Construction of 11 KV S/C Rabbit line on 66 KV D/C towers for Gangavali river crossing for a distance of 500m from Ramanaguli to kalleshwara in Rural 2 section of Ankola Taluk, Uttar Kannada on total turn key and lumpsum basis.
Project Management Consultancy Services for the work of Survey, Investigation, Design, Supply, Installation, Erection, Laying, Construction and Commissioning of MS Pipe Gravity Main from MBR to IPS-3 and construction of Intermediate Pumping Station-3 ... on EPC Basis . ...
EPC PACKAGE WTH 220kV SUBSTATION FOR CTU GRID CONNECTED SOLAR PV PROJECT (500W/600MWp) AT PAVAGADA IN STATE OF KARNATAKA
Consultancy Services for appointment of Design Consultant for providing comprehensive design services for Construction of New Outpatient Department OPD building at NIMHANS Campus Bangaluru Karnataka to be undertaken on EPC Mode III
Improvement of Riding Quality Programme IRQP from KM 72.600 Design Ch. 70.900 to Km 85.880 Design Ch.79.650 of N.H.150 Yadgir Town limit in the state of Karnataka on EPC mode
Air Conditioning system for laser drilling machine (Turnkey package) (Q3)
Extra Corporeal Shockwave Lithotripter(ESWL) on Turnkey & Buyback Basis (Q3)
Supply, Installation and Commissioning of Diesel Generator on turnkey basis
Supply of Machinery and IT equipment Laboratory on turnkey basis
Creation Of 02 Nos Of 11kv Link Line Eminating From 110kv Sindagi And 02 Nos 11kv Feeder Eminating From 110kv Golgeri For A Distance Of 34 Kms On Taotal Turn Key And Lumsum Basis In Sindagi And Devarhipparagi Sub Division Of O&m Division Indi
Construction Of 3 Nos Of 11kv Link Lines From Existing 33/11 Kv Muss Chalgeri ,33/11 Kv Muss Muddenur & 33/11 Kv Muss Halageri For A Distance Of 13.5 Km In Ranebennur Division On Total Turn Key And Lumpsum Basis(reserved For St Category)
Construction Of 04 Nos Of 11kv Link Lines From 110/11 Kv Muss Ramdurga, 110kv Salahalli, 110kv Katakol And 110kv G Hoskote Sub Stations For A Distance Of 22.9 Km In Ramdurga Sub Division Of Ramdurga Division On Total Turn Key And Lumpsum Basis
Creation Of 02 Nos Of 11kv Link Line Eminating From 110kv Moratagi And 02 Nos 11kv Feeder Eminating From 110kv Aski For A Distance Of 36.00 Kms On Taotal Turn Key And Lumsum Basis In Devarhipparagi And Sindagi Sub Divisions Of O&m Division Indi
Conversion Of Three Pole Structure To Spun Pole At Tulajabhavani 250kva Dtc Tulajabhavani Circle (under Hubli-dharwad Smart City Project Package-2) In Mantur Road Section , Sub-division-2 Of O & M Urban Division, Hescom, Hubli. Under Dcw Scheme On ... Total Turn Key Basis
Construction of 06 nos of 11kV link lines from 33/11 KV Honnutagi Sub stations to NEW Proposed 110/11 KV Hadagali Sub Station for a distance of 17.8 Km in Vijayapur RSD sub division of Vijaypur division on total turn key and lumpsum basis.
Setting up of a conference room facility as a turnkey solution
Turnkey works for Setting up AMRIT Pharmacy at NIMHANS, Bengluru, Karnataka
Establishment of Multi-Skill Development Centre at Kalburagi on turnkey basis
Providing services of Third-Party Quality Assurance (TPQA) for Planning, Designing and Construction of a Hospital project (Civil, E and M and all other works) consisting of 100 Bedded Hospital Building, various Ancillary buildings, 32 nos Staff ... ( EPC ) ... (EPC) basis for ...
Providing additional 1X100KVA Distribution Transformer at Fateshawali Darga near Indipump on F-6, A7 Trunk feeder in Chanakyapuri section of O & M City Sub-Division-2, HESCOM, Hubballi of Urban Division, Hubballi under Partial Turn key & lumpsum basis(1x100KVA Distribution Transformer will be supplied by Departmentally)
Construction Of 39 Nos Of 11kv Link Lines From 110/11kv Bhairunagi, Nimbal, , Atharga And Naad(satalagaon Cross) And 33/11 Kv Tadavalaga Sub Station For A Distance Of 142.9 Km In Chadchan And Indi Sub Division Of Indi Division On Total Turn Key And Lumpsum Basis.
Construction Of 12 Nos Of 11kv Link Lines From 220/11kv Todalabagi, 110/33/11kv Bhutanal And 110/33/11kv Kiadb Sub Stations For A Distance Of 36.9 Km In Babaleshwar And Csd-1 Vijayapur Sub Division Of Vijayapur Division On Total Turn Key And Lumpsum Basis.
Creation Of 02 Nos Of 11kv Link Line Eminating From 110kv Jamakahndi, And 1 No Of Feeder Eminating From 110/11kv Rannabelagali Muss For A Distance Of 15.1 Kms On Taotal Turn Key And Lumsum Basis In Jamakhandi And Mahalingpur Sub Divisions Of O&m Division Jamakhandi
Project Management Consultancy service for the work of Establishment of 6 advanced modern skill laboratories across the Karnataka State including Design, Supply & Installation processes along with required modification/constructions in the existing ... on Turn -Key-Basis ... Turn- Key -Basis
Procurement, Installation & Commissioning of CCTV Surveillance System for URC as Turn Key Project
ESTABLISHMENT OF CENTRE FOR SOLAR OPERATED HYDROPONIC TECHONOLOGY COMPLETE ON TURNKEY BASIS
Construction of A Type School building and 9 Numbers Staff Quarters 4 Numbers Type II 4 Numbers Type III and 1 Number Type V Quarters including Internal water Supply Sanitary Installations IEI works Water supply pump sets LT distribution Street light ... in EPC mode Design ...
Conversion Of Over Head Line To Ab Cable On 9 Mtr Intermediate Supports With An Average Span Of 30 Mtrs Using Aerial Bunched Cables At Gandiwad In O & M City Sub Division-1 Hubballi Of Hubballi Urban Division Under Scp And Tsp Scheme On Total Turn Key...
Conversion Of Over Head Line To Ab Cable On 9 Mtr Intermediate Supports With An Average Span Of 30 Mtrs Using Aerial Bunched Cables In Samudaya Bhavan In O & M City Sub Division-1, Hubballi Of Hubballi Urban Division Under Scp And Tsp Scheme On Total ... Total Turn Key Basis.
Creating Old 11kv Link Line F3 Gola Njy Feeder Ex 11kv Kshetra Njy Double Circuit Line Pole Form Newly Commission 1x10 Mva 110 11kv Power Transformer At Old 110/11kv Muss Kadaganchi,in Kadaganchi Section O&m Sub Division Gescom Kadaganchi Under Link ... Total Turn Key Basis
Creation of necessary Electrical Infrastructure for Providing Street Light/ metering along with Timer Switch under fixed Rate contract on percentage quoting Basis under Partial Turn Key (BESCOM will supply Rabbit ACSR Conductor) in rural areas of 36 feeders of Tiptur sub-division, Tiptur division , Tumkur circle, CTAZ of BESCOM.
Conversion Of Over Head Line To Ab Cable On 9 Mtr Intermidiate Supports With An Average Span Of 40 Mtrs Using Aerial Bunched Cables At Chamundeshwari Nagar In O & M City Sub Division-1, Of Hubballi Urban Division Under Scp And Tsp Scheme On Total ... Total Turn Key Basis
TURNKEY PROJECT FOR REMOVAL OF EXISTING VIDEO SETUP AND SUPPLY, INSTALLATION AND INTEGRATION OF LED
Survey, Investigation, Design, Supply, Installation, Erection, Laying, Construction and Commissioning of Intermediate Pumping Station-1 (IPS-1), and Intermediate Pumping Station-2 (IPS-2), MS pipe Raising main from IPS-1 to IPS-2 and IPS-2 to Master ... on EPC Basis .
Setting up of German Language Laboratory, Training, Assessment and Certification on turnkey basis
SUPPLY & ESTABLISHMENT OF STERILE DEPARTMENT OF RIMS TEACHING HOSPITAL, RAICHUR ON TURNKEY BASIS
Creation Of Of 8 Nos Of 11kv Link Lines From Various Sub Stations To Bifurcate The Load On The Existing Feeder For A Distance Of 29.8 Km In Haveri Sub Division Of Haveri Division On Total Turn Key And Lumpsum Basis In Haveri Sub Division Of O&m Division Haveri
Creation Of 02 Nos Of 11kv Link Line Eminating From 33/11kv Madharkahnadi 1 No From 33/11kv Gani And 1 No Of Feeder From 110/11kv Muss Mundaganur For A Distance Of 17.5 Kms On Total Turn Key And Lumsum Basis In Jamakhandi Sub Division Of O&m Division Jamakhandi
Survey, Investigation, Design, Supply, Installation, Erection, Laying, Construction and Commissioning of Jackwell with pump houses at Cauvery river and Agara Tank, Impounding Reservoirs at Agara and Maddur tanks, MS pipe Raising main from Cauvery ... on EPC Basis (Package-1)
Project Management Consultancy Services for the work of Survey, Investigation, Design, Supply, Installation, Erection, Laying, Construction and Commissioning of Intermediate Pumping Station-1 (IPS-1) and Intermediate Pumping Station-2 (IPS-2), MS ... on EPC Basis (PKG-2).
Project Management Consultancy Services for the work of Survey, Investigation, Design, Supply, Installation, Erection, Laying, Construction & Commissioning of Jackwell with pump houses at Cauvery river & Agara Tank, Impounding Reservoirs at Agara& ... on EPC Basis (PKG-1).
Total turnkey
PROCUREMENT AND MANUFACTURING OF 25 NOS OF VIRAJ- 100 SYSTEMS ON A TURNKEY BASIS
Custom Bid for Services - Conduct of AERO INDIA seminar 2023 event on Turnkey basis
Supply Installation & Commissioning of 2000LPH R.O Plant on Turnkey Basis at RGSSH, RIMS, Raichur
TURNKEY AND OTHER RELATED WORKS FOR LECTURE HALL AND SNCU AUDITORIUM AT GIMS KALABURAGI.
Creation of necessary Electrical Infrastructure for Providing Street Light/ metering along with Timer Switch under item wise unit rate fixed contract on percentage quoting Basis under Partial Turn Key (BESCOM will supply Rabbit ACSR Conductor) in rural areas of 13 feeders of Bangarpete sub-division, KGF division, Kolar circle, BRAZ of BESCOM.
Creation of necessary Electrical Infrastructure for Providing Street Light/ metering along with Timer Switch under item wise unit rate fixed contract on percentage quoting Basis under Partial Turn Key (BESCOM will supply Rabbit ACSR Conductor) in rural areas of 31 feeders of Malur sub-division, KGF division , Kolar circle, BRAZ of BESCOM.
Estimate for bifurcation of F4 Hulihydera IP feeder load to new feeder by providing 11KV link line from existing F4 Hulihydera feeder emanating from 110KV/11KV MUSS Kanakagiri in O&M Kanakagiri section of O&M sub division Gangavathi, under Partial ... Partial Turn Key basis ...