Loading…
Loading…
810 results • Best match
4-Laning of existing 2-laning stretch from Dharmapuri at km.117.000 to Lonand at km.166.400 (Pkg-IV) on Mohol-Alandi section (Design length 49.400 km) of NH-965 in the state of Maharashtra on EPC Mode
Balance work of Four Laning of the project Highway from End of Pinjore bypass-Baddi-Nalagarh Section (Km. 4.200 to 34.500) on NH-21A (New NH-105) in the State of Haryana and Himachal Pradesh on EPC Mode
Development of Memmadpur (Ambala) - Banur (IT City Chowk) - Kharar (Chandigarh) Corridor under Bharatmala Pariyojana - Package-II - 6 laning of IT City Chowk to Kurali Chandigarh Road (Design length 31.23 Km) in the state of Punjab on EPC mode
Development of six- lane access-controlled highway from design chainage 0.000 (Ganespur) to design chainage 8.130 (near Mohand) of Ganeshpur Dehradun section of NH-72A in the state of Uttar Pradesh under Bharatmala pariyojana (Package1) on EPC mode
Up-gradation to 4-Lane with Paved Shoulder configuration of the highway starting from km 88.400 (Savali Vihir) to km 163.400 (Ahmednagar bypass) (Design Length-75.000 km) section of NH-160 in Maharashtra under BMP on EPC Mode
Develop to 4Laning of the descoped stretches from Km.115.342 to Km. 191.700 of NH34 in Nadia(3.962 Km.)Murshidabad (5.538) pertaining to Krishnagar Behrampore sec of NH34(New NH-12) Sec in West Bengal on EPC mode.
CS for AE for Const. of 4L Nagpur-Katol sec of NH353J include. Mitigation Structures from Design Ch.37.000 to Ch.45.990 TC-I and from Design Ch. 50.400 to Ch63.100 TC-II in Maharashtra on EPC Mode
Construction of four/six lane Greenfield connectivity from Talwara Jattan Village on NH44 to Gobindsar village on Delhi Amritsar - Katra Expressway from km 0.000 to km 12.345 (Pathankot Link Road) in Punjab on EPC Mode under NH(O)
Four laning with paved shoulder of Madhavpur to Porbandar section of NH-8E (Ext.) old/NH-51(new) from km 338.400 (Design Chainage km 338.400) to km 379.100 (Design Chainage km 379.100) in Gujarat through on EPC mode
Upgradation of Highway starting from junction with NH-44 at Panipat connecting Kairana-Shamli-Muzaffarnagar Miranpur Bijnor at Kotawali to two-four lane in the State of UP on EPC Mode Pkg-IV (Bijnor to Kotawali NH-709AD)
Construction of 6 Lane Bridge across Palguni River at km 368.849 of length 182.50m and improvement works from Design Ch. km 368.356 to Design Ch. km 369.132 on NH 66 on EPC mode in the state of Karnataka
Design and Construction using Thin White Topping (TWT) including routine maintenance and balance works of Khed-Sinnar section from km.42.000 to km.177.000 on NH-60 in the state of Maharashtra as Standalone project on EPC Mode.
Balance works of 4-laning of Fagne to Mah Guj Border section of NH-6 in the State of Maharashtra from km 510.000 to km 650.794 design length 140.794 km to be executed on EPC Mode under BMP
Development of 6 lane access control greenfield highway of Delhi-Saharanpur Dehradun economic corridor under BMP from Design Chainage 82.000 Vill-Khyawari to Design Chainage 119.068 (Vill-Latifpur at Saharanpur Bypass) in UP on EPC Mode (Package-IV)
Up-gradation to Four Lane configuration with Palkhi Marg of the highway starting from Junction with NH-65 near Patas -Vasunde Phata-Baramati (NH965G) and Partly Baramati Bypass in the State of Maharashtra under BMP on EPC mode
Balance Work of Rehabilitation and upgradation to 4 laning of NH31D from Km 113.200 to Km 154.854 (Pkg IIA) Falakata Salsalabari Section in the State of West Bengal on EPC Basis
Construction of New 4-lane Bridge (Parallel to the Existing MG Setu) with its approaches from km 0/000 to km 14/500 across river Ganga on NH-19 at Patna in the State of Bihar on EPC mode
Consultancy Services for AE for Supervision of Construction of 4-Lane Connectivity to Banbasa ICP at India Nepal border from NH 09 (Old NH-125) (Sitarganj-Tanakpur) at Km 40 near Jagbuda Bridge under Bharatmala Pariyojana on EPC Mode
Consultancy Services for Authority Engineer for the work of Rehabilitation and Upgradation of Ras - Beawar - Mandal Section (km 0.000 to km 116.750) of NH-158 in Rajasthan under GNHCP with the loan assistance of World Bank on EPC mode
Engagement of user fee agency through e-quotation for Bhagat Talai Fee Plaza 13.700Km and Balicha Fee Plaza 4.00Km for the use of Upgradation to 2 lane with Paved Shoulder from Charbhuja at of NH-162E on EPC Mode
Construction of Eight Lane expressway starting from Junction with NH-47 near Bhamaiya village and ending at Junction with SH-175 in Baletiya village of Delhi-Vadodara Greenfield Alignment on EPC MODE under BMP in the State of Gujarat
Balance work of 4 laning of Indore Gujarat MP Border from km 106.210 to km 115.250 Machilya Ghat Section and Forest portion km 149.80 to km 150.85 of NH-47 on EPC Mode in the State of Madhya Pradesh.
Consultancy services for Authority Engineer for Construction of Bypass for Jamb Junction at Ch. 61.100 to 64.662 and VUPs at design Ch.61.878 and 63.845 on NH-44 for Jamb Junction in the State of Maharashtra on EPC mode
Construction of 6 Lane Elevated corridor from KM 698.600 to KM 699.900 section of NH48 including construction of slip roads service roads in Umbraj City. (Descoped work of Kagal Satara Package2) in the state of Maharashtra on EPC Mode.
CS for AE for Supervision of Construction of 4lane Greenfield Delhi AmritsarKatra Expway from Junction with Ludhiana Malerkotla Rd SH11 near Bhogiwal to Junction with Jalandhar Moga Rd NH703 near Kang Sahibu on EPC mode under BMP in Punjab
Construction of 2 lane with Paved Shoulder/4 laning of Harda-Betul section of NH-47 from Temagaon Ch. km 30.000 to Chicholi Ch. km 81.000 (length-51.000 km)(Harda - Betul Pkg-II) in Madhya Pradesh on EPC mode
Balance work of 4 Laning from Ramban Km 151.00 to Banihal Km 187.00 excluding realignment portions of NH1A Now NH44 with value addition at critical location on EPC mode in UT of Jammu and Kashmir under NHDP Phase 2
Consultancy Services for Authority Engineer for Construction of Six laning of Aurangabad to Bihar-Jharkhand Border (Chordaha) Section of NH-2 from km. 180.000 to km. 209.827 (PKG-I) in the State of Bihar under Bharatmala on EPC Mode
Construction of Four-lane Western side spur of Rampur-Rudrapur section connecting NH-24 (NEW NH-09) to NH-87 bypassing Rampur town (Design Km 00.000 to Design Km 13.700) on EPC Mode in the state of Uttar Pradesh
Long Term Rectification of MoRTH identified Blackspots 17 and Removal of 2 At-Grade Junctions and allied works on existing 4-6-Lane Hyderabad-Vijayawada section of NH-65 from Km.40.000-Km.221.500 in Telangana on EPC mode
Rehabilitation and augmentation of New NH-354 of section Amritsar (airport junction) to Ramdas from km ASR 100.835 to km 139.965 for Length of 39.130 km into Four-Lane under Bharatmala scheme in Punjab (Package-IV) under EPC Mode
Construction of Eight Lane access controlled Expressway starting near Junction with SH-37A to Junction with NH-76 (Ch.359.170-388.420) section of Delhi-Vadodara Green field Alignment on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan
Construction of Four Lane Greenfield National Highway starting from NH-30 near Saristabad (Patna) to Nathupur (Project Start point of Patna- Gaya- Dobhi Section of NH-83) to connect NH 83 and NH 30 in Bihar on EPC mode
Balance Works of Rehabilitation and Upgradation to 4-lane configuration of Ras-Beawar Section (Km 0.000 to Km 30.050) of NH-158 in the State of Rajasthan under GNHCP with the loan assistance of World Bank on EPC mode.
Construction of School of Engineering and Atal Bihari Vajypayee school of Management and entreprenerurship at JNU Campus New Delhi including all civil and MEP services, Horticulture and development works under EPC mode-III (SH:- Providing of office assistant staff)
Construction of school of Engineering and Atal Bihari Vajpayee School of Management and Entrepreneurship at JNU Campus New Delhi Including all Civil and MEP Services Horticulture and Development works under EPC Mode III. SH Providing of office assistant staff
Construction of 4Lane road section of NH-30 from km 82.650-83.880 km84.635-98.750 km103.660-km107.260 km111.390-115.425 km124.345-130.445 km133.155-161.450 of Link road from km 161-450-641.350 of Raebareli-Prayagraj section in UP on EPC mode
Light House Project for Major Upgradation of Chandigarh Railway Station on Modular concept on Engineering Procurement And Construction Mode
Setting up Ingesta/Paunch waste /Dung Drying Processing plant on Turn Key Basis at Ghazipur Slaughter House
Engagement of user fee agency through E-Tender at Dularpur Fee Plaza for two lane with paved shoulder road under EPC mode on Bahraich-Shrawasti Section (km 248.400 to km 310.000) on NH-730 in the state of Uttar Pradesh
Road Safety Improvement of existing four lane section of Dehradun-Lal Tappar-Nepali Farm Section of NH7 (Design Chainage 501.930 to 531.330) and Nepali Farm Motichur Section of NH34 (DC 531.330 to 538.750) on EPC Mode in Uttarakhand under NH(O)
Const of Realignment of NH87 New NH109 Sec of Rudrapur Kathgodam Ch.0.000 (Exist Km 54.050 of NH 87 to Ch.7.875 Exis Km61.550 Of NH 87 due to proposed Expansion of Pantnagar Airport L7.875 Km in Uttarakhand in EPC Mode
Upgradation of Existing Two-Lane Carriageway to Two Lane Carriageway with Paved Shoulder from Ch. 665.686 (Existing Km. 665.686) in Khanpur Village to Ch. 710.462 ( Km. 710.483 in Karvad Village (Length 44.776) Sec. of NH-56 in Gujarat on EPC Mode.
Rehabilitation and Upgradation to 2-lane with paved shoulders configuration of Allahganj-Miranpur Katra Section (Km 52.770 to Km 114.000) of NH-730C in the State of Uttar Pradesh under GNHCP with the loan assistance of World Bank on EPC mode.
Construction of VUP Flyover at Medical Tiraha to Konchhabhawar Jhansi (Km. 105.700 to Km. 106.800) on NH25 (New NH27) and Interchange at Km. 97.100 on NH25 (new NH27) for Shivpuri Kanpur Road (Jhansi Bypass) section in Uttar Pradesh on EPC mode
Balance Works for 6 laning of existing 4 lane stretch of NH 44 from Gundlapochampally (Design chainage km 471.300) to Bowenpally (Design chainage km 481.331) total length 10.031 km in the State of Telangana on EPC mode under Bharatmala Pariyojana.
Rehabilitation and Upgradation to 2-lane with paved shoulders configuration of Bewar-Allahganj Section (KM 0.000 to KM 52.770) of NH-730C in the State of Uttar Pradesh under GNHCP with the loan assistance of World Bank on EPC mode.
Rehabilitation and Upgradation to 4-lane configuration of Ras-Beawar Section (km 0.000 to km 30.000) of NH-158 in the State of Rajasthan under Green National Highways Corridor Project (GNHCP) with the loan assistance of World Bank on EPC mode
Construction of Eight Lane Carriageway starting from Major bridge over Takli river near Nayagaon Jageer village to Rajasthan-MP Border (Ch.427.300 to Ch.452.425) section of Delhi-Vadodara (NH-148N) under BMP in the State of Rajasthan on EPC mode
CS for AE services for 4laning of(i)Thirumangalam Vadugapatti section from Km. 0.000 to Km 36.000 of NH744(PckgI) and (ii)Vadugapatti Therkuvenganallur section from Km36.000 to KM71.600 of NH744(PckgII) in Tamil Nadu on EPC Mode under BMP