Loading…
Loading…
810 results • Best match
Construction of 8Lane access-controlled expressway starting after the end of Bridge over Hadaf River near Hathiyavan village with SH-152 near Matariya Vadi in Panchmahal (Ch.729.700-756.052) of Delhi-Vadodara GA on EPC Mode under BMP in Gujarat
Balance work of four laning of Gwalior Shivpuri from existing Ch. 215.000 (design Ch. 100.757) to existing Ch. 221.500 (design Ch.107.350) section of NH3 passing through Madhav National Park (Total length-6.593 km) in MP on EPC Mode basis.
Const of new Slip Service road at various locations L30.28 km LHS RHS and Flyover(2x30m)at Sawadgaon Phata(Km.310.380)on Dhule Pimpalgaon sec of NH60 Km. 261.720 to Km. 380.000 in Maharashtra on EPC mode under NH(O)
Development of six lane access controlled in Uttar Pradesh portion of Delhi Saharanpur Highway from Delhi/UP Border to EPE Junction (Ch.14.750 to Ch. 31.200) in Uttar Pradesh on EPC mode under Economic Corridor in phase1 of Bharatmala Pariyojana
CS for AE for Supervision of Development of 6 lane access control greenfield highway of Delhi-Saharanpur-Dehradun under BP from Design Chainage 56.500 Vill-Karaunda Mahajan to 119.790 Vill-Latifpur at Saharanpur Bypass in UP on EPC Mode Package-II
Authority Engineer Services for Construction of underpasses at 7 blackspot locations in the project highway at specified locations from Ch. 23.600 to Ch. 149.900 of NH34 (Old NH91) from Ghaziabad to Aligarh on EPC Mode in the State of Uttar Pradesh
Supervision Consultant services during OM phase for Four Laning of NH709B from KM 92.200 (near Shamli) to km 155.025 (near Saharanpur) design km 61.409-km 124.181 (length 62.772 km) in the state of Uttar Pradesh (Package-II) on EPC mode
Construction of 8Lane AC expressway starting from MP-Gujarat Border near Chhayan village and ending after Bridge Over Hadaf River near Hathiyavan village (Ch.696.920 to 729.755) section of Delhi-Vadodara GA(NH-148N) on EPC Mode under BMP in Gujarat
Consultancy Services for AE services for 6-lane Flyover and approaches at the start of Muzaffarnagar Bypass (Km113.535) including widening of the existing 4lane-6lane highway from Km112.880-Km115.320 of the Meerut-Haridwar NH-58 on EPC mode in UP
Consultancy Services for AE for Supervision of Construction of 8 Lane ACE starting near Major Bridge on Mej River to Rajasthan MP Border section of Delhi Vadodara Greenfield Alignment NH-148N on EPC Mode under BMP in the State of Rajasthan
Construction of 6-lane Grade Separator at km.36.530 with LVUP at km. 36.894 including Approaches to Grade separator-LVUP from km.35.840-km.37.240 in Barhi-Hazaribagh Section(Hazaribagh Bypass) of the NH-33 in Jharkhand on EPC mode
Construction of 4 lane (expandable to 8 lane) access controlled Highway section of NH248S for the connectivity to proposed Vadhavan port (from Vadhavan Port to Tawa Village on NH 48) (Design length32.180Km) under NH (O) in Maharashtra on EPC Mode
Construction of Four Lane Expressway from Sardar Patel ring road to Sindhrej Village of Ahmedabad District from km 0 to 22.000 of Ahmedabad-Dholera Greenfield Alignment (NH-751) in the State of Gujarat on EPC Mode under Bharatmala Pariyojana (Package
Construction of additional 3 lane with paved shoulder (design length 8.87 km) as realignment of Bakaner ghat (between Indore to Khalaghat Section from existing Km 59.190 to Km 66.120) of NH 52 (Old NH 3) on EPC mode in Madhya Pradesh
Construction 4lane Greenfield Amritsar connectivity of Amritsar with Delhi-Amritsar-Katra Exp. from Jun. with Kapurthala-Sultanpur Lodhi road (NH-703A) Isharwal village ch.24.000 to MDR Jun. at ch.40.900 Dhunda Village on EPC mode under BMP in Punjab
Construction of Balance Works in Tiger Corridor and Provision of Mitigation Measures Structures in Itarsi Betul Section of NH-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in Madhya Pradesh on EPC mode.
Up-gradation to Four Lane with Paved Shoulder configuration of the highway starting from existing km 88.400 (Savali Vihir) to km 163.400 (start of Ahmednagar bypass) (Design Length-75.000 km) section of NH-160 in Maharashtra under BMP on EPC Mode
Consultancy Services of AE for Construction of 6-Lane Patna Ring Road Highway NH-131G from Kanhauli to Sherpur from Km.0.000-Km8.480 including Junction Development with Bihta-Danapur elevated corridor App.length-1.5 Km on EPC Mode in Bihar L-9.98Km
Development of Six lane access-controlled highway from Design Chainage 8.130 near Mohand to 16.380 Daat kali Tunnel of Ganeshpur Dehradun section of NH-72A in the state of Uttar Pradesh and Uttarakhand under BMP on EPC mode (Package-2).
Consultancy Services for AE for Supervision of Construction of 4lane (expandable to 8 lane) expressway for the connectivity to proposed Vadhavan port (from Vadhavan Port to Tawa Village on NH48 (length 32.180Km) under NH-O in Maharashtra on EPC Mode
Construction of a 4 lane Western bypass for Jaunpur city connecting NH 731 at existing Ch. 223.200 Km to NH 135A (Eastern Bypass) at Ch. 107.780 Km. (total length 12.205 km) in the state of Uttar Pradesh on EPC mode
Construction of 6lane flyover (Size40 Nos. of 25m Span x 6m Height) including RE Wall approaches with Flexible Pavement in the Elephant Corridor of Angul Sambalpur sec of NH42(New NH-55)at Km.202.533 on EPC Mode in Odisha
Construction of Foot Over Bridges providing and fixing of median guard rail pedestrian guard rail and widening of existing service road on Delhi Agra sec of NH-2 old (New NH-19) in the State of Haryana on EPC Mode
CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF Construction of Dwarka expressway from shiv Murti Intersection at km 20 of NH 8 till Rail under Bridge near Dwarka Sector 21 from km 0.800 to 5.300 Pkg-I in Delhi on EPC mode.
Development of six lane access control greenfield highway of Delhi-Saharanpur-Dehradun EC under Bharatmala Pariyojana from Junction of EPE Design Ch 0.000 to Design Ch 27.000 (Vill.-Lohadda) in the state of UP on EPC Mode (Package-I) 2ND CALL
BW under Phase-II for 4-laning of Khed Sinner comprising of the stretches of Kalamb bypass (km68.576 to km72.390) Linear length of Bhatkalwadi (km89.550 to km90.400) and Alephata bypass (km 92.030 to km 96.000) in Maharashtra on EPC Mode
Construction of balance work of Widening and strengthening for improvement and up-Gradation of NH-709A Garhmukteshwar chainage- 83.200 of NH24 to Meerut (chainage 9.860 of NH235) including connector to Nh-119 Package XII in Uttar Pradesh on EPC Mode.
Balance Works of Rehabilitation and Upgradation of Nakrekal to Nagarjunasagar section of NH 565 to 2Lane Paved Shoulder from Km 1.000 to Km 86.057 under NH O for the year 2020 21 in the State of Telangana on EPC Mode
Construction of Four Lane Divided Carriageway with Paved Shoulder from Patan (Near Rajpur) at Km 52.000 (design) to Gojariya at Km 128.940 (design), a length of 76.940 km (PKG II) of NH-68 in Gujarat under NH(O) on EPC Mode
Construction of school of Engineering and Atal Bihari Vajpayee school of management & Entrepreneurship ay JNU Campus New Delhi including all Civil & MEP services, Horticulture and development works under EPC mode - III (SH: Providing services of office Assistant staff for IITPED Delhi)
Improvement and Upgradation of Existing 2-Lane Bypass to 6-Laning from Km. 403.100 (Design Ch. 402.600)-Km.433.000 (Design Ch.433.200) of Hubli-Dharwad Bypass section of NH-48 (Old NH-4) in Karnataka to be executed on EPC Mode
Construction of 8 Lane Expressway starting near Junction with NH-12 near village Ummedpura to Major bridge over Takli river near Nayagaon Jageer village (Ch.419.000-427.300) section of Delhi-Vadodara GFA (NH-148N) under BMP in Rajasthan on EPC Mode
Construction of New Toll Plaza (12 lane) including Administrative building and other works at Kunimellihalli Km.347.180 of Chitradurga Davanagere Haveri Hubli section of NH-48 in the state of Karnataka on EPC Mode (for NHIT Eastern Projects Pvt. Ltd)
Construction of Four Lane Expressway from Vejalka Village to start of DSIR Zone of Ahmedabad District from km 48.520 to km 71.060 section of Ahmedabad-Dholera Greenfield Alignment (NH-751) on EPC Mode Under Bharatmala Pariyojana in the State of Gujar
Balance work of Rehabilitation and Upgradation to four laning of Baharagora Singhara sec. of NH-49 from Km.229.727 to Km.238.990 including cons. of Five Elephant Underpasses (EUPs) and Fourteen Animal Underpasses (AUPs) in Odisha state on EPC Mode.
Balance work of 6 lanning of existing 4 lane from Km 22.300 (Thondupally) to Km 34.144 (Kothur) (Design Length 11.844 Km) on Hyderabad Bangalore Section of NH 44 in the State of Telangana under Bharatmala Pariyojana Phase on EPC Mode
Upgradation of Existing Two-Lane Carriageway to Two Lane Carriageway with Paved Shoulder from Ch. 665.686 (Existing Km. 665.686) in Khanpur Village to Ch. 710.462 ( Km. 710.483 in Karvad Village (Length 44.776) Sec. of NH-56 in Gujarat on EPC Mode.
Improvement and Upgradation of Existing Road to 4lane with Paved Shoulder from Km 229.070 to 260.800 End of Hardoi District to Lucknow of NH731 Pkg4 on EPC basis in the state of Uttar Pradesh
CS for AE of Construction of new 4Lane Bridge over River Ganga at Downstream of Farakka Barrage including approaches connecting Farakka Raiganj of NH34 from km 290.940 (design chainage 0 km) to km 296.805 (design chainage 5.468 km) in WB on EPC Mode
Engagement of user fee collection agency on the basis of CB at Vishankheda Fee Plaza at Km 283.600 for rehabilitation upgradation of Jabalpur-Bhopal Section of NH-12 to 4lane with provision of rigid pavement on EPC Mode in the state of MP
Engagement of user fee agency through E-Tender at Saini Majra Fee Plaza at km 28.160 from km 0.000 to km 50.860 on Ambala-Kaithal Section (Pkg.I) of NH-65 under NHDP Phase-III on EPC mode in the state of Haryana
Construction of 6-lane access controlled Greenfield highway from km 125.000 to 150.000 of Deogarh-Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar EC in Rajasthan on EPC mode under BM (Ph-I) (AJ/DRGB-Package-6)
Construction of New 4-lane Bridge Across River Kosi at Phulaut including Rehabilitation and Upgradation of existing Birpur-Bihpur Section of NH-106 from km 106.000 to km. 136.000 to 2-lane with Paved Shoulder in the State of Bihar on EPC mode
Construction of 6 lane H.L./Extra-dosed Cable Bridge on River Ganga parallel to Western side (180 meter upstream) of Digha- Sonepur Rail-cum-Road Bridge at Patna on Ganga River on NH-139W in the state of Bihar on EPC mode
Rehabilitation and Upgradation to 2-lane with paved shoulders configuration of Miranpur Katra to Radhaita Section (Km 114.000 to Km 137.250) of NH-730C in the State of Uttar Pradesh under GNHCP with the loan assistance of World Bank on EPC mode.
Construction Widening of Structures i.e MJB MNB ROBs LVUP etc rectification of drainage and rain cuts and other works on Panipat Jalandhar sec of old NH1(new NH44)from Km96.000 to 387.100 in the State of Haryana and Punjab on EPC Mode.
Const of underpass VUP LVUP SVUP for long term mitigation measure on potential BS loca from Bhonga Kheda to Suktara sec of NH44 at km 593.950 VUP 610.360 VUP 615.920 VUP 621.140 VUP n under Road Safety in MP on EPC Mode
Construction of 2Lane with Paved shoulder of Hinotiya to Mehluwa from Design Km 27.000 (of existing SH 19 Km 26.530) near Hinotiya Village near Mehulwa village Sec of NH 346 Vidisha Talbehat of length 48.700 kms in MP (Package 2) on EPC Mode.
Construction of 6 lane Greenfield corridor from Ramnagar to Kacchi Dargah NH119D (from Km 109.700 to Km 122.300) including widening of the existing NH31 (from Km 196.700 to Km 198.600) as part of the Amas Darbhanga highway in Bihar on EPC Mode
Upgradation of port connectivity NH configuration from existing 2-lane-4-lane road from Achhampeta junction (NH-216) to Kakinada anchorage port connecting Vakalpudi light house (from Ch.0.0 to Ch.13.198) in the state of AP on EPC Mode under BMP