Loading…
Loading…
1,499 results • Best match
Changing of 32 mm dia GI Rotten Riser pipe Connecting Rod C.I. Cylinder of DT and deposit taken out old materials to dept. store etc all complete job under DWS Div. JMT for the year 2021-22 on Turn Key Basis (Gr No. JMT/RRP/Markacho/5/89 Nos)
CONST OF 125/115 MM DIA WITH. 90M DT WITH INSTALLATION OF INDIA MARK II HP WITH 32 MM DIA.GI MEDIUM CLASS RISER PIPE WITH 125MM DIA BLUE CASING UPVC PIPE WITH DRAIN ON TURN KEY BASIS UNDER D.W.S. DIVISION, NO.-2, GIRIDIH GROUP NO GRD/DT/90MTR -20
Changing of 32 mm dia GI Rotten Riser pipe Connecting Rod C.I. Cylinder of DT and deposit taken out old materials to dept. store etc all complete job under DWS Div. JMT for the year 2021-22 on Turn Key Basis (Gr No. JMT/RRP/Satgawan/2/94 Nos)
Relocation of Defunct Tube Well of 125 mm x 115 mm dia x 60 Mtr Deep (Av) DT Well complete with Installation of IM II H.P etc. all complete job in different blocks under D. W. and S. Division Jh.Telaiya for 2022-23 On Turn Key Basis (2nd Call)
CONST OF 125/115 MM DIA WITH. 70M DT WITH INSTALLATION OF INDIA MARK II HP WITH 32 MM DIA.GI MEDIUM CLASS RISER PIPE WITH 125MM DIA BLUE CASING UPVC PIPE WITH DRAIN ON TURN KEY BASIS UNDER D.W.S. DIVISION, NO.-2, GIRIDIH GROUP NO GRD/DT/70MTR -3
Construction of GPT 300 x125mm dia x 60 Mtrs depth with installation of IM-II HP lowering 32 mm dia G.I. pipe with platform drain in different block under D.W. and S. Division, JMT for the year 2020-21 on Turn-Key Basis (Gr JMT/GPT/01/28 Nos)
Construction of 125 x115mm x 90 Mtrs deep DTW with installation of IM-II HP lowering 32 mm dia G.I. pipe with platform drain in different block under D.W. and S. Division, JMT for the year 2020-21 on Turn-Key Basis (Gr JMT/DEEP/DT/01/38 Nos)
CONST OF 125/115 MM DIA WITH. 70M DT WITH INSTALLATION OF INDIA MARK II HP WITH 32 MM DIA.GI MEDIUM CLASS RISER PIPE WITH 125MM DIA BLUE CASING UPVC PIPE WITH DRAIN ON TURN KEY BASIS UNDER D.W.S. DIVISION, NO.-2, GIRIDIH GROUP NO GRD/DT/70MTR -6
CONST OF 125/115 MM DIA WITH. 90M DT WITH INSTALLATION OF INDIA MARK II HP WITH 32 MM DIA.GI MEDIUM CLASS RISER PIPE WITH 125MM DIA BLUE CASING UPVC PIPE WITH DRAIN ON TURN KEY BASIS UNDER D.W.S. DIVISION, NO.-2, GIRIDIH GROUP NO GRD/DT/90MTR -21
CONST OF 125/115 MM DIA WITH. 70M DT WITH INSTALLATION OF INDIA MARK II HP WITH 32 MM DIA.GI MEDIUM CLASS RISER PIPE WITH 125MM DIA BLUE CASING UPVC PIPE WITH DRAIN ON TURN KEY BASIS UNDER D.W.S. DIVISION, NO.-2, GIRIDIH GROUP NO GRD/DT/70MTR -02
CONST OF 125/115 MM DIA WITH. 70M DT WITH INSTALLATION OF INDIA MARK II HP WITH 32 MM DIA.GI MEDIUM CLASS RISER PIPE WITH 125MM DIA BLUE CASING UPVC PIPE WITH DRAIN ON TURN KEY BASIS UNDER D.W.S. DIVISION, NO.-2, GIRIDIH GROUP NO GRD/DT/70MTR -8
CONST OF 125/115 MM DIA WITH. 90M DT WITH INSTALLATION OF INDIA MARK II HP WITH 32 MM DIA.GI MEDIUM CLASS RISER PIPE WITH 125MM DIA BLUE CASING UPVC PIPE WITH DRAIN ON TURN KEY BASIS UNDER D.W.S. DIVISION, NO.-2, GIRIDIH GROUP NO GRD/DT/90MTR -15
CONST OF 125/115 MM DIA WITH. 70M DT WITH INSTALLATION OF INDIA MARK II HP WITH 32 MM DIA.GI MEDIUM CLASS RISER PIPE WITH 125MM DIA BLUE CASING UPVC PIPE WITH DRAIN ON TURN KEY BASIS UNDER D.W.S. DIVISION, NO.-2, GIRIDIH GROUP NO GRD/DT/70MTR -9
CONST OF 125/115 MM DIA WITH. 70M DT WITH INSTALLATION OF INDIA MARK II HP WITH 32 MM DIA.GI MEDIUM CLASS RISER PIPE WITH 125MM DIA BLUE CASING UPVC PIPE WITH DRAIN ON TURN KEY BASIS UNDER D.W.S. DIVISION, NO.-2, GIRIDIH GROUP NO GRD/DT/70MTR -7
CONST OF 125/115 MM DIA WITH. 90M DT WITH INSTALLATION OF INDIA MARK II HP WITH 32 MM DIA.GI MEDIUM CLASS RISER PIPE WITH 125MM DIA BLUE CASING UPVC PIPE WITH DRAIN ON TURN KEY BASIS UNDER D.W.S. DIVISION, NO.-2, GIRIDIH GROUP NO GRD/DT/90MTR -17
Construction of 125 x115mm x 90 Mtrs deep DTW with installation of IM-II HP lowering 32 mm dia G.I. pipe with platform drain in different block under D.W. and S. Division, JMT for the year 2020-21 on Turn-Key Basis (Gr JMT/DEEP/DT/02/37 Nos)
Construction of GPT 300 x125mm dia x 60 Mtrs depth with installation of IM-II HP lowering 32 mm dia G.I. pipe with platform drain in different block under D.W. and S. Division, JMT for the year 2020-21 on Turn-Key Basis (Gr JMT/GPT/02/28 Nos)
CONST OF 125/115 MM DIA WITH. 70M DT WITH INSTALLATION OF INDIA MARK II HP WITH 32 MM DIA.GI MEDIUM CLASS RISER PIPE WITH 125MM DIA BLUE CASING UPVC PIPE WITH DRAIN ON TURN KEY BASIS UNDER D.W.S. DIVISION, NO.-2, GIRIDIH GROUP NO GRD/DT/70MTR -12
CONST OF 125/115 MM DIA WITH. 70M DT WITH INSTALLATION OF INDIA MARK II HP WITH 32 MM DIA.GI MEDIUM CLASS RISER PIPE WITH 125MM DIA BLUE CASING UPVC PIPE WITH DRAIN ON TURN KEY BASIS UNDER D.W.S. DIVISION, NO.-2, GIRIDIH GROUP NO GRD/DT/70MTR -04
CONST OF 125/115 MM DIA WITH. 90M DT WITH INSTALLATION OF INDIA MARK II HP WITH 32 MM DIA.GI MEDIUM CLASS RISER PIPE WITH 125MM DIA BLUE CASING UPVC PIPE WITH DRAIN ON TURN KEY BASIS UNDER D.W.S. DIVISION, NO.-2, GIRIDIH GROUP NO GRD/DT/90MTR -18
Changing of 32 mm dia GI Rotten Riser pipe Connecting Rod C.I. Cylinder and deposit taken out old materials to dept. store etc all complete job under DWS Div. JMT for the year 2021-22 on Turn Key Basis (Gr No. JMT/RRP/Chandwara/6/117 Nos) 2nd Call
CONST OF 125/115 MM DIA WITH. 120M DT WITH INSTALLATION OF INDIA MARK II HP WITH 32 MM DIA.GI MEDIUM CLASS RISER PIPE WITH 125MM DIA BLUE CASING UPVC PIPE WITH DRAIN ON TURN KEY BASIS UNDER D.W.S. DIVISION, NO.-2, GIRIDIH GROUP NO GRD/DT/120MTR -2
Changing of 32 mm dia GI Rotten Riser pipe Connecting Rod C.I. Cylinder of DT and deposit taken out old materials to dept. store etc all complete job under DWS Div. JMT for the year 2021-22 on Turn Key Basis (Gr No. JMT/RRP/Koderma/1/109 Nos)
CONST OF 125/115 MM DIA WITH. 70M DT WITH INSTALLATION OF INDIA MARK II HP WITH 32 MM DIA.GI MEDIUM CLASS RISER PIPE WITH 125MM DIA BLUE CASING UPVC PIPE WITH DRAIN ON TURN KEY BASIS UNDER D.W.S. DIVISION, NO.-2, GIRIDIH GROUP NO GRD/DT/70MTR -1
CONST OF 125/115 MM DIA WITH. 90M DT WITH INSTALLATION OF INDIA MARK II HP WITH 32 MM DIA.GI MEDIUM CLASS RISER PIPE WITH 125MM DIA BLUE CASING UPVC PIPE WITH DRAIN ON TURN KEY BASIS UNDER D.W.S. DIVISION, NO.-2, GIRIDIH GROUP NO GRD/DT/90MTR -19
Construction of 125/115 mm dia 90 mtr Deep Drilled Tube Well for drilling in all kinds of soil rock for installation of hand pump on Turn Key Basis at different Block under DW and S Division Ranchi West Ranchi year 2020-21 (Gr DDT RW-2) 50 Nos
Relocation of 125mm X115 mm dia 60 Mtr Avg. deep DTW IM- II H P 32 mm dia riser pipe by DTH Rig. Mach. Blue UPVC casing pipe cons of platform drain on TURN KEY BASIS in under DWS Divi Sahibganj FY 2024-25 (State Plan) (Group No - SRDT)
Revival of Defunct IM II Hand Pumps by Changing of 32 mm. Dia. Rotten Riser Pipe,Connecting Rod, C.I Cylinder etc. in Rural Area within the jurisdiction of D.W and S. Division No.-01, Dumka for the year 2026-27 on Turn-Key basis. GROUP-SKP/RRP-02
Revival of Defunct IM II Hand Pumps by Changing of 32 mm. Dia. Rotten Riser Pipe,Connecting Rod, C.I Cylinder etc. in Rural Area within the jurisdiction of D.W and S. Division No.-01, Dumka for the year 2026-27 on Turn-Key basis. GROUP-RAN/RRP-04
Revival of Defunct IM II Hand Pumps by Changing of 32 mm. Dia. Rotten Riser Pipe,Connecting Rod, C.I Cylinder etc. in Rural Area within the jurisdiction of D.W and S. Division No.-01, Dumka for the year 2026-27 on Turn-Key basis. GROUP-RAN/RRP-05
Revival of Defunct IM II Hand Pumps by Changing of 32 mm. Dia. Rotten Riser Pipe,Connecting Rod, C.I Cylinder etc. in Rural Area within the jurisdiction of D.W and S. Division No.-01, Dumka for the year 2026-27 on Turn-Key basis. GROUP-SKP/RRP-01
Revival of Defunct IM II Hand Pumps by Changing of 32 mm. Dia. Rotten Riser Pipe,Connecting Rod, C.I Cylinder etc. in Rural Area within the jurisdiction of D.W and S. Division No.-01, Dumka for the year 2026-27 on Turn-Key basis. GROUP-GOP/RRP-03
Revival of Defunct IM II Hand Pumps by Changing of 32 mm. Dia. Rotten Riser Pipe,Connecting Rod, C.I Cylinder etc. in Rural Area within the jurisdiction of D.W and S. Division No.-01, Dumka for the year 2026-27 on Turn-Key basis. GROUP-KAT/RRP-06
Relocation of 125 x 115 mm dia and 90 mtr (av.) deep DT with installation of IM-II Hand pump, 1.85m dia meter PCC Platform and 3.0 m. long drain on Turn Key Basis in different rural habitation under DW and S Division, Deoghar for the year 2026-27
Relocation of 125 x 115 mm dia and 70 mtr (av.) deep DT with installation of IM-II Hand pump, 1.85m dia meter PCC Platform and 3.0 m. long drain on Turn Key Basis in different rural habitation under DW and S Div, Deoghar for the year 2026-27
Construction of 400 kV QM DC Chandil-Chaibasa Transmission line on turnkey basis
Construction of 400 kV QM DC Chandil-Dhanbad Transmission line on turnkey basis
Construction of 220 kV DC 3ph Chandil - Chandil transmission line on turnkey basis
Sikatia Megalift Irrigation Scheme on Turnkey basis with 5 years OMM (complete job)
RUKKA RURAL WATER SUPPLY SCHEME ON TURNKEY BASIS UNDER DWSD RANCHI EAST RANCHI
Palajori Block RuralWater Supply Schemeunder D.W. and S. Division Madhupur on turnkey basis
eligible bidders for Fire Safety Work on Turnkey basis at Sadar Hospital, Lohardaga
Construction of Solar Energy Based M R P WSS in different blocks which is not included in MVS or Other Schemes to supply water and house connection with 05 Yrs OM works on Turn Key Basis Under D W S D Hazaribag for the Year 2021-22 Head-JJM GR_SVS_39
Construction of Solar Energy Based M R P WSS in different blocks which is not included in MVS or Other Schemes to supply water and house connection with 05 Yrs OM works on Turn Key Basis Under D W S D Hazaribag for the Year 2021-22 Head-JJM GR_SVS_38
Construction of Solar Energy Based M R P WSS in different blocks which is not included in MVS or Other Schemes to supply water and house connection with 05 Yrs OM works on Turn Key Basis Under D W S D Hazaribag for the Year 2021-22 Head-JJM GR_SVS_19
Construction of 125/115 mm dia with. 70m/90m/120m mtrs deep D/T well by DTH Rig Machine with installation of India mark II H. P with drain, platform on turn - key basis under D.W. and S Division Ramgarh for the year 23-24. GR.No. RMG/DT/70mtr-8
Construction of Solar Energy Based M R P WSS in different blocks which is not included in MVS or Other Schemes to supply water and house connection with 05 Yrs OM works on Turn Key Basis Under D W S D Hazaribag for the Year 2021-22 Head-JJM GR_SVS_51
Construction of 125/115 mm dia with. 70m/90m/120m mtrs deep D/T well by DTH Rig Machine with installation of India mark II H. P with drain, platform on turn - key basis under D.W. and S Division Ramgarh for the year 23-24. GR.No. RMG/DT/70mtr-5
Construction of Solar Energy Based M R P WSS in different blocks which is not included in MVS or Other Schemes to supply water and house connection with 05 Yrs OM works on Turn Key Basis Under D W S D Hazaribag for the Year 2021-22 Head-JJM GR_SVS_30
Construction of 125/115 mm dia with. 70m/90m/120m mtrs deep D/T well by DTH Rig Machine with installation of India mark II H. P with drain, platform on turn - key basis under D.W. and S Division Ramgarh for the year 23-24. GR.No. RMG/DT/70mtr-2