Loading…
Loading…
810 results • Best match
Four laning of existing 2-4 lane stretch from Lonand (Design km 166.400) to Dive Ghat (Design km 220.900) (54.500 km) of Mohol-Alandi section (PKG-V) of NH-965 in the State of Maharashtra to be executed on EPC Mode under BMP
Const. of 2lane with paved shoulders bypass to Mungrabadshapur town start near Kodahu at Km 47.225 of NH319D and ending near Nauwadandi at Km 218.880 of NH31 Ch.Km 0.00 to Km 4.335 L 4.335Km under NH O in Uttar Pradesh on EPC mode
Construction of 4 Lane Flyover from MES College Junction to Bogmalo Junction on NH566 from km 7.106 to km 10.460 and 4 Lane VUP at Queeny Nagar Junction from km 3.330 to km 4.550 on EPC Mode in the State of Goa.
Construction of New Double Tier 4-lane Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from km 0.342 to Km 20.223 on EPC Mode under Bharatmala Pariyojana in the State of Tamil Nadu- Package-III (km 9.700 to Km 14.185)
Constr. of 6lane elevated flyover inclu. reconst rehab of exist pavement from Km 426.230 to Km 430.500 at Nirsa in the Barwa Adda Panagarh sec of NH19 Km.398.240 to Km.521.120 inclu Panagarh Bypass in Jharkhand on EPC Mode under NH(O)
Construction of new 4 lane Prayagraj Southern Greenfield Bypass from design km.43.200 (near Mahuari) to design km.50.860 (near Nababa urf Nibi Kala Uparhar) (design length 7.660 km) PKG-2 under Ph-I on NH19 in UP under Bharatmala on EPC mode.
Development of six lane access control greenfield highway of Delhi-Saharanpur-Dehradun EC under BMP from Design Chainage 0.000 (Aksardham NH-9 (old NH-24)) to Design Chainage 14.750 (Delhi-UP Border) in the state of Delhi (Package-1) on EPC mode
Const of 6L EC at Pigdambar Chauraha Km14.235 and Medicaps Km13.430 LVUP at Sirsodiya Junc at Km61.660 Flyovers at Dhanmod Bypass Km65.455 and Dhanmod Bypass End Km73.495 under road safety improvement on Indore Khalghat Sec of NH52 in MP on EPC mode
Consultancy services for AE for Construction of Descoped Portion of Binnaguri Bypass in Binnaguri Mouza of NH-27 (Old NH-31D) from Chainage 17.500 to 23.000 of old NH-31D in the District of Jalpaiguri West Bengal on EPC Mode under NH(O)
Construction of New Double Tier 4-lane Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from km 0.342 to Km 20.223 on EPC Mode under Bharatmala Pariyojana in the State of Tamil Nadu-Package-IV (km 14.185 to Km 20.223)
CS for AE for Const. of EC for Gammon Junc. at Km.903.265 BS ID No.AP-05-092 and Diwancheruvu junc. at Km. 902.308 BS ID No. AP 03 299 on NH-16 in Andhra Pradesh under NH(O) on EPC mode
Construction of service road on both side of 4-lane Varanasi bypass from Km 0.00 (starting point at Km 271.300 of NH-56) to Km 15.250 (end point at Km 11.170 of NH-29) in the state of Uttar Pradesh on EPC mode
Providing and laying of 33 KV HT Electrical line for Power Supply from 33 KV Mannur Industrial Feeder fed from 110/33 KV Sriperumbuthur Sub Station to MMLP Chennai at Mappedu, Tiruvallur District in the State of Tamil Nadu on EPC Mode
AE for Supervision of Development and Upgradation of 4lane AC Expressway from Km 530.000 to Km 545.300 (Sidhra to Ban Vill Sec of NH44) of Delhi Amritsar Katra Expressway on EPC Mode under BMP in the UT of JnK (Ph2-Package XVIII)
Construction of 1 Nos ROB 2 Nos VUPs Service roads provision of lighting and construction of other miscellaneous works at various stretches on section of NH-4 from AP/Tamil Nadu Border (Km. 134.890) to Nalagampalli village (Km.172.000) under EPC mode
Consultancy Services for AE for SC of 8-lane access controlled Greenfield Delhi-Vadodara Expressway at Junction with MDR-1 (Baonli-Jhalai road) to Major Bridge on Mej River (Ch.247.310-Ch.331.030) in the State of Rajasthan on EPC mode under BMP
RFP for Construction of 4 lane divided carriageway with paved shoulders from km 0.000 (Km. 144.200 of NH-15(NewNH-68) to km 21.042 (Km. 160.700 of NH-15(New NH-68) Barmer Bypass on EPC mode on in the State of Rajasthan.
Construction of New Double Tier 4-lane Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from km 0.342 to Km 20.223 on EPC mode under Bharatmala Pariyojana in the State of Tamil Nadu-Package-I (km 0.342 to Km 4.604)
Construction of New Double Tier 4-lane Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from km 0.342 to Km 20.223 on EPC Mode under Bharatmala Pariyojana in the State of Tamil Nadu-Package-II (km 4.604 to Km 9.700)
4-laning of Balwara to Dhangaon section of NH-347BG-753L (Indore to Boregaon-Pkg III) Design Ch.42.260-Existing Ch.45.000 to Design Ch.82.810-Existing Ch.86.00 (Length 40.35 Km) under Bharatmala Pariyojana Phase-I in Madhya Pradesh on EPC mode
Upgradation of Highway starting from junction with NH-44 at Panipat connecting Kairana Shamli Muzaffarnagar Miranpur Bijnor and terminating at its junction with NH-74 at Kotawali to 2-4 lane configuration in State of UP on EPC Mode Pkg-III NH-709AD
Four laning of Honnavar Port Connectivity rd Kasarkod side of Honnavar Port towards NH 66 connecting Honnavar Port with NH 66 at Km 196.00 and to improve NH 66 to integrate port connectivity road on EPC mode under BMP Ph 1 in Karnataka
Improvement and widening to two Laning with Paved Shoulder of NH 127B from Km 31.500 to Km 63.224 (Goeragre) in the State of Meghalaya on EPC basis through JICA ODA Loan Phase-VII(Package-2)
4-laning of Bangalore-Mangalore Section from km 270.270 (Periya Shanthi) to km 318.755 (Bantwal) including 6-lane Flyover at Kalladka Town in km. 311-km. 314 on NH-75 on EPC Basis in Karnataka
DESIGN, CONSTRUCTION and COMMISSIONING OF MULTI STOREY RESIDENTIAL COMPLEX CONSISTING OF 72 TYPE-II and 72 TYPE-III QUARTERS ALONG WITH ALL ARCHITECTURAL, STRUCTURAL, CIVIL, MEPF and OTHER ALLIED WORKS AT RAMNAGAR RAILWAY COLONY TOWARDS PAHARGANJ ... ON ENGINEERING , ... ENGINEERING, PROCUREMENT AND CONSTRUCTION EPC
Improvement and Upgradation of NH734 sec of Moradabad Thakurdwara Kashipur including Moradabad and Kashipur bypasses on EPC basis in Uttar Pradesh and Uttarakhand PckgIII Kashipur BypassLength14.490 km. Starts from Ch.38.770 near UP UK Border a
Engagement of user fee collection agency on the basis of EQ through etender for Marri FP at Km 24.555 of NH 543 for use of Balaghat Gondia sec of NH543 from km 0.000 to km 41.200 under Bharatmala Pariyojana in Madhya Pradesh on EPC Mode
Development of six lane accessed controlled in UP portion of Delhi Saharanpur Highway from Akshardham Junction to Delhi/UP in the state of UP on EPC mode under Economic Corridor in ph-U of Bharatmala Pariyojan-Reg Shifting of water utility near ROB-I
Construction of 4-6 approach road from km.217.900-km.219.910 including 6-lane ROB cum viaduct at Km 218.944 in Mahoba greenfield bypass in Sagar-Kabrai Package-V from UP-MP Border to Kabrai (km.197.000-Km.242.991) in Uttar Pradesh on EPC mode
Construction of 4-lane Gauripur Bypass starting from Km. 852.560 of NH-31 and Terminating at Km. 862.170 via khudimari Pt-II, Fulkumari, Charaldanga, Sajuakuti, Geramari PtIII and meeting at Km 862.170 of NH-17(New)/NH-31(Old) in Assam under EPC Mode
Improvement Augmentation of Two lane with Paved Shoulders from Km 1.600 to Km 16.690 and Km.29.850 to Km.80.133 of Nagapattinam Thanjavur Section of NH 67 Old New NH-83 Total Design Length 65.373 Km in the State of Tamil Nadu on EPC Mode
CS for AE for Supervision of Development of 6 lane access control GF highway of Delhi-Saharanpur-Dehradun under BP from Junction of EPE Vill-Mavikalan Design Chainage 0 to 56.500 Vill-Karaunda Mahajan in UP on EPC Mode under BP Phase-I PKG-I
Elevated Kagal Satara Const. of 6L EC from KM 612.582 to KM 617.540 incl. const. of flyover towards Kolhapur City on NH48 in FAZ of Kolhapur Descoped work of Kagal Satara PKG1 Second level Ramp KM 0.000 to KM1.263 in MH on EPC mode.
Construction of Eight Lane expressway from SH-175 near Baletiya village of Panchmahal to SH-63 near Pratap Nagar village of Vadodara (Ch. 803.420 to 824.920 design Ch. 351.000 to Ch.372.500)Delhi-Vadodara GA (NH-148N) on EPC Mode under BMP in Gujarat
CS for AE for Road Safety Improvement of existing Four Lane Section of Dehradun Lal Tappar Nepali Farm Section of NH-7 (501.930 to 531.330) and Nepali Farm Motichur Section of NH-34 (531.330 to 538.750) on EPC Mode in Uttarakhand under NH (O).
Construction of 6-lane access controlled GH from km35.000 to km67.000 of Rajasthan-Gujarat Border to Santalpur section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Gujarat on EPC mode under BMP(Phase-I)AJ-RGBS-Package-2
Development and Upgradation of Four lane Access Control Expressway from Design Chainage Km 530.000 to Km 545.300 (Sidhra to Ban Village Section of NH-44) of Delhi Amritsar Katra Expressway on EPC Mode under BMP in the UT of JK (Phase II-PKG-XVIII)
Construction of Balance work of 2 Laning with Paved Shoulder from Km 30.800 to Km 70.800 and 2 Laning without Paved Shoulder with Rigid Carriageway from Km 70.800 to Karnataka-Goa Border km 84.120 of NH-4A in the State of Karnataka on EPC mode
Construction of 6-lane access controlled GH from km4.888 to km35.000 of Rajasthan-Gujarat Border to Santalpur section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Gujarat on EPC mode under BMP (Phase-I)AJ-RGBS-Package-1
Construction of Elephant Underpass (from km. 153.853 to km 153.953) Flyover (from km 137.966 to km 138.034) 2 no. Box Culverts (km 153.679 and km 137.761) and other road safety works in Kharagpur Chichra section of NH-06 in West Bengal on EPC Mode
Construction of 2 nos of Flyover on Omarpur Junction of NH34 from Design Ch. 245.50 to Design Ch. 247.500 (Length2.0 km) and on Dhulian Junction of NH 34 from Design Ch. 274.300 to Design Ch. 276.500 (Length2.2 km) in West Bengal on EPC Mode
Const. of underpass VUP LVUP SVUP for long term mitigation measure on potential BS loc. from Sadak Seoni to Rahivada sec of NH-44 at km 574.930 1 VUP 2SVUP 585.675 LVUP 586.390 LVUP n 589.120 VUP under Road Safety in MP on EPC Mode.
Construction of 2 no. of Grade separated interchanges at Km 113.730 (Ranchi-Hazaribagh Road) and Km 139.225 (Ranchi-Jamshedpur Road) on 4 laning stretch of Ranchi Bypass of NH-33 in Jharkhand on EPC Mode under NH(O).(Total Length 6.06 km)-2nd call
Cons of Flyover for LongTerm Rectification of 4 MoRTH Identified Blackspots at Jolhupur jn Km. 1534.215 Chaura Bakra Mandi Km 1544.300 Patel Chowk jn Km 1556.285 and Premium Factory Kota jn Km 1576.140 on Orai Barah Sec of NH27 in UP on EPC Mode
Consultancy Services for AE for Supervision of 8 Lane ACE starting from Junction with NH-47 near Bhamaiya village with NE-1 near Dodka village of Vadodara Dist of Delhi-Vadodara Greenfield NH-148N on EPC Mode under BMP in the State of Gujarat
Construction of new link of Sahibganj Bypass in Jharkhand to Km 15.885 Junction of NH-133B and 131A on Manihari Bypass Km 0.000 Junction of NH-133B and 131A near Narenpur of NH-131A in including Ganga Bridge to 4 lane standard on EPC mode.
Consultancy Services for AE for Construction of new 6-Lane Access Control Prayagraj Southern GF Bypass from design Km 34.400 (near Dandupur) to design Km. 43.200 (near Mahuwari) Total length 8.800 Km PKG-1 under Phase-I in UP under NH(O) on EPC mode
Providing the laying of Optical Fiber Cable from km 697.220 (MP-Gujarat) to km 844.800 of Delhi-Vadodara expr. and km 26.600-378.722 of Mumbai-Vadodara Expressway and from km 0.000-79.900 of spur to JNPT on EPC mode in Gujarat and Maharashtra (PKG-II
1.Construction of 2 flyovers of 4lanes at Chhatauni Chowk and Awadesh Chowk 2. Reconst of 3no. of gantry girder gates.3 Const. of Service Road and Drain near Piprakothi on NH27 (Under TOT) in the district of East Champaran in Bihar on EPC Mode
Construction of 6-lane access controlled GH from km99.000-km130.073 of Rajasthan-Gujarat Border to Santalpur section of NH-754K as a part of Amritsar-Jamnagar Economic Corridor in the State of Gujarat on EPC mode under BMP(Phase-I)AJ/RGBS-Package-4