Loading…
Loading…
810 results • Best match
FOUR LANING OF PARARIA TO MOHANIA SECTION OF NH 319 OLD NH 30 FROM KM 54.530 TO KM 115.330 DESIGN CHAINAGE IN THE STATE OF BIHAR UNDER BHARATMALA PARIYOJANA PH-I ON EPC MODE PACKAGE II
CS for AE of Const. of 4L South East Bypass for Azamgarh City connecting NH28 at exist Ch. Km 218.800 to Purvanchal Expressway at exist Ch. Km 247.850 TL 14.905 Km in UP on EPC Mode
Construction of Six lane Elevated Structure at Gondal Chowkdi at Ch. Km 175.000 on existing 4 lane Jetpur Gondal Rajkot section from km 117.600 to km 185.000 on NH27 (old NH8B) in Gujarat on EPC mode.
Construction of 4 lane Greenfield North East side Gorakhpur bypass (26.616 kms) starting from NH29E (Km 83.308) and end at NH28 (Km 285.100) under NHDP Phase-7 in Uttar Pradesh under Bharatmala pariyojana on EPC mode
Construction of 6Lane Bridge and its approaches across River Ganga as Part of Patna Ring Road (NH131G) starting from Km 8.480 near Sherpur to Km 23.000 near Dighwara in the state of Bihar on EPC Mode.
Construction of 4 lane Elevated corridor of Kalimandir-Dimna Chowk-Baliguma (Jamshedpur) Section of NH-33 (New NH-18) (from km 241.940 to km 251.961) (Length 10.021 km) under NH(O) on EPC mode in Jharkhand
Construction of 8Lane access-controlled expressway starting from junction with SH-152 near Matariya Vadi and near Bhamaiya village in Panchmahal district (Ch.756.052-781.282) section of Delhi-Vadodara GAon EPC Mode under BMP in Gujarat
4 LANING OF ARRAH TO PARARIA SECTION OF NH-319 OLD NH-30 FROM KM 0.000 TO KM 54.530 DESIGN CHAINAGE IN THE STATE OF BIHAR UNDER BHARATMALA PARIYOJANA PHASE-I ON EPC MODE PACKAGE I
Construction of 6-Lane Durg Raipur Arang Bypass section of NH-53 from design ch. 0.000 (Vill. Tendesara) to design ch. 44.500 (Vill. Parsada) in the State of Chhattisgarh on EPC Mode under Bharatmala (Package A)
Construction of Six lane Bhandara Bypass, Section of NH-53 (Old NH-06) from km 485.000 (Design km 485.000) to km 499.545 (Design km 499.800) under Bharatmala Pariyojana in the state of Maharashtra on EPC mode
Construction of Flyover/Grade Separators at Balwa Junction (Km 35.320) and Banat Junction (Km 43.380) on NH 709AD and NH 709B including associated road works and structures in the state of Uttar Pradesh on EPC mode
Construction of Eight lane access controlled Expressway from km 128.000 to km 154.600 of Vadodara Mumbai Expressway (Karvad to Jujuwa section) in the State of Gujarat on EPC Mode under Bharatmala Pariyojana (Phase I Package IX)
Construction of Four Lane Highway from Gazipur-Ballia UP-Bihar State Border (Greenfield) section of NH-31 Package-II from Shahapur (km 42.500) to Pindari (km 78.150) on EPC Mode in the state of Uttar Pradesh
Construction of Eight lane access controlled Expressway from Km 154.600 to Km 190.000 of Vadodara Mumbai Expressway (Jujuwa to Gandeva Section) in the State of Gujarat on EPC Mode under Bharatmala Pariyojana (Phase I Package-VIII)
Consultancy Services for Implementation of RAP for Rehabilitation and Upgradation of Paonta Sahib-Gumma-Fediz of NH-707 in the State of Himachal Pradesh under GNHCP with the loan assistance of World Bank on EPC mode
Construction and Development of 4-6 lane divided carriageway for THDCIL bypass for Re-routing of Ghaziabad-Aligarh NH-91 project in THDCIL area on EPC mode under NHDP Phase-IV in the State of UP
CS for AE for Supervision of 7 Nos. of NRCW projects on EPC Mode on Taloda Burhanpur section of NH 753BE Tarsod Fagne Section of NH 53 passing through Jalgaon city in the State of Maharashtra
Turn Key Solution of Hardware infra for IMD in-house developed Web-based Weatherforecasting DSS
Rehabilitation and Upgradation to Intermediate-lane configuration of Gumma-Fediz Section (km 94.900 to km 103.550) of NH - 707 in the State of Himachal Pradesh under GNHCP with the loan assistance of World Bank on EPC mode
Consultancy Services for Implementation of the Resettlement Action Plan (RAP) for Rehabilitation and Upgradation of Ras Beawar Asind Mandal Section in the State of Rajasthan under GNHCP with the loan assistance of World Bank on EPC mode.
CS for AE for Supervision of Construction of 69 Bridges including approach road on the Tamu Kalewa Kyigone (TKK) section from km 0.00 to km 149.70 of Trilateral Highway in Myanmar to be executed on EPC mode
Development of of 6 lane access control greenfield highway of Delhi-Saharanpur-Dehradun economic corridor under BP from Design Chainage 56.500 (Vill-Karaunda Mahajan) to Design Chainage 82.000 (Vill-Khyawari) in UP on EPC Mode (PKG-III).
Four Lanning of NH-965G from km 83.500 (Indapur) to km 130.202 (Tondale) Design Length 46.702 km and One time improvement of selected stretches (Package-III) in the State of Maharashtra under Bharatmala Pariyojna on EPC mode
Upgradation of 2/4 Lane with Paved Shoulders of Hansi Barwala road section of NH-148B (Existing Km 170.668 to km. 194.938 (Design length 24.27 km)) on EPC mode in the State of Haryana under NH (O).
Four Lanning of NH-965G from km 41.369 (Baramati) to km 83.500 (Indapur) Design Length 42.131 km and One time improvement of selected stretches (Package-II) in the State of Maharashtra under Bharatmala Pariyojna on EPC Mode
Construction of Eight Lane Carriageway starting near Major Bridge on Mej River to Junction with SH-37A (Ch. 331.030-359.170) section of Delhi-Vadodara Access Controlled GFA (NH-148N) on EPC Mode under Bharatmala Pariyojana in Rajasthan
Construction of 3 nos. of VUPs at Ayodhya Bypass from km.1353.120 to km.137.060 (Design Length- 1.940 km) of NH27 (old NH-28) for Ayodhya Awas Vikas Parishad on EPC Mode in Uttar Pradesh. (2nd Call)
Const. of Double loop dumbbell Interchange at the Junc. of NH52 HR n RJ Border Barwala and NH9 Delhi Sirsa at Dhandhoor in Haryana as part of Amritsar Kolkata Industrial Corridor under NH O on EPC mode
Construction of 4 lane Realignment of Old NH 207 (New NH 648) from TN/KA Border (CH 0.000) to Hoskote (CH 20.900) under Bharatmala Pariyojana as a part of Bangalore Ring Road in Karnataka on EPC Mode
Development of 6 lane access control greenfield highway of Delhi-Saharanpur-Dehradun economic corridor under Bharatmala Pariyojana from Design Chainage 27.000 (Vill-Lohadda) to Design Chainage 56.500 (Vill-Karaunda Mahajan) in UP on EPC Mode (PKG-II)
4 Laning with paved shoulders from Km 0.900 to Km 11.650, Missing Link Project (Budhel Junction to Nari circle including Flyover at Nari and its approaches) section of NH51 in the state of Gujarat on EPC Mode
Construction of 3 lane western side flyover from Design Km 0.300 existing Km.1098.680 (Before Jyothi Mahal Junction) to Design Km 2.770 existing Km.1096.210 (Beyond Ramesh Hospital Junction) on NH16 in Andhra Pradesh on EPC mode.
Construction of underpasses at 5 blackspot locations in the project highway at specified locations from Ch. 23.600 to Ch. 149.900 of NH34 (Old NH91) from Ghaziabad to Aligarh on EPC Mode in the State of Uttar Pradesh
Consultancy Services for AE for Supervision of Construction of 8-lane access controlled Greenfield Delhi-Vadodara Expressway starting at Rajasthan-MP Border to Bardawadi village of Mandsaur district in Madhya Pradesh on EPC mode under BM Pariyojana
Construction of 8 Lane access controlled expressway starting from junction with SH63 Pratap Nagar village ending junction with NE1 near Dodka of Vadodara District section Delhi Vadodara Greenfield Alignment on EPC Mode under BM Pariyojana in Gujarat.
Upgradation to Two lane with Paved Shoulders of Lakhpat Gaduli Zara Hajipir Khavda Kandwan Dholavira section of NH754K from Design km 0.000 to km 169.880 (Total length 165.585 km) in the state of Gujarat on EPC mode.
Balance Works for 6 Laning of Sriperumbudur to Karapettai Sec of NH4 (New NH-48) from Km 37.000 (Exist Km 37.000) to Km 71.015 (Exist. Km 71.000)in Tamil Nadu on EPC Mode under NHDP Phase V
Construction of Four lane expressway from start of DSIR zone of Ahmedabad district to Adhelai village of Bhavnagar district (ch. 71.00 to ch. 109.019) section of Ahmedabad- Dholera Greenfield alignment (NH-751) on EPC mode under Bharatmalapriyojana
RFP for the Selection of System Integrator for Design Supply Installation Testing Commissioning and Operation and Maintenance of ATMS on Dwarka Expressway (NH248BB) and existing Delhi Gurgaon sec of NH48 as one Combined Loop on EPC mode
Const. of EC for Gammon Junc at Km. 903.265 (Blackspot ID No. AP(05)-092)and Diwancheruvu junc at Km. 902.308(Blackspot ID No.AP(03)-299) on NH16 in Andhra Pradesh under NH(O) on EPC mode
Construction of Auditorium Cum Placement Cell and Open-Air Theatre for GGS Indraprastha University at Dwarka, New Delhi including Civil, Electrical and Mechanical and Horticulture works/services on EPC basis.
Construction of 6Lane ROB at Km. 314.630 over Existing NH24 of Bareilly Sitapur section on EPC basis in the state of Uttar Pradesh for proposed private railway siding of KFL
Major Upgradation of Lucknow Railway Station of Northern and North Eastern Railways on Engineering Procurement And Construction mode
Development of 6lane GF Ring Road(PckgIII) starts from 51.200 to 68.650(Length 17.450kms) around Kanpur City and Construction of 4lane Airport link road(Length 1.45 km) at 62.090 of Kanpur ring road in UP on EPC mode
Consultancy Services for Construction (On EPC Mode) of 700 bedded ......... Geeta Colony, New Delhi (SH Hiring of Inspection Vehicle along with Driver in the office of Assistant Engineer HPSD (East)-IV, PWD, Tahirpur, Delhi-110093 during 2020-21)
Consultancy Services for Implementation of RAP for Rehabilitation and Upgradation of Bowdara-Vizianagaram and Paderu-Araku Section of NH-516E in the State of Andhra Pradesh under GNHCP with the loan assistance of World Bank on EPC mode
Engagement of user fee agency through e-quotation for Bhagat Talai Fee Plaza 13.700Km and Balicha Fee Plaza74.00Km for the use of Upgradation to 2 lane with Paved Shoulder from Charbhuja at to Neechli Oden (Nathdwara) EPC Mode
Engagement of user fee agency through E-Tender at Chhoti Villor Fee Plaza at km 8.400 for Sanchore-Dhnera-Deesa section from Km.0.000 to km.33.600 of NH-168A in the state of Rajasthan on EPC mode
Rehabilitation and Upgradation of Bowdara-Vizianagaram (km 0.000 to km 26.937) and Paderu- Araku (km 2.400 to km 51.772) Section of NH-516E in Andhra Pradesh under (GNHCP) with the loan assistance of World Bank on EPC mode
Development of section of Four Laning of Najibabad Bypass of NH119 from Km. 105.423 to Km. 118.373 (excluding 2.45 Km. of NH-74 bypass), (Total Project Length 10.764 Km.) on EPC Mode in the State of Uttar Pradesh