000(design Chainage) to Km.10.035 (design chainage) on NH-42 as one time improvement in the state of Andhra Pradesh under NH(O) on EPC mode.
Completion of Balance works (item rate and EPC mode) and Operation of Maintenance of Tirupati-Tiruttani-Chennai Section of NH-205 from Km 274/800 to Km 338/030 in Andhra Pradesh and from Km 0/000 to Km 61/470 in Tamil Nadu
Construction of proposed 2 lane ROB and its approaches in lieu of existing Level Crossing No.120 at Km.56.700 of NH18 (New NH40)under Setu Bharatam in the state of Andhra Pradesh under NH(O) for the year 2021 22 on EPC MODE
WIDENING and STRENGTHENING OF 2/4 LANE TO 4 LANE CARRIAGEWAY FROM KM 6/0 TO 15/0 OF KURNOOL GUNTUR ROAD (NH-340C) IN KURNOOL DISTRICT (KURNOOL MUNICIPAL CORPORATION LIMITS) IN THE STATE OF ANDHRA PRADESH THROUGH EPC MODE OF CONTRACT UNDER NH(O).
Widening to 2-lane with Paved shoulders of Dornala to Kunta Junction from Design Chainage Km 244.000 to Km 267.990 (Existing Km.244.000 to 268.700) section of NH-765 (Package-2) in the State of Andhra Pradesh on EPC mode for the year 2022-23
Hiring of Consultants - Milestone/Deliverable Based - HIRING SERVICES OF A PROJECT MANAGEMENT CONSULTANT PMC TO CARRY OUT FEASIBILITY STUDIES DETAILED ENGINEERING FINALISATION OF EPC CONTRACT SUPERVISION IN EXECUTIONS AND COMMISSIONING OF DG SET AT G..
Revival/Renovation of Thimmanadoddi L.I. Scheme on Tungabhadra River in C. Belagal (M) of Kurnool District on turn key basis
Operation and maintenance of water supply Chlorination on turn key basis for 12 Months (2017-18). Est. Cost. Rs.33.00 Lakhs.
Supply,Erection,Testing and Commissioning of 33KV Features at 132KV/11KV SS Undavalli (Kondaveetivaagu) in Guntur Dt on Turn key basis
Rehabilitation and Up gradation of existing road to two Lane with paved shoulder configuration from Design Chainage Km. 36/400 to Km. 107/224 of NH-167BG from Duttaluru (at NH-565 Junction) to Kavali (Joining on NH-16) in the State of AP on EPC mode
Engagement of user fee collection agency on the basis of CB through e-tender at Vaddupalli FP at Km. 14.500 of NH-544DD from Km 0.000 to 56.000 of Anantapur-Kalyandurg section of two lane with paved shoulders on EPC mode under NH(O) in Andhra Pradesh
Construction of Flyover at Km 936.440 in Jonnada Jn, at Km 967.180 in Undrajavaram Jn, at Km 970.370 in Tetali Jn, VUP at Km 1006.525 in Kaikaram Jn for rectification of Blackspots and Flyover at Km 910.760 ofNH-216A in Morampudi Jn in AP on EPC Mode
One time improvement to the road in Bypassed stretch of NH 544E via overlay from Km 58/970 to Km 62/980 (Madakasira town limits) of Kandikonda Madakasira Sira Road in the State of Andhra Pradesh under NH (O) for the year 2023 24 on EPC mode.
Widening of existing road to 4 lane with paved shoulder from Km 0.000 to Km 51.119 existing ch km 476.700 to km 523.530 51.119 Km of Tadipatri to Muddanur Bypass section of NH67 in the State of Andhra Pradesh on EPC mode under Annual Plan 2021 22
Widening and Reconstruction of existing road to 4lane from Km 56.400 to Km 120.300 i.e. from B. Kothapalli Junction to Gorantla excluding Kadiri Bypass from Km 70.200 to Km 77.105 of NH 716G in the State of Andhra Pradesh on EPC mode under AP 2021 22