Loading…
Loading…
810 results • Best match
Construction of 6lane elevated flyover inclu reconst. rehab of exist pavement Km 406.100 to Km 411.150 at Gobindpur area in the Barwa Adda Panagarh sec of NH19 from Km.398.240 to Km.521.120 inclu Panagarh Bypass in the State of Jharkhand on EPC Mode
Const. of underpass VUP LVUP SVUP for long term mitigation measure on potential BS loca. from Ganeshganj to Chhapara Kalan sec of NH44 at km 554.100 VUP 554.400 LVUP 562.970 VUP 567.395 VUP 572.675 VUP under Road Safety in State of MP on EPC Mode.
Construction of New Building for Integrated Facilities of Office Training Complex for ISTM and Office Accommodation for DoPT at Old JNU Complex, New Delhi under EPC Mode-I (SH - Providing Various Services for the Office of CEcumED, IITDPZ and EEandSM, IITPD-1, CPWD, New Delhi).
Planning, Design and Construction of 3 Nos Police Stations 6 Nos Police Posts and Womens Hostel for Delhi Police including all Civil, E and M, Plumbing, Horticulture and Development work on EPC mode-I basis (Design and built). (SH- Providing Third Party Quality Assurance Services)
Construction of 6-lane access controlled Greenfield highway from km 72.000 to km 97.000 of Deogarh-Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar EC in Rajasthan on EPC mode under Bharatmala Pariyojana (Ph-I)(AJ/DRGB-Pkg-4
Construction of 4-lane Gauripur Bypass starting from Km. 852.560 of NH-31 and Terminating at Km. 862.170 via khudimari Pt-II, Fulkumari, Charaldanga, Sajuakuti, Geramari PtIII and meeting at Km 862.170 of NH-17(New)/NH-31(Old) in Assam under EPC Mode
Construction of school of Engineering and atal bihari vajpayee school of management & entrepreneurship at JNU campus New Delhi including all civil & MEP services horticulture and development works under EPC mode-III (SH: Providing miscellaneous electrical items for the office of CE&ED, IITDPZ) Subwork/Packages: Providing misc. electrical items
Construction of 6 lane flyovers at Boragaon Gorchuk Lokhra and Basistha Junction along with 6 laning of approaches from section Ch. Km 146.172 to Km 162.620 on Guwahati Bypass NH37 in Assam under BMP on EPC Basis
Consultancy Services for AE for Supervision of Construction of 4 lane Connector from Delhi-Meerut Expressway (Km. 50.000 of Package-IV) to Km. 8.520 of NH-235 in UP on EPC Basis (Length 14.600 Km) under BMP
Providing Third Party Quality Control Assurance Services for Integrated Development of East Delhi Hub at Karkardooma, New Delhi on TOD Norms on EPC mode
Purchase of 3.0 Tesla MR scanner under buy-back of existing Achieva 3.0 T TX MR scanner on Turn-key basis
Planning, Design and Construction of 150 bedded critical care Hospital Block (B plus G plus 6) Building at AIIMS Trauma Centre for AIIMS, New Delhi including all Civil and MEP Services, Hospital Services, Horticulture and Development works on EPC Mode-I...
4-laning of Indore to Raghav Garh section of NH-59 (Indore-Harda package-1 stretch) from MR-10 Junction on NH-3 Bypass Ch.0.250 to Raghav Garh Ch. 26.903 (Design 26.653 Km) under Bharatmala Pariyojana Phase-I (EC) in Madhya Pradeshv on EPC Mode
Engagement of user fee collection agency on the basis of CB through e-tender at Vaddupalli FP at Km. 14.500 of NH-544DD from Km 0.000 to 56.000 of Anantapur-Kalyandurg section of two lane with paved shoulders on EPC mode under NH(O) in Andhra Pradesh
CS for AE for Supervision of Const of New Slip Service road on either side at various locations L25.140 Km Flyover at Borivali Junc Km.528.550 at Sherekarpada Km.528.800 on Pimpri Sado Vadape sec of NH848 Km.460.900 to Km.537.000 in MH on EPC mode
Conversion of Partially Excavated Esc to main tunnel(Length 1.80 Km) frm Km 12.732 to Km 14.568 of NH 21 including construction of cross passages and approach roads on either side of the tunnel on Kiratpur to Nerchowk sec of NH 21 in HP on EPC Mode
CS for AE for SC of GF Road connecting North-south industrial cluster near Krishnapatnam port at Thamminapatnam-Narikellapalle Part-I Ch 0.000-14.650 and port Road on NH-67 Part-II Ch 18.000-19.300 in AP on EPC Mode under BMP P-I (2nd Call)
CS for AE for Supervision of Const. of 4 n 6 lane GF connectivity from Talwara Jattan Vill on NH44 to Gobindsar Vill on Delhi Amritsar Katra Expressway km 0.000 to km 12.345 (Pathankot Link Road) in Punjab on EPC Mode under NH(O)2nd call
Construction of 6 lane NH-344N Pkg 5 from Km 0.000 to 7.269 7.3km starting from NH 344 M Delhi at Km 26.135 of NH-344M or UER-II till Bahadurgarh bypass of NH-10 near Bahadurgarh in Haryana as spur of NH-344M on EPC mode
4 Laning of Amritsar Bypass GA from New Tarn Taran Road-Ajnala Road from km 0.750-km.43.750 and Upgradation of existing Amritsar-Khemkaran Road to 4-Lane Config from Design km.71.496-km.78.440 Total 49.944 kms PKG-3 in Punjab under BMP on EPC mode
Construction of 6-lane Minor Bridge (Paloli Palam) at Km 203.160 Major Bridge (Moorad) at Km 204.895 allied works like 6 lane MCW with SR for the section Km.203.000 to Km.205.100 (length of 2.1 Km) of NH-17 under BMP in Kerala on EPC mode
CS for AE for Cons. of Realignment of NH-87 (New NH109) Sec. of Rudrapur Kathgodam from Design Ch. 0.000 (54.050 of NH 87) to Design Ch. 7.875 (61.550 Of NH 87) Due to Proposed Expansion of Pantnagar Airport (DL 7.875 Km) in Uttarakhand on EPC Mode
CS for AE for Development of 6L GF (PKG-IIA) starts from Design Ch.23.325 to Design ch. 32.090 around Kanpur city (8.765 kms) and Development of 6L GF (PKG-IIB) starts from Design Start from 32.090 to Ch. 51.200 (19.110 kms) in UP on EPC mode.
CS for AE for Supervision of Construction and upgradation of existing 2 Lane to 4 Lane dual carriageway NH standard from Pandaach to Manigam section of NH1 as part of Srinagar Ring Road PhaseIIA on EPC Mode under NH(O) in the UT of Jammu and Kashmir
4 Laning of Pangare to Waranga Phata sec from Km 134.500 to Km 174.645 of NH-161 including additional lengths of 800 m from Waranga Junction to Nanded and 700 m road from Waranga Junction NH-161 to Mahagaon in the State of Maharashtra on EPC mode
Construction of 4 lane NH-344P Pkg 4 from Km 0.000 to 29.600 29.6 km starting from Bawana Industrial Area Delhi at Km 7.750 of NH-344M till Sonipat bypass of NH-352A at Village Barwasani Sonipat in Haryana as spur of NH-344M on EPC mode
Construction and upgradation of existing 2 lane to 4 lane dual carriageway NH Standard from Pandach to Manigam of NH-1 (from existing chainage Km17.974 to Km29.792) as a part of Srinagar Ring Road Phase-IIA on EPC Mode under BMP in the UT of JandK
Construction of i White Topping on the existing bituminous carriageway and SR ii VUP with SR at Delhi Darbar iii VUP with SR at Panduranwadi iv LVUP with SR at Sativali and v Safety measures on Surat Dahisar Section of NH 48 on EPC mode 2nd call
Construction of New Building for Integrated Facilities of Office Training Complex for ISTM and Office Accommodation for DoPT at Old JNU Complex, New Delhi under EPC Mode-I (SH: Providing Various Services for the Office of Executive Engineer & Senior Manager, IIT Project Division-I, CPWD, New Delhi).
Construction of New Building for Integrated Facilities of Office Training Complex for ISTM and Office Accommodation for DoPT at Old JNU Complex, New Delhi under EPC Mode-I (SH: Providing Various Services for the Office of Executive Engineer & Senior Manager, IIT Project Division-I, CPWD, New Delhi).
Construction of Balance New Service Road MNB Culverts Drain VUP-LVUP-SVUP and its work Km 656.000-Km725.185 of Rewa Katni Jabalpur section (P-1) and from Km 725.185-Km774.068 and Km793.065-Km813.257 (P-2) of NH-30 in the State of MP on EPC Mode
2 /4 laning of Raebareli Jagdishpur Section of NH-330A from Km.0.000 to Km. 47.800 Design Length 46.020 km including Jagdishpur Bypass and Excluding 4.1 Km overlapping Length of Jagdishpur Bypass with NH 731(Old NH-56) in UP on EPC mode under NH(O)
RFP for Construction of 6 lane Elevated Corridor along with development of existing 4 lane road at ground level from Aroor to Thuravoor Thekku section of NH-66 from Km. 366.330 to Km. 379.082 of NH-66 under BMP in the State of Kerala on EPC mode
Construction of Six Lane Standalone Flyovers at Bongaigaon Chapaguri Pathsala Simalguri Chowk and Baihata Bypass Junctions on stretches of NH 31 and NH 31C (New NH 27) in the state of Assam under Bharatmala Pariyojna on EPC basis
Rehabilitation and upgradation for 4Lanning of Saha to Sahabad Section from Km. 14.840 to Km 31.760 of NH444A including Saha Southern Bypass connecting NH73 to NH444A (Total Length-21.05 km) under Bharatmala Pariyojna in Haryana on EPC Basis
Construction of 6 Lane LVUP for rectification of Black Spot (MORTH ID HR-(02)-022) at km. 422.114 of NH-352 (old NH-71) (Palhawas Chowk) on Rohtak-Bawal section on EPC basis in the State of Haryana
Construction of Six Lane Standalone Flyovers at Raha Demow Borghat Kathiatali junctions and ROB at Jagiroad on stretches of NH 36 and NH 37 (New NH 27) in the state of Assam under Bharatmala Pariyojna on EPC basis
Engagement of user fee agency through e-quotation for Mahanandpur near village Chak Kanhu Fee Plaza for the project Improvement and Up-gradation of Existing Road to 2-4 lane on EPC basis in the state of Uttar Pradesh
Authority Engineer for Construction Supervision including Implementation of RAP for NH 127B from Km. 0.000 (End point of Dhubri-Phulbari bridge) to Km 63.224 (Goeragre) in the State of Meghalaya on EPC basis through JICA ODA Loan Phase-VII
Construction of BOPs Border Out Post at Lakhpatwari, Dafa G 33 G 39 and Vishnubet including Jetties approach Roads Culverts OP towers Dredging and erosion control measures including all civil electrical and mechanical works services on EPC basis Subwork/Packages: Three
CS for AE for Const. of 6lane elevated flyover inclu. reconst rehab of exist pavement Km 406.100 to Km411.150 L5.05 Km at Gobindpur and Km 426.230 to Km 430.500 L4.27 Km at Nirsa in the Barwa Adda Panagarh sec NH19 in WB on EPC Mode under NH O
Const. of LVUP at Ch.286.680 with Sr.Road on NH18 at Phuldungri and VUP at Ch.332.518 in front of Baharagora Bus Stand on NH18 and Flyover at Ch.218.957 with Sr.Road at merging point of NH-43 and NH-32 (New NH-18) in Jharkhand on EPC Mode
Construction of 6 Lane Grade Separated structures along with SR ITC Junction in Kurnool Town Kambalapadu Junction Dhone Dhone Exit Dhone and SR from Km 204.800 to Km 205.800 Both Sides RHS Both Sides on NH 44 old NH 07 in the State of AP on EPC mode
CS for AE for Supervision of Development of 6-lane access controlled in Delhi and UP portion of Delhi-Saharanpur Highway from Akshardham NH-9 Junction to EPE Junction (Ch.0.000 to Ch.31.600) in Delhi and UP on EPC mode under EC in phase-1 of BMP
AE Ser for Const. of Flyover for LT Recti. of 4 MoRTH Identified BS at Jolhupur junc at Km.1534.215 Chaura Bakra Mandi at Km1544.300 Patel Chowk junc at Km1556.285 n Premium Factory Kota junc at Km1576.140 on Orai Barah Sec of NH27 in UP on EPC Mode
CS of 2L VUP at Mukundpur junc 4L VUP at Lahra Mod junc 4L VUP at Eglas Chauraha junc 4L VUP at Kota Kapura junc 4lane VUP at Poiya junc and 4L of Malupur Tiraha as part of Rectification of MORTH identified BS in UP on EPC Mode
Creation of New Infrastructure at Roshanpura (Najafgarh) Campus, University of Delhi. SH: Planning, Design and Construction of Academic Block B (Basement GF 8 Floors) at Roshanpura (Najafgarh) Campus, University of Delhi including all civil, E&M, ... on EPC Mode -1 ...
Four laning of Dhrol Greenfield section from Km 0.000 (Ex Ch.53.151 of SH-25) to Km 3.286 and Widening to four lane from Km3.286-Km6.000 and Widening of Amran section to 4 lane from Km 42.180-Km48.580 of NH-151A under NH(O) in Gujarat on EPC mode
Improvement and widening to two Laning with Paved Shoulder of NH 127B from Km. 0.000 (End point of Dhubri-Phulbari bridge) to Km 31.500 in the State of Meghalaya on EPC basis through JICA ODA Loan Phase-VII (pkg-1)
Lehrabega fee plaza at existing km 191.929 (design chainage km 199.097) form existing km 168.000 to km 209.405 on Tapa to Bathinda section of NH-64 (new NH-07) under NHDP-IV on EPC basis in the State of Punjab