Conversion Of Over Head Line To Ab Cable On 9 Mtr Intermidiate Supports With An Average Span Of 40 Mtrs Using Serial Bunched Cables And Providing Additional 100kva Dtc At Waddar Oni In O & M City Sub Division-1 Of Hubballi Urban Division Under Scp ... Partial Turn Key Basis
Construction Of 17 Nos Of 11kv Link Lines From 110 Kv Morab, 220 Kv Kudachi, 33 Kv Kabbur, 110 Kv Itnal,110 Kv Kudachi And 110 Kv Yalparatti Sub Stations For A Distance Of 75.3 Km In Harugeri And Raibag Sub Divisions In Raibag Division On Total Turn Key...
SUPPLY, INSTALLATION & COMMISSIONING OF MEDICAL GAS PIPELINE SYSTEM O2,VA,AIR AND N2O ALONG WITH OTHER RELATED WORKS ON TURNKEY BASIS
Construction of A Type School Building and 9 Numbers Staff Quarters (4 Numbers Type II, 4 Numbers Type III and 1 Numbers Type V Quarters) including Internal water supply, Sanitary Installations, IEI works, Water supply pump sets, LT distribution, ... in EPC mode (Design ...
Comprehensive strengthening of distribution network using Covered Conductor in Puttur, Division on Total turnkey basis
ESTABLISHMENT OF IMRH/DBMRH INTERMEDIATE AND TAIL GEAR BOX FUNCTIONAL TEST RIG ON TURNKEY BASIS
Supply, Installation, Testing and Commissioning of 40 MT Weigh Bridge on Turnkey Basis at Raichur.
Creation of necessary Electrical Infrastructure for Providing Street Light/ metering along with Timer Switch under item wise unit rate fixed contract on percentage quoting Basis under Partial Turn Key (BESCOM will supply Rabbit ACSR Conductor) in rural areas of 54 feeders of Nelamangala sub-division of Nelamangala division , Bangalore Rural circle of BRAZ BESCOM.
Improvements to 2 No. of Pickups & 4 No. of pickup Canals, Improvements to Kolur LIS under D-13 of RBHLC, Construction of Korlagundhi / Dammur LIS near Dammuru Village in Ballari Tq & Dist Under KMERC Grant. (Including operation and maintenance for a ... on Turn -Key ... Turn- Key Basis)
Engaging agency for Conducting Third party Inspection to Ensure quality, Control & Assurance on behalf of KNNL For work of -Filling up of Additional 14 Nos and Augumentation to 3 Nos of MI/ZP tanks under Dc-4 of Savanur Lift irrigation Scheme ... on turn -Key ... turn- Key basis
Design and Construction of Physics, Maths and Computer Science Department Building (G plus 3) floors for Central University of Karnataka at Kalaburagi, Karnataka including Internal water supply, Sanitary Installations, Drainage, Overhead terrace ... ( EPC ) ... (EPC) basis .
Design, Drawing, Engineering, Procurement and Constructionc (EPC) of Center of Excellence (CoE) for STPI at Jayanagar, Bengaluru, Karnataka.
SUPPLY, INSTALLATION AND COMMISSIONING OF ELECTRICAL ITEMS AND FURNITURES FOR SPORTS MEDICINE COMPLEX ON TURNKEY BASIS
Turnkey works for setting up of Health Emergency Operation Centre at Arogya Soudha building, Bengaluru, Karnataka
ESTABLISHING CSSD EQUIPMENTS AND SERVICES TURNKEY/PACKAGE BASIS IN NEW 450 BEDDED TEACHING HOSPITAL KIMS KOPPAL.
TENDER FOR THE SUPPLY AND INSTALLATION OF MODULAR OT UPGRADATION OF MINOR OT ON TURNKEY BASIS
Creation Of 09 Nos Of 11kv Link Line Eminating From 110kv Mareguddi Muss , 2 No Of 11kv Link Line From 110kv Albal Muss And 2 Nos Of 11kv Link Line From 110 Kv Savalagi Muss For A Distance Of 59.50 Kms On Taotal Turn Key And Lumsum Basis In Jamakhandi Sub Division Of O&m Division Jamakahndi Division
Combined package of 1.Providing additional 1X10 MVA, 110/11 kV Transformer at 110kV Mundagnur sub-station in Bilagi taluk, Bagalkot district. 2. Providing additional 1X10 MVA, 110/11 kV Transformer at 110kV Chimmad sub-station in Rabakavi-Banahatti ... Partial Turn Key Basis.
Renovation and modernization of HVAC system including complete dismantling of existing system and Design, Engineering Supply, Erection, Testing, Commissioning and Handing over of ecofriendly 16.5 TR Package Type AC system(1 working plus 1 standby) ... on turn key basis ...
Consultancy services for Authority Engineer for Upgradation of Bijapur Gulbarga Homnabad section of NH 218 to 2 lane With Paved Shoulders from Km.195.000 to Km.418.000 in the State of Karnataka under NHDP Phase IV executed on EPC mode under O M Phase
e-Tender for Supply and installation of Cloud based turnstile gate on turnkey basis to BMCRC, Ballari
CONSTRUCTION OF COLD STORAGE AND OTHER PARAPHERNALIA AT CHITTAPUR TALUKAOF KALABURAGI DISTRICT IN KARNATAKA ON TURNKEY BASIS
High Velocity Air Fuel convertible to High Velocity Oxy Fuel Coating Facility with Complete Turnkey Systems
SUPPLY, ERECTION, TESTING AND COMMISSIONING OF CENTRE OF EXCELLENCE ON PROTECTED CULTIVATION OF HORTICULTURAL CROPS ON TURN KEY BASIS
Creation of electrical network by creating infrastructure by extending 11kV HT lines, erection of 25KVA, enhancement of 25KVA by 63KVA 1-Star Rated Distribution Transformers and extension of 3 phase 4 wire LT line for energisation of 2099 nos. of ... Total Turn Key and
Comprehensive strengthening of distribution network using Covered Conductor in Kundapura Division of MESCOM jurisdiction on Total turnkey basis
Improvement of electrical infrastructure on Total Turnkey Basis in selected villages of GUNDLUPETE Taluk under Madari Grama Yojane
Improvement of electrical infrastructure on Total Turnkey Basis in selected villages of NAGAMANGALA Taluk under Madari Grama Yojane
Improvement Of Electrical Infrastructure On Total Turnkey Basis Under Unit Rate Basis In Five Villages Of Chamarajanagara Taluk.
Comprehensive strengthening of distribution network using Covered Conductor in Sagar Division of MESCOM jurisdiction on Total turnkey basis.
Improvement Of Electrical Infrastructure On Total Turnkey Basis Under Unit Rate Basis In Five Villages Of Srirangapattana Taluk.
Improvement Of Electrical Infrastructure On Total Turnkey Basis Under Unit Rate Basis In Five Villages Of Periyapattana Taluk.
Improvement of electrical infrastructure on Total Turnkey Basis in selected villages of SRIRANGAPATTANA Taluk under Madari Grama Yojane
Improvement Of Electrical Infrastructure On Total Turnkey Basis Under Unit Rate Basis In Five Villages Of Kollegala Taluk.
Comprehensive strengthening of distribution network using Covered Conductor in Shivamogga Division of MESCOM jurisdiction on Total turnkey basis
Improvement of electrical infrastructure on Total Turnkey Basis in selected villages of NANJANAGUDU Taluk under Madari Grama Yojane
Comprehensive strengthening of distribution network using Covered Conductor in Koppa Division of MESCOM jurisdiction on Total turnkey basis.
Improvement of electrical infrastructure on Total Turnkey Basis in selected villages of K.R.NAGARA Taluk under Madari Grama Yojane
Improvement of electrical infrastructure on Total Turnkey Basis in selected villages of MALAVALLI Taluk under Madari Grama Yojane
Improvement of electrical infrastructure on Total Turnkey Basis in selected villages of ARASIKERE Taluk under Madari Grama Yojane
Improvement of electrical infrastructure on Total Turnkey Basis in selected villages of H.D.KOTE Taluk under Madari Grama Yojane
SUPPLY INSTALLATION TESTING AND COMMISSIONING OF 1600KVA OLTC POWER TRANSFORMER WITH REQUIRED ACCESSORIES ON TURNKEY BASIS AT BEMUL
SUPPLY OF ADVANCED LIFE SUPPORT TRAINING SIMULATOR WITH TRAUMA APPLICATIONS FOR SKILL LAB AT SABVMCRI ON TURNKEY BASIS
Supply, Installation, testing and Commissioning of THERMOFORMING TUB PACKAGING MACHINE for CHIMUL, Mega Dairy, Chikkaballapura on turnkey basis
SUPPLY INSTALLATION & COMMISSIONING OF AUTOMATIC PEDA MOULD MAKING / STAMPING MACHINE ON TURNKEY BASIS AT BEMUL DAIRY-01 NO
Restoration of lift irrigation scheme near Madlapur Village in Manvi Taluk, Raichur district (Madlapur LIS). on Turnkey basis
Creation Of 02 Nos Of 11kv Link Line Eminating From 33kv Hipparagi, 1 No Of 11kv Feeder From 110kv Yaragatti And 01 No 11kv Feeder Eminating From 33kv Jagadal And 1no Of 11kv Line Eminating From 110kv Yargatti For A Distance Of 17.8 Kms On Taotal ... Taotal Turn Key And ...
Replacement of existing HT/LT bare Overhead Conductor with HT covered conductor/LT AB Cable on total turnkey basis in Channapatna Rural Sub-Division of Ramanagara Division of BESCOM Jurisdictions for a period of one year on Total Turnkey percentage quoting Basis
SUPPLY, INSTALLATION AND COMMISSIONING OF 160TR CHILLER -AIR COOLED SCREW CHILLER WITH VFD STARTER UNDER TURNKEY BASIS WITH BUY BACK