Loading…
Loading…
239 results • Best match
Custom Bid for Services - Work of capacity enhancement at Coal Handling plant Stage-II of Ukai TPS on EPC basis Similar Category Repair, Maintenance, and Installation of Plant Systems/Equipments (Version 2)
CS for AE services for Widening to 6Lane of Existing 4lane Jetpur Gondal Rajkot Sec from Km. 117.600 to Km. 185.00 on NH27 in the state of Gujarat on EPC Mode under Bharatmala Pariyojana
AE for Construction of Additional Structures including approaches in Vadodara Surat section of NH48 between Existing Km 108.000 to Km 250.000 of NH48 on EPC mode under NH(O) in the state of Gujarat
Rehabilitation and Up-gradation to 2 LPS/ 4 laning configuration of Chikhli-Dabhadi-Talegaon-Pal Phata section of NH-752H from Km 179.430 to Km 141.800 in the State of Maharashtra on EPC Mode.
Widening to Six Lane of Existing Four lane Jetpur-Gondal-Rajkot Section from Km. 117.600 to Km. 185.00 on National Highway No.27 in the state of Gujarat on EPC Mode under Bharatmala Pariyojana
Upgradation n Strengthening of Kamrej Chalthan Sec of NH48 from Km249.00 to Km 262.875 to 6L Divided Carriageway with Service Road on both sides L 13.875 Km in Gujarat on EPC mode 2nd Call
Upgradation to two lane with paved shoulder from design ch km 118.813 to 148.810 and km 155.0 to 165.082 Bagasara to Thangalol section of NH351 in the state of Gujarat Package IV on EPC mode
Design, Engineering, Supply, Erection, Testing and Commissioning of DCS based control system and associated works on EPC mode for the project Supply, Installation, Testing and Commissioning of FGD System for 1X500 MW Unit6 Ukai TPS
Upgradation and Strengthening of Kamrej Chalthan Section of NH 48 from Km 249.00 to Km 262.875 to 6 Lane Divided Carriageway with Service Road on Both Sides (Length 13.875 Km) in Gujarat on EPC mode
Tender for Design, Engineering, Supply, Fabrication, Installation, Testing and Commissioning of Overall Mechanical Package in all respects (on EPC Mode) for the project of FGD system of Ukai TPS with 03 years comprehensive OandM contract
Construction of Seven FoBs between Km 307.700 and Km 364.000 along with RCC Crash Barrier of 600m length at Km 336.550 on Surat Vapi Section of NH_48 in the State of Gujarat on EPC Mode
Engagement of user fee agency on the basis of EQ through etender for 8 Lane Delhi-Vadodara Expressway from km 0.000 to km 228.748 on National Highway No. NE 4 Haryana and Rajasthan on EPC Mode
Construction of Six lane Elevated Structure at Gondal Chowkdi at Ch. Km 175.000 on existing 4 lane Jetpur Gondal Rajkot section from km 117.600 to km 185.000 on NH27 (old NH8B) in Gujarat on EPC mode.
Construction of 8Lane access-controlled expressway starting from junction with SH-152 near Matariya Vadi and near Bhamaiya village in Panchmahal district (Ch.756.052-781.282) section of Delhi-Vadodara GAon EPC Mode under BMP in Gujarat
Construction of Four Lane VUP at Km. 649.617 including Service Road and Drains at Hanuman Tekari and other miscellaneous work on Abu road- Swaroopganj Section of NH-27 in the state of Rajasthan on EPC mode
Construction of Eight lane access controlled Expressway from km 128.000 to km 154.600 of Vadodara Mumbai Expressway (Karvad to Jujuwa section) in the State of Gujarat on EPC Mode under Bharatmala Pariyojana (Phase I Package IX)
Construction of Eight lane access controlled Expressway from Km 154.600 to Km 190.000 of Vadodara Mumbai Expressway (Jujuwa to Gandeva Section) in the State of Gujarat on EPC Mode under Bharatmala Pariyojana (Phase I Package-VIII)
Design, Engineering, Supply, Erection, Testing and Commissioning of Transformer Bay Extension of existing 220kV Switchyard and Associated Works on EPC Mode for the project SITC of FGD system for 500 MW Unit No. 6 of Ukai TPS.
Construction of Eight Lane Carriageway starting near Major Bridge on Mej River to Junction with SH-37A (Ch. 331.030-359.170) section of Delhi-Vadodara Access Controlled GFA (NH-148N) on EPC Mode under Bharatmala Pariyojana in Rajasthan
4 Laning with paved shoulders from Km 0.900 to Km 11.650, Missing Link Project (Budhel Junction to Nari circle including Flyover at Nari and its approaches) section of NH51 in the state of Gujarat on EPC Mode
Consultancy Services for AE for Supervision of Construction of 8-lane access controlled Greenfield Delhi-Vadodara Expressway starting at Rajasthan-MP Border to Bardawadi village of Mandsaur district in Madhya Pradesh on EPC mode under BM Pariyojana
Construction of 8 Lane access controlled expressway starting from junction with SH63 Pratap Nagar village ending junction with NE1 near Dodka of Vadodara District section Delhi Vadodara Greenfield Alignment on EPC Mode under BM Pariyojana in Gujarat.
Design, Engg, Supply, Installation and Construction of 150 m high RCC Single New Wet Chimney with Single 1 No. Flue with Lining and other auxiliary works required to complete the Chimney package EPC mode in all respects
Construction of Four lane expressway from start of DSIR zone of Ahmedabad district to Adhelai village of Bhavnagar district (ch. 71.00 to ch. 109.019) section of Ahmedabad- Dholera Greenfield alignment (NH-751) on EPC mode under Bharatmalapriyojana
Work of development and construction of elevated corridor from km 38.660 to km 42.690 (from Iscon Junction to Start point of approach of Sanand Flyover) of NH-147 in the State Of Gujarat (Length - 4.030 km) EPC mode
Consultancy Service for proof checking, assisting supervision of work, Quality Control of Upgradation and strengthening to 2 lane_PS from km. 95.500 to 129.775 of NH168G Idar-Bhiloda-Samlaji in the state of Gujarat under EPC mode (Length 34.275Km)
Consultancy services for Authoritys Engineer for supervision of construction of Four Lane Expressway from Sardar Patel ring road to Sindhrej Village of Ahmedabad District Ch 0 to 22 section of Ahmedabad-Dholera Greenfield Alignment NH751 on EPC Mode
Four laning with paved shoulder of Madhavpur to Porbandar section of NH-8E (Ext.) old/NH-51(new) from km 338.400 (Design Chainage km 338.400) to km 379.100 (Design Chainage km 379.100) in Gujarat through on EPC mode
2nd Consultancy Service for proof checking, assisting supervision of work, Quality Control of Upgradation and strengthening to 2 lane_PS from km. 95.500 to 129.775 of NH168G Idar-Bhiloda-Samlaji in the state of Gujarat under EPC mode (Length 34.275Km
Appointment of Safety Consultant from Sardar Patel Ring Road (km 0.00) to Adhelai village of Bhavnagar dist (km 109.019) of Ahmedabad-Dholera Greenfild Alignment (NH-751) under Bharatmala pariyojana in Gujarat on EPC Mode A-D Exp Pkg-1,2,3,4
Rectification of Blackspot through Long Term Measures by construction of 3-Lane Unidirectional VUP with Service Road near Roladungri at km 326.570 (Black spot ID GJ-02-129) on NH-48 in the State of Gujarat on EPC Mode
Authority Engineer for Construction of Additional Structures including approaches in Vadodara-Surat section of NH-48 between Existing Km 108.000 to Km 250.000 of NH-48 on EPC mode under NH(O) in the state of Gujarat 2nd CALL
Construction of Eight Lane expressway starting from Junction with NH-47 near Bhamaiya village and ending at Junction with SH-175 in Baletiya village of Delhi-Vadodara Greenfield Alignment on EPC MODE under BMP in the State of Gujarat
Balance work of 4 laning of Indore Gujarat MP Border from km 106.210 to km 115.250 Machilya Ghat Section and Forest portion km 149.80 to km 150.85 of NH-47 on EPC Mode in the State of Madhya Pradesh.
Construction of Eight Lane access controlled Expressway starting near Junction with SH-37A to Junction with NH-76 (Ch.359.170-388.420) section of Delhi-Vadodara Green field Alignment on EPC Mode under Bharatmala Pariyojana in the State of Rajasthan
Construction and improvement of Road Bakhasar Mavasari from Km 0.00 to Km 32.49 Design Length 31.703 Km from existing CL 9 specifications to NHDL specifications under 45 BRTF of Project Chetak in Rajasthan and Gujarat State in EPC mode
Engaging Service Provider for Consultancy and Contracting for hiring quality control field staff for assisting in collection of samples conducting tests for QATA for the works of PR of NH 753B MH Border Dediyapada section in the SoG under EPC Mode.
Upgradation of Existing Two-Lane Carriageway to Two Lane Carriageway with Paved Shoulder from Ch. 665.686 (Existing Km. 665.686) in Khanpur Village to Ch. 710.462 ( Km. 710.483 in Karvad Village (Length 44.776) Sec. of NH-56 in Gujarat on EPC Mode.
Construction of Eight Lane Carriageway starting from Major bridge over Takli river near Nayagaon Jageer village to Rajasthan-MP Border (Ch.427.300 to Ch.452.425) section of Delhi-Vadodara (NH-148N) under BMP in the State of Rajasthan on EPC mode
Construction of 8Lane access-controlled expressway starting after the end of Bridge over Hadaf River near Hathiyavan village with SH-152 near Matariya Vadi in Panchmahal (Ch.729.700-756.052) of Delhi-Vadodara GA on EPC Mode under BMP in Gujarat
Construction of 8Lane AC expressway starting from MP-Gujarat Border near Chhayan village and ending after Bridge Over Hadaf River near Hathiyavan village (Ch.696.920 to 729.755) section of Delhi-Vadodara GA(NH-148N) on EPC Mode under BMP in Gujarat
Consultancy Services for AE for Supervision of Construction of 8 Lane ACE starting near Major Bridge on Mej River to Rajasthan MP Border section of Delhi Vadodara Greenfield Alignment NH-148N on EPC Mode under BMP in the State of Rajasthan
Construction of Four Lane Expressway from Sardar Patel ring road to Sindhrej Village of Ahmedabad District from km 0 to 22.000 of Ahmedabad-Dholera Greenfield Alignment (NH-751) in the State of Gujarat on EPC Mode under Bharatmala Pariyojana (Package
Construction of Four Lane Divided Carriageway with Paved Shoulder from Patan (Near Rajpur) at Km 52.000 (design) to Gojariya at Km 128.940 (design), a length of 76.940 km (PKG II) of NH-68 in Gujarat under NH(O) on EPC Mode
Construction of 8 Lane Expressway starting near Junction with NH-12 near village Ummedpura to Major bridge over Takli river near Nayagaon Jageer village (Ch.419.000-427.300) section of Delhi-Vadodara GFA (NH-148N) under BMP in Rajasthan on EPC Mode
Construction Of Six Lane Flyover at the Junction Of Kandari Chokdi (Ch. 149.440) And Luvara Patiya (Ch.186.640) for Rectification of Blackspots on Vadodara - Surat Section Of NH-8 (New NH-48) in the State of Gujarat on EPC Mode.
Construction of Four Lane Expressway from Vejalka Village to start of DSIR Zone of Ahmedabad District from km 48.520 to km 71.060 section of Ahmedabad-Dholera Greenfield Alignment (NH-751) on EPC Mode Under Bharatmala Pariyojana in the State of Gujar
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Construction of 4 lane with PS Idar-Badoli bypass section from Design chainage km 81.300 to 95.500 of NH-168G in the state of Gujarat ,Total Length 14.2 Km, on EPC mode
Tender for Design, Engineering, Supply, Erection, Testing and Commissioning of HT LT Package and its associated works on EPC mode for the project of Supply, Installation, Testing and Commissioning of FGD System for 1 500 MW Unit 6 Ukai TPS,
PRE-BID TIE-UP/ MOU FOR EXECUTION OF BOP PACKAGES ON EPC BASIS AT 1X800 MW ULTRA SUPER CRITICAL UNIT No. 7 TO BE CONSTRUCTED ON ASH DYKE AREA AT UKAI TPS, GSECL, GUJARAT.