Loading…
Loading…
1,538 results • Best match
Providing Electrical infrastructure to the regularized IP sets by extending 11 KV lines, Erection of 25 KVA Star 1 (4 Star) rated Distribution Transformers and Extension of LT line on Partial Turnkey basis (25 KVA Distribution Transformer will be supplied by BESCOM) under PERCENTAGE QUOTING BASIS in BAGEPALLI sub-division of CHIKKABALLAPURA division, BESCOM.
Providing Electrical infrastructure to the regularized IP sets by extending 11 KV lines, Erection of 25 KVA Star 1 (4 Star) rated Distribution Transformers and Extension of LT line on Partial Turnkey basis (25 KVA Distribution Transformer will be supplied by BESCOM) under PERCENTAGE QUOTING BASIS in SATHANUR sub-division of KANAKAPURA division, BESCOM.
Providing Electrical infrastructure to the regularized IP sets by extending 11 KV lines, Erection of 25 KVA Star 1 (4 Star) rated Distribution Transformers and Extension of LT line on Partial Turnkey basis (25 KVA Distribution Transformer will be supplied by BESCOM) under PERCENTAGE QUOTING BASIS in SIRA RSD sub-division of MADHUGIRI division, BESCOM.
Providing Electrical infrastructure to the regularized IP sets by extending 11 KV lines, Erection of 25 KVA Star 1 (4 Star) rated Distribution Transformers and Extension of LT line on Partial Turnkey basis (25 KVA Distribution Transformer will be supplied by BESCOM) under PERCENTAGE QUOTING BASIS in CHINTAMANI RSD sub-division of CHINTAMANI division, BESCOM.
Providing Electrical infrastructure to the regularized IP sets by extending 11 KV lines, Erection of 25 KVA Star 1 (4 Star) rated Distribution Transformers and Extension of LT line on Partial Turnkey basis (25 KVA Distribution Transformer will be supplied by BESCOM) under PERCENTAGE QUOTING BASIS in HOLALKERE sub-division of CHITRADURGA division, BESCOM.
Providing Electrical infrastructure to the regularized IP sets by extending 11 KV lines, Erection of 25 KVA Star 1 (4 Star) rated Distribution Transformers and Extension of LT line on Partial Turnkey basis (25 KVA Distribution Transformer will be supplied by BESCOM) under PERCENTAGE QUOTING BASIS in KUDUR sub-division of MAGADI division, BESCOM.
Providing Electrical infrastructure to the regularized IP sets by extending 11 KV lines, Erection of 25 KVA Star 1 (4 Star) rated Distribution Transformers and Extension of LT line on Partial Turnkey basis (25 KVA Distribution Transformer will be supplied by BESCOM) under PERCENTAGE QUOTING BASIS in GOWRIBIDANUR sub-division of CHIKKABALLAPURA division, BESCOM.
Providing Electrical infrastructure to the regularized IP sets by extending 11 KV lines, Erection of 25 KVA Star 1 (4 Star) rated Distribution Transformers and Extension of LT line on Partial Turnkey basis (25 KVA Distribution Transformer will be supplied by BESCOM) under PERCENTAGE QUOTING BASIS in HOSADURGA sub-division of CHITRADURGA division, BESCOM.
Providing Electrical infrastructure to the regularized IP sets by extending 11 KV lines, Erection of 25 KVA Star 1 (4 Star) rated Distribution Transformers and Extension of LT line on Partial Turnkey basis (25 KVA Distribution Transformer will be supplied by BESCOM) under PERCENTAGE QUOTING BASIS in NANDAGUDI sub-division of HOSAKOTE division, BESCOM.
Providing Electrical infrastructure to the regularized IP sets by extending 11 KV lines, Erection of 25 KVA Star 1 (4 Star) rated Distribution Transformers and Extension of LT line on Partial Turnkey basis (25 KVA Distribution Transformer will be supplied by BESCOM) under PERCENTAGE QUOTING BASIS in KANAKAPURA USD sub-division of KANAKAPURA division, BESCOM.
Providing Electrical Infrastructure to the Regularized IP sets by extending 11 KV line, erection of 25 KVA star 1 (4 star) rated distribution transformers and extension of LT line on Partial Turnkey basis (25 KVA Distribution Transformer will be supplied by BESCOM) under percentage quoting basis in Jagaluru Unit-1 of Jagalur sub division.
Providing Electrical infrastructure to the regularized IP sets by extending 11 KV lines, Erection of 25 KVA Star 1 (4 Star) rated Distribution Transformers and Extension of LT line on Partial Turnkey basis (25 KVA Distribution Transformer will be supplied by BESCOM) under PERCENTAGE QUOTING BASIS in KANAKAPURA RSD sub-division of KANAKAPURA division, BESCOM.
Providing Electrical Infrastructure to the Regularized IP sets by extending 11 KV line, erection of 25 KVA star 1 (4 star) rated distribution transformers and extension of LT line on Partial Turnkey basis (25 KVA Distribution Transformer will be supplied by BESCOM) under percentage quoting basis in O & M-2 section, Harapanahalli sub division.
Establishing 2x5mva 33/11kv Subatation At Khanderayanapalli Village In Sedam Taluka, Kalaburagi District And Construction Of 9.5kms Of 33kv S/c Line By Tapping To The Existing 33kv Mudhol S/s Feeding From 220kv Sedam R/s To Proposed Khanderayanapalli ... Total Turnkey Basis
Re-conditioning of 150MVA CGL make Power Transformer-02 bearing Sl. No BH9256/2 which includes replacement of faulty and damaged 03Nos. of 220kV Bushing and 03Nos of 66kV Bushings and other related works at 220/66kV A Station, pertaining to NRS ... Partial Turnkey Two ...
Providing new 3nos of additional 11kv PCVCB switchgear for load bifurcation at 66/11kv sub-station, Garaga in 220kv RS & SS division, Chitradurga including Supply of Equipments /Materials, Erection (Including Civil Works), Under Partial Turnkey Percentage Tender Basis, (Excluding the Major Materials Such As Switchgears Will Be Supplied by KPTCL) Testing & Commissioning & other allied works
Establishing 2x20 MVA, 66/11KV Sub-Station at Kannegala (Bheemanabeedu) and Construction of proposed 66kV LILO line on 110kV DC Tower using Coyote Conductor from existing 66kV Gundlupete-Hanagala SC line to the proposed 66/11kV Substation at ... Partial Turnkey basis
Providing New 02 Nos of additional 11kV PCVCB switchgear for load bifurcation at 66/11kV Substation Baguru KPTCL, RS & SS Division KPTCL Chitradurga. Including Supply of Equipments /Materials, Erection (Including Civil Works), Under Partial Turnkey Percentage Tender Basis, (Excluding the Major Materials Such. As Switchgears Will Be Supplied by KPTCL) Testing & Commissioning & other allied works
Replacement of 2 x 55MVA, 220/110kV Power Transformer by 2 x 100MVA, 220/110kV Power Transformer at 220kV Esale Sirsi Sub-station in Sirsi Taluk, Uttara Kannada district on Total Turnkey basis including Supply of all Materials/ equipments, Mandatory Spares, Erection (Including dismantling and Civil Works) of all materials/equipments, Testing and Commissioning
Selection of Irrigation Service Provider ISP Contractor for the development of Pressurized Piped Irrigation Network PPIN and provision of irrigation services to 2600.00 Ha in Distributary 54 9R of Tungabhadra Left Bank Canal Taluk Sindhanur, District ... Lumpsum Turn -key ... Turn- key basis.
Supply, Installation, Commissioning and Maintenance of Unified Tapal System for Bangalore Development Authority (BDA) on turnkey basis
SUPPLY AND INSTALLATION OF C-DOT EQUIPMENT FOR PROVIDING WI-FI SOLUTIONS AT BIDAR ON TURNKEY BASIS
Establishing 2x31.5MVA 66/11kV GIS substation at Royal County(Kothnur) near Gottigere, in Uttarahalli Hobli, Bengaluru South Taluk, Bengaluru Urban District alongwith running of 0.145km of 66kV 1000sqmm, DC UG Cable by LILO of existing 66kV 1000Sqmm ... Partial Turnkey Basis ...
Establishing 2x20MVA, 66/11kV Sub-Station at Belthuru (Hunasawadi) in Periyapatna Taluk, Mysuru District alongwith Construction of 3.986km of 66kV LILO Line from one circuit of existing 66kV Kushalanagara-Periyapatna DC line using Coyote conductor to ... Partial Turnkey basis ...
Execution Of System Improvement Works Comprising Ht/lt Reconductoring, 11kv Link Lines, Providing Additional Dtcs And Any Such Similar Ht/lt Line Works On Total Turnkey Basis Under Rate Contract For Rs. 5.00 Crores For A Period Of One Year And Extendable On Satisfactory Performance For One More Year For Another Rs. 5.00 Crores In Chikkamagaluru O&m Division
Providing Electrical infrastructure to the regularized IP sets by extending 11 KV lines, Erection of 25 KVA Star 1 (4 Star) rated Distribution Transformers and Extension of LT line on Partial Turnkey basis (25 KVA Distribution Transformer will be supplied by BESCOM) under PERCENTAGE QUOTING BASIS in TUMKUR RSD-2 sub-division of TUMKUR division, BESCOM.
Providing New Link Line And Intermediate Poles Works In F-1 Alubur Ip Set Feeder , F-2 Sri Anjeynaya Njy Feeder, F-9 Ulavatti Ip Feeder, F-6 Ulavatti Ip Feeder, F-6 Malavi Ip Feeder Of Kogali Section O&m Sub Division H.b.halli In Hb Halli Division ... Total Turnkey Basis ...
Execution Of System Improvement Works Comprising Ht/lt Reconductoring, 11kv Link Lines, Providing Additional Dtcs And Any Such Similar Ht/lt Line Works On Total Turnkey Basis Under Rate Contract For Rs. 5.00 Crores For A Period Of One Year And Extendable On Satisfactory Performance For One More Year For Another Rs. 5.00 Crores In Kadur O&m Division
Replacement Of Existing Bare Ht/lt Overhead Lines Passing Through Elephant Habitats By Ht Covered Conductor/lt Ab Cable For Creating A Safe Corridor For Elephants And Wild Life In Different Locations In Sathanur Sub-div Of Kanakapura Division On Item ... Total Turnkey On ...
Providing Electrical infrastructure to the regularized IP sets by extending 11 KV lines, Erection of 25 KVA Star 1 (4 Star) rated Distribution Transformers and Extension of LT line on Partial Turnkey basis (25 KVA Distribution Transformer will be supplied by BESCOM) under PERCENTAGE QUOTING BASIS in RAMPURA Section, MOLAKALMURU sub-division of HIRIYURU division, BESCOM.
Replacement Of Existing Bare Ht/lt Overhead Lines Passing Through Elephant Habitats By Ht Covered Conductor/lt Ab Cable For Creating A Safe Corridor For Elephants And Wild Life In Different Locations In Kanakapura Rural Sub-div Of Kanakapura Division ... Total Turnkey On ...
Execution Of System Improvement Works Comprising Ht/lt Reconductoring, 11kv Link Lines, Providing Additional Dtcs And Any Such Similar Ht/lt Line Works On Total Turnkey Basis Under Rate Contract For Rs. 5.00 Crores For A Period Of One Year And Extendable On Satisfactory Performance For One More Year For Another Rs. 5.00 Crores In Karkala O&m Division
Execution Of System Improvement Works Comprising Ht/lt Reconductoring, 11kv Link Lines, Providing Additional Dtcs And Any Such Similar Ht/lt Line Works On Total Turnkey Basis Under Rate Contract For Rs. 5.00 Crores For A Period Of One Year And Extendable On Satisfactory Performance For One More Year For Another Rs. 5.00 Crores In Shivamogga O&m Division
Segregation Of Agriculture Load On Existing 11kv Mixed/njy/industrial/rural/town Feeder From 1.f4 Skg Urban Feeder To F2 Yeliyuru Agri Feeder 2.f9 Arehally Njy Feeder To F8 Rathnasandra Agri Feeder 3.f13 Bettapanhalli Njy Feeder To The F10 ... Total Turnkey On ...
Replacement Of Existing Bare Ht/lt Overhead Lines Passing Through Elephant Habitats By Ht Covered Conductor/lt Ab Cable For Creating A Safe Corridor For Elephants And Wild Life In Different Locations In Kanakapura Urban Sub-div Of Kanakapura Division ... Total Turnkey On ...
Execution Of System Improvement Works Comprising Ht/lt Reconductoring, 11kv Link Lines, Providing Additional Dtcs And Any Such Similar Ht/lt Line Works On Total Turnkey Basis Under Rate Contract For Rs. 5.00 Crores For A Period Of One Year And Extendable On Satisfactory Performance For One More Year For Another Rs. 5.00 Crores In Shikaripura O&m Division
Execution Of System Improvement Works Comprising Ht/lt Reconductoring, 11kv Link Lines, Providing Additional Dtcs And Any Such Similar Ht/lt Line Works On Total Turnkey Basis Under Rate Contract For Rs. 5.00 Crores For A Period Of One Year And Extendable On Satisfactory Performance For One More Year For Another Rs. 5.00 Crores In Sagar O&m Division
Combined Package of Establishing 2X20 MVA, 110/11kV Sub-stations at Lakhangaon , Mehkar, Byalahalli , Hulsoor, Chitta along with construction of associated 110 kV LILO line with Lynx conductor in Bidar District on Partial Turnkey Basis including Supply of all matching Materials/Equipments (Excluding Supply of 11kV Switchgear) and Erection (Including Civil Works) of all Materials/ Equipment, Testing and Commissioning.
Replacement of faulty 220KV & 66KV line distance relays, power transformer differential relays and backup relays of 220kV and 66kV by Numerical relays compatible to IEC-61850 protocol at 220/66/11KV SRS Chitradurga on Total Turnkey basis including supply of relays with matching materials, erection, retrofitting, testing, commissioning and releasing of faulty relays as per specifications.
Work For Replacement of damaged conductor & re-arrangement of load of 66KV S/S Guttur & 66KV Harihara-Hosapete sub-station from 66KV Halasabalu line for a distance of about 0.6Km with Coyote ACSR Conductor in Harihara Taluk, Davangere District under ... Total Turnkey Basis, ...
Augmentation of 2x20MVA Power Transformers by 2x31.5MVA 66/11kV Power Transformers and other associated works at 66/11kV Kodigehalli Substation, coming under Operations Division, Nelamangala on Partial Turnkey Basis including supply of all matching materials (Excluding Supply of Power Transformers, NIFES, and 11kV Switchgears)/equipments and erection (including civil works) of all materials/equipments, testing and commissioning
Replacement of age old 90KN & 120KN disc insulators by polymer disc insulators & replacement of faulty jump LYNX ACSR by new jump LYNX ACSR conductor from 220kvBelagavi-110kvVadagaon-110kvNehrunagar-110kvKanbargi-110kvHudli line of MC tower from loc ... Total Turnkey Basis
Filling of 5 BCBs existing between Yarnal BCB to Gotur BCB in Hukkeri taluk of Belagavi District by Lift Irrigation Scheme from Ghataprabha River and Providing Irrigation facilities to the farmers (Phase-1) (Filling of 3 BCBs including operation and ... on TURNKEY BASIS) ...
Availing Services To The Bescom Control Room Located At Centre Of Excellence, Hsr Layout, Bengaluru On Turnkey Basis
Establishing 2x20MVA, 66/11kV Sub-Station at Kudige (Basavantturu) alongwith Construction of 0.826km of 66kV LILO line on 110kV DC towers using Coyote conductor from the existing 66kV EDCIL SC line to proposed 66/11kV Sub-station at Kudige ... Partial Turnkey basis ...
Availing Services to the BESCOM Customer Helpline Centre located at Centre of Excellence HSR layout Bengaluru on turnkey basis
The scope of work comprises drilling of bore well Fresh Drilling 01 No Refreshing of borewells 07 Nos Supply installation testing and commissioning of Submersible pumping system of capacity 7.50 HP capacity of standard brand confirming to relevant IS ... on Turnkey basis. ...
Establishing 2X20MVA, 66/11kV Sub-station at Vasanthanagara and Construction of proposed 66kV LILO line on 110KV DC Narrow Based Towers from existing 66kV Vajamangala-Devnur Line to the proposed 66/11kV Vasanthanagar Substation for a distance of 0.08 ... Partial Turnkey Basis ...
Comprehensive Strengthening Of Ht/lt Distribution Network In Kushalanagara Sub Division, Madikeri Division, Kodagu (madikeri) District On Total Turnkey Basis.
Comprehensive Strengthening Of Ht/lt Distribution Network In Madikeri Sub Division, Madikeri Division, Kodagu (madikeri) District On Total Turnkey Basis.