Loading…
Loading…
1,499 results • Best match
CONST. OF 14 NOS. TOILET ETC. ON TURN KEY BASIS. GROUP NO. PAKUR 01
CONST. OF 10 NOS. TEMPORARY TOILET ON TURN KEY BASIS. GROUP NO. PAKUR 01
Widening and Reconstruction to 2-Lane with paved shoulder from km 138.20 to km 140.00 of NH-114A in the state of Jharkhand under EPC mode.(Job No -NH-114A-AP-JHR-2021-22-309)
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Rehabilitation/Upgradation from Lagam to Alapalli to 2L.PS / 4 lane configuration section of NH-353 C in Gadchiroli District in the state of Maharashtra on EPC mode
Consultancy Services for DPR Preparation on EPC mode for Construction of RoB at Railway level crossing in Km 40.30 of NH 218 near Bhowra in the State of Jharkhand including Land Acquisition and Utility Shifting
Consultancy Services for DPR Preparation on EPC mode for Construction of RoB at Railway level crossing in Km 37.80 of NH 218 near Manpur in the State of Jharkhand including Land Acquisition and Utility Shifting
Construction of 4 lane Elevated corridor of Kalimandir-Dimna Chowk-Baliguma (Jamshedpur) Section of NH-33 (New NH-18) (from km 241.940 to km 251.961) (Length 10.021 km) under NH(O) on EPC mode in Jharkhand
CONST. OF SOLAR BASED WATER SUPPLY SCHEME ON TURN KEY BASIS GROUP NO. SVS 186
CONST. OF SOLAR BASED WATER SUPPLY SCHEME ON TURN KEY BASIS GROUP NO. SVS 180
CONST. OF HYDT, 02 NOS. TOILET ETC. ON TURN KEY BASIS GROUP NO. PAKUR 01
CONST. OF 06 NOS. BATHING UNIT ETC. ON TURN KEY BASIS. GROUP NO. PAKUR 01
CONST. OF SOLAR BASED WATER SUPPLY SCHEME ON TURN KEY BASIS GROUP NO. SVS 185
CONST. OF SOLAR BASED WATER SUPPLY SCHEME ON TURN KEY BASIS GROUP NO. SVS 177
Turn Key works for setting-up of New AMRIT OPD-IPD Pharmacy, AIIMS - Deoghar, Jharkhand
CONST. OF SOLAR BASED WATER SUPPLY SCHEME ON TURN KEY BASIS GROUP NO. SVS 190
Consultancy Services for DPR Preparation on EPC mode for Construction of Minor Bridges at Km 265 Pandaydih Km 268 Manjhidih and Km 277 Chhachando of NH 114A in the State of Jharkhand for the year 2021 22
Construction of ROB at Km 116 of NH-99 (new NH-22) at Chandwa (LC No. 12A/T) in the State of Jharkhand on EPC mode (Job No. NH-99-(New NH-22)-JHR-2020-21/287)
Construction of Balanced work of 2 Lane H.L. RCC Bridge with its Approaches from CH 0.000 to 2.150 KM across river sone in the State of Bihar (Via Panduka) and Jharkhand under CRIF Scheme on EPC Mode.
Providing Architectural and Engineering Consultancy services for approx. 15000 KW Rooftop Solar PV Power plant System Phase I in various locations at Bokaro Steel Plant, Bokaro, Jharkhand on EPC Basis
Consultancy Services for DPR Preparation on EPC mode for Construction of High Level Bridge over Damodar River beside existing Birsa Bridge at Km 39.700 of NH 218 in the State of Jharkhand including Land Acquisition and Utility Shifting
Reconstruction of Existing Major Bridge including Bridge approach from km 171.246 to km 171.774 on Ranchi-Rargaon-Mahulia Section from Km 114.000 to Km 277.500 of NH-33 in the State of Jharkhand on EPC Mode 3rd call
CONST. OF TOILET WITH WITH WATER ARRANGEMENT FOR FEMALE COUNTING AGENT ETC. ON TURN KEY BASIS
CONST. OF TOILET WITH WITH WATER ARRANGEMENT FOR MALE COUNTING AGENT ETC. ON TURN KEY BASIS
Design, Supply, Erection, Commissioning and Testing of Grid Connected 4000 kWp Solar Power Plant on Various Sheds Building on EPC basis including 05 Year Operation Maintenance at Bokaro Steel Plant, Jharkhand
Execution of balance street lighting works in BHEL scope of EPC contractof PVUNL Patratu 3x800 MW Phase I
Widening and strengthening of road to 2-lane with earthen shoulders in km 36.100 to 60.600 (Dumri- kurud more) of NH-143B on EPC Mode for the year 2021-22 under NH Division , Gumla in the state of Jharkhand
AE for Supervision of Construction of 4lane Elevated corridor of Kalimandir Dimna ChowkBaliguma (Jamshedpur) Section of NH33 (New NH18) (from km 241.940 to km 251.961) (Length 10.021 km) under NH(O) on EPC mode in the State of Jharkhand
Consultancy Services for Authority Engineer for Construction of Six laning of Aurangabad to Bihar-Jharkhand Border (Chordaha) Section of NH-2 from km. 180.000 to km. 209.827 (PKG-I) in the State of Bihar under Bharatmala on EPC Mode
Construction of High level Golpahari bridge at km 40.766 with approaches (Design Chainage from km 39.700 to km 41.500) on NH-419 in the State of Jharkhand on EPC mode (JOB NO- NH-419/AP/Ranchi/2021- 22-318).
Consultancy Services for DPR Preparation for Widening to 4-lane with paved shoulder from Km 57.049 to Km 79.147 of NH-98 in the State of Jharkhand on EPC mode including Land Acquisition, Forest Clearance and Utility Shifting etc.
Construction of Balance Work of Bypass around Gumla town connecting NH-78 and NH-23(R-G) in the State of Jharkhand (km 0.00 to km 12.842) on EPC mode. (Job No.-078 and 023-JHR-2013-14-229)
Authoritys Engineer for Supervision of Construction of Widening, Strengthening and Reconstruction to four lane of Gola - Muri Road (MDR-024) (Approx Length-25.163 Km.) in the state of Jharkhand on EPC Basis
Water supply for Pandra Referal Hospital Nirsa Block Dhanbhad District under DMFT Head on turn key Basis
Custom Bid for Services - EPC Contract of 25 kWp Roof top Solar Project at Health Centre Building at Dhenga at NTPC PBCMP Similar Category Design, Supply, Installation, Commissioning and Maintenance of Grid Connected Roof Top Solar Power Plant Service
Realignment of road from Km 35.935 to 39.255 Chowdapur village Km 58.220 to Km.62.290 Afzalpur Town and Km 70.125 to Km 72.920 Ballurgi village of NH150E with 2 lane paved shoulder in the state of Karnataka on EPC Mode
Widening and Strengthening to 2-Lane with Paved Shoulder and geometric improvement of NH-114A from km 65.500 (Tower Chowk Dumka) to km 87.530 (Basukinath) on EPC mode in the state of Jharkhand.(JOB NO-NH-114A-JHR-2020-21/291)
Construction of 6-lane Grade Separator at km.36.530 with LVUP at km. 36.894 including Approaches to Grade separator-LVUP from km.35.840-km.37.240 in Barhi-Hazaribagh Section(Hazaribagh Bypass) of the NH-33 in Jharkhand on EPC mode
CS for AE for supervision of Construction of Elevated Corridor in Ranchi city from Km 0.00 to Km 3.260 of NH75 including down ramp on NH23 from Km 0.100 to Km 0.600 in the State of Jharkhand on EPC mode
IRQP of road work from Km 16.00 to Km 61.00 (excluding Km 27.925 to Km 29.065 and Km 39.00 to Km 40.500) of NH-75E in the state of Jharkhand under EPC mode (Job No - NH-75E-JHR-2021-22-302)
Construction of ROB at km 168.954 of NH-75E between Talaburu and Kendposi railway station (LC No. RBK-30) in the State of Jharkhand on EPC mode for the year2021-22(Job No. NH-75E/AP/JHR/2021-22-315).
Widening and reconstruction to 2-Lane with paved shoulder from km 10.900 to km 24.793 (excluding km 14.855 to km 16.291) of NH-133 in the state of Jharkhand under EPC mode (Job No-NH-133-AP-JHR-2021-22-308)
Widening and Reconstruction to 4 Lane/4 lane with Service road including structures from Pokhria More at km 47.600(Ex. Km 50.230) to Govindpur at km 62.949(Ex Km 65.325) of NH-419 in the State of Jharkhand on EPC mode.
Widening and Reconstruction to 2 Lane with paved shoulder from Runarayanpur to Pokharia More from (Design Km 8.56) to (Design Km 38.656) and (Design Km 40.456) to (Design Km 46.375) of NH-419 in the State of Jharkhand on EPC mode.
Rectification of identified Accident Black Spots using Long term measures (i) from km 15.6000 to 16.000 near Doy Dholia bridge and (ii) from km 79.100 TO 79.200 near Sahakri on NH-133 in the state of Jharkhand on EPC Mode.
Construction of ROB at km 160.327 of NH-75E between S Jhinkpani and Talaburu railway station (LC No. RBK-24) in the State of Jharkhand on EPC mode for the year2021-22(Job No. NH-75E/AP/Ranchi/2021-22-316)
Widening and Strengthening to 2-Lane with Paved Shoulder along with geometric improvement including Replacement of Culverts from km 79.00 to km 117.20 of NH-99 under NH(O) on EPC mode in the state of Jharkhand under NH Division, Ranchi
Construction of ROB at km 154.831 of NH-75E between Singhpokharia and Jhinkpani railway station (LC No. RBK-21) in the State of Jharkhand on EPC mode for the year2021-22(Job No. NH-75E/AP/Ranchi/2021-22-317).
Construction of ROB at km 164.444 of NH-75E between S Jhinkpani and Talaburu railway station (LC No. RBK-26) in the State of Jharkhand on EPC mode for the year2021-22(Job No. NH-75E/AP/JHR/2021-22-320).
Construction of MSME Technology Centre at Bokaro (Jharkhand) under the Scheme Establishment of New Technology Centre/Extension Centre on Engineering Design, Procurement and Construction (EPC) basis including Maintenance for 2 years during DLP Period
Constr. of 6lane elevated flyover inclu. reconst rehab of exist pavement from Km 426.230 to Km 430.500 at Nirsa in the Barwa Adda Panagarh sec of NH19 Km.398.240 to Km.521.120 inclu Panagarh Bypass in Jharkhand on EPC Mode under NH(O)