Loading…
Loading…
227 results • Best match
IRQP Work in KM 0.860 to KM 28.34 of NH-333 for the year 2019-20 ON EPC MODE IN THE STATE OF BIHAR
PR Work from ch.93.612 to ch.98.000 of NH 327E for the year 2022 23 on EPC mode in the state of Bihar.
PR Work from Ch.98.00 to ch.112.000 of NH 327E for the year 2022 23 on EPC mode in the state of Bihar.
Improvement and Upgradation of NH-727A from Km 88.670 (Rampur bujurg) UP Border to Km 92.992 (Mairwa) Siwan for the year 2024_25 on EPC Mode.
Construction of 4- Lane Chapra- Manjhi By-Pass Connecting NH-19 and NH-85 on EPC mode in the state of Bihar (Length-7.155 Km)
Widening and Strengthening to two lane with Paved Shoulder of NH 81 from Km 30.250 to 55.400 in the State of Bihar on EPC mode.
Strengthening work from Chakia NH28 to Lalachhapra chowk via Kesariya from km 118.040 to km 142.756 of NH227A on EPC Mode in the State of Bihar
Construction to Two laning with paved shoulder of Daudnagar Bypass Nasriganj Bypass and Dawath Bypass of NH 120 in the State of Bihar on EPC Mode.
mprovement to 2 lane with PS of stretch from Bikramganj-Dawath-Maleyabagh-Nawanagar-Dumraon of NH-120 CH-201.665 to 240.200 excluding Dawath Bypass on EPC mode
Construction of VUPs at km 565.175, at km 574.550 and at km 593.660 of NH-122 (Old NH 28) in the State of Bihar on EPC mode.
6laning of Aurangabad to Bihar Jharkhand Border (Chordaha)Section of NH2 from km. 180.000 to km. 209.827 (PKGI) in the State of Bihar under Bharatmala on EPC Mode.
PBMC work from km 154.00(Tamkulha) to km 166.00(Jagur) of NH-327E on EPC mode in State of Bihar (Job No. NH-327E/BR/2023-24/89)
One time improvement of left out portion of NH-80 from km 119.885 Dogachhi to km 132.895 Zero mile Bhagalpur on EPC mode in the state of Bihar
Construction of Four laning of Rajauli Bakhtiyarpur section from Km 47.723 to Km 54.405(Package I) of NH31 (New NH20) on EPC mode in the State of Bihar.
Construction of 04 four nos School Building at Central University of South Bihar Gaya on Engineering Procurement and Construction (EPC) Basis SH : Construction of School of law and Governance G plus 2 with provision of additional one floor in future ... on EPC basis
Construction of VUP at Tajpur Junction (Existing chainage 565.550), Mushrigharari Junction (Existing Chainage 574.550 and Dalsingh Sarai Junction (At Existing Chainage 539.660) on EPC Mode in the State of Bihar.
Construction of Foot Over Bridge (2 Nos. at km 11.700 and 26.100) over 4 lane Narenpur - Purnea Section of NH -131 A in the state of Bihar on EPC Mode.
Strengthening and improvement of Gorakhpur Kasia UP/Bihar Border Sec of NH27 from Ch. Km330.002 to Km 366.117 (TL 36.115 Km)on EPC Mode in the state of Uttar Pradesh
Construction of 4-lane Elevated Section and at-grade improvements at Begusarai town section of NH31 from design Chainage 221.047 to 225.302 in the State of Bihar on EPC Mode
Construction of Boundary wall including RCC retaining wall, MSE wall, Pre-cast compound wall, Main gate complex and other associated works for AIIMS at Darbhanga (Bihar) and their maintenance during Defect Liability Period on Engineering, Procurement and Construction ... ( EPC ) ... (EPC) basis .
Construction of 2 nos. Foot Over Bridges (FOBs) on Standalone basis at Km. 45.240 Km. 54.640 on Galgalia-Araria section of NH- 327E in the state of Bihar on EPC mode
Six laning of Aurangabad to Bihar-Jharkhand Border (Chordaha) Section of NH-2 from km. 180.000 to km. 209.827 (PKG-I) in the State of Bihar under Bharatmala on EPC Mode
Construction of New Major Bridge over Baghmati and Lakhandei River along with Approaches from Design km.16.500 to km.21.500 on NH-527C in the State of Bihar on EPC Mode
Strengthening work in Ch. 123.00 to 142.00 of NH-333A on EPC Mode in the State of Bihar for the year 2019-20(Job No. NH-333A-BR-2019-20/21)
Balance work with Steel superstructure including approaches of new bridge over Gandak river in km. 423.00 - 424.00 of NH -28 (New NH - 27) in the state of Bihar on EPC mode.
Construction of four lane Arrah bypass (Asni to Baonpali) from Km 0.000 (Design Chainage) to Km 4.500 (Design Chainage) of NH319 (Old NH30) in the State of Bihar on EPC Mode
Construction of 4 Lane Elevated Highway and at-grade improvements at Gopalganj Town from Design Ch. 384.000 to Design Ch. 386.750 on NH 28 in the state of Bihar on EPC mode
Construction of New Building Project at central University of South Bihar, Panchanpur, Gaya on EPC mode. SH: Construction of Approach Road for underground tank and STP from main road at CUSB, Gaya.
CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR IMPROVEMENT TO TWO LANE WITH PAVED SHOULDER FROM RAMNAGAR TO ROSEDA FROM KM 3.500 TO KM 43.000 OF NH 527E ON EPC MODE IN STATE OF BIHAR.
Construction of 4 Lane Viaduct intermediate along with re wall approaches with flexible pavement in the Elephant Corridor of Singhara Binjhabahal section of NH 6 in the State of Odisha on EPC Mode
Consultancy services for Authoritys Engineer for supervision of Construction of four lane of Chausa_Buxar Bypass from km 45.000 to km 65.915 (Package 2) of NH 319A in the state of Bihar on EPC mode.
Construction of Four Lane Highway from Gazipur-Ballia UP-Bihar State Border (Greenfield) section of NH-31 Package-IV Buxar Spur of length 17.270 km on EPC Mode in the state of Uttar Pradesh
Rehabilitation and Widening work for 2lane 2 Lane with Paved Shoulder of Existing NH 80 from km 70.15 to Km 121.025 of Munger Sultanganj Bhagalpur section on EPC Mode in the State of Bihar
RFP for 6-laning of Kanhauli-Ramnagar section of SH-78 (declaration of NH under consideration) from design Ch.Km 0.000 to Km 39.160 on EPC Mode in the State of Bihar under Bharatmala Pariyojana
Construction of Foot Over Bridge at Eleven locations at Six laning of Varanasi -Aurangabad Section of NH -2 from Km. 786.000 to km. 978.400 in the state of UP and Bihar on EPC Mode.
Development of New Civil Enclave at Darbhanga Airport. SH - Construction of New Terminal Building, Allied Structure and External Development works on Engineering Procurement and Construction (EPC) Model.
Balance work of new bridge on Gandak river including approaches and rehabilitation of the existing Gandak bridge at km 206.436 of Chhapra- Hajipur section of NH-19 in the state of Bihar on EPC mode
FOUR LANING OF PARARIA TO MOHANIA SECTION OF NH 319 OLD NH 30 FROM KM 54.530 TO KM 115.330 DESIGN CHAINAGE IN THE STATE OF BIHAR UNDER BHARATMALA PARIYOJANA PH-I ON EPC MODE PACKAGE II
Construction of 6Lane Bridge and its approaches across River Ganga as Part of Patna Ring Road (NH131G) starting from Km 8.480 near Sherpur to Km 23.000 near Dighwara in the state of Bihar on EPC Mode.
4 LANING OF ARRAH TO PARARIA SECTION OF NH-319 OLD NH-30 FROM KM 0.000 TO KM 54.530 DESIGN CHAINAGE IN THE STATE OF BIHAR UNDER BHARATMALA PARIYOJANA PHASE-I ON EPC MODE PACKAGE I
Construction of Four Lane Highway from Gazipur-Ballia UP-Bihar State Border (Greenfield) section of NH-31 Package-II from Shahapur (km 42.500) to Pindari (km 78.150) on EPC Mode in the state of Uttar Pradesh
Construction of 3 no of Bypasses at Sheikhpura, Jamui and Khaira alongwith 1no of realignment at Sikandra with pre_construction activity(total length_13.472Km)to 2lane with paved shoulders standard alongwith Utility Shifting in NH333A under EPC mode
Construction of Four Lane Highway from Gazipur-Ballia UP-Bihar State Border (Greenfield) section of NH-31 Package-I from Hridaipur (km 0.000) to Shahapur (km 42.500) on EPC Mode in the state of Uttar Pradesh
Consultancy Services of Authority Engineer for construction of new major bridge over Baghmati and Lakhandei River along with approaches from design km. 16.500 to km. 21.500 on NH 527C in the State of Bihar on EPC mode
Removal of at-grade junction near Repura at Garkha Bypass on 2-laning with Paved shoulder of Chhapra-Rewaghat - Muzaffarpur section of NH 102 (New NH -722) in the State of Bihar on EPC mode 2nd call.
Removal of at-grade junction near Repura at Garkha Bypass on 2-laning with Paved shoulder of Chhapra - Rewaghat - Muzaffarpur section of NH 102 (New NH -722) in the State of Bihar on EPC mode 3rd call.
Widening from 2lane to 4lane of km 92.935 start point of old NH82 to 99.685 km End Point of Gaya Bypass of NH83 of NH120 Total Length 6.750 km on EPC mode in the State of Bihar.
Improvement to two lane with paved shoulders of BH WB Border Amdabad Manihari section from design Km 0.000 to Km 23.945 of NH 131 A Total length 23.945 Km under EPC mode in the state of Bihar
Improvement to two lane with paved shoulders of BH WB Border Amdabad Manihari section from design Km 0.000 to Km 23.945 of NH 131 A Total length 23.945 Km under EPC mode in the state of Bihar
Widening to Two Lane with Paved shoulders including strengthening work from km 14.500 to km 30.000 of NH101 New NH 331 on EPC mode in the state of Bihar for the year 2021 22 Length 15.50 Km