Loading…
Loading…
1,532 results • Best match
Widening of existing road to 2 lane with Paved Shoulders from km 15.980 (Megaravalli) to km 30.750 (Agumbe) of NH-169A on Thirthahalli- Malpe section in the state of Karnataka on EPC mode (Job No. NH-169A-KNT-2021-22-948)
Widening to two lane with paved shoulders from design Km. 410.600 Existing Km. 413.740 to design Km. 441.900 Existing Km. 447.610 of Hiriyur-Huliyar Section of NH 150A in the State of Karnataka on EPC Mode under Annual Plan 2021-22
Construction of VUP Talkere Hand Post KA 02 057, LVUP Agrahara Junction KA 02 273 and VUP Tippasandra Hand Post KA 02 015 of MORTH Identified Black Spots on Devihalli Hassan section of NH75 to be executed on EPC mode
Permanent Rectification of Blackspot KA 02 345 by Constructing Vehicular Overpass VOP with Retaining wall at Chainage Km.374.200 and Service Road Chainage Km.374.000 Km. 375.600 on NH66 at KPT junction in the State of Karnataka under EPC mode
CS For AE for Supervision of Construction of 4 lane realignment of Old NH207 (New NH648) From TN/KA Border (Ch 0.000) To Hoskote (Ch 20.900) under BMP as a part of Bangalore Ring Road in Karnataka on EPC Mode
CS for AE for supervision of construction of 2Lanes With or Without Paved Shoulders From Km 0.000 To Km 69.480 Of Sanquelim To Belagavi Section Of NH748AA in the state of Goa and Karnataka under Bharatmala Pariyojana on EPC mode
CS for AE for Supervision of Improvement-Upgradation of Existing Two Lane Bypass to 6-laning from Km.403.100 (Design Ch.402.600) to Km.433.000 (Design Ch.433.200) of Hubli-Dharwad Bypass section of NH-48 in Karnataka on EPC mode
Construction of Staff Training Centre along with branch and Currency Chest including all civill and E & M services and Development of sites & builk services for Punjab National Bank, Peenya Industrial area, Bangaluru, Karnataka in EPC mode ( Design and Build Basis)
Improvement and Upgradation of Existing 2-Lane Bypass to 6-Laning from Km. 403.100 (Design Ch. 402.600)-Km.433.000 (Design Ch.433.200) of Hubli-Dharwad Bypass section of NH-48 (Old NH-4) in Karnataka to be executed on EPC Mode
Construction of New Toll Plaza (12 lane) including Administrative building and other works at Kunimellihalli Km.347.180 of Chitradurga Davanagere Haveri Hubli section of NH-48 in the state of Karnataka on EPC Mode (for NHIT Eastern Projects Pvt. Ltd)
Construction of Maski Bypass Starts at existing Km 144.22 and ends at existing Km 151.760 and Sindhanur Bypass Starts at existing Km 168.37 and ends at existing Km 180.8 on NH 150A in the State of Karnataka on EPC mode
Project Management Consultancy Services for the work of Design & Construction of Working Womens Hostel Buildings including maintenance of buildings for 1 year under EPC contract at Narasapura Industrial Area, Kolar Taluk & District.
Providing permanent restoration to valley side slips occurred during monsoon of 2019 20 by soil nailing with tie back system to RCC retaining walls from Km 86.200 to 99.200 Charmadi ghat of NH 73 old NH-234, Mangalore Tumkur section on EPC Mode
Periodical Renewal from Km 16.80 to Km 17.850 Km 18.45 to Km 41.8 Km 42.050 to Km 42.850 Km 43.15 to Km 47.9 Km 49.325 to Km 57.3 of NH 207 Sarjapur Hosakote Section in the State of Karnataka on EPC mode
Consultancy Services For Authority Engineer For Supervision Of Widening to 2 lane with paved shoulder from Km 0000 to Km 102310 Design Chainage of NH 548B ie Murrum Maharashtra border IB circle Bijapur Section in the State of Karnataka on EPC mode
Construction of four lane ROB at km 22.80 2L Major Bridge at Km 24.60 on NH-150 across Kagina River including approaches from km 22.60 to km 25.17 of NH-150 in Kalaburagi district in the state of Karnataka on EPC mode
Widening to 4 Lane PS from Km 347.500 Intersection with NH 48 at Km 116.800 Near Sira to Km 367.700 Near Badavanahalli including bypass to Sira town of NH 69 in the state of Karnataka on EPC mode under Annual Plan 2024 25
Installation and Commissioning of 5 Nos of High Mast Lighting in the Project Four Laning of Hubli Hospet Section of NH 67 from Km.128.850 to Km.272.571 143.721 total length in the state of Karnataka on EPC mode under NHDP Phase IVB
Construction of LVUP at Nangali cross at Ch 220.770 and provision of PUP at Ch 220.380 in the approach portion of Black spot in the stretch of Mulbagal AP KNT Border Section of NH 75 in the State of Karnataka under EPC mode
Construction of LVUP at Noolvi cross at Km 397.540 of Six Laning of Hubli Haveri section from km 340.000 to km 403.400 of NH48 Old NH4 in the State of Karnataka under Standalone mode in the Annual road safety Plan under EPC mode
Consultancy Services for AE for supervision of 6-laning with access control from km 29.435 to km 74.168 of Neelmangala-Tumkur including Tumkur bypass section of NH-48 (Old NH-4) in the State of Karnataka on EPC mode under Bharatmala Pariyo
Providing One Time Improvement from Km. 0.000 to Km. 1.527 and Km. 91.468 to Km. 92.080 in Holenarasipura Town Limit of NH-373 Belur to Bilikere Section in the State of Karnataka To Reduce Congestion in H.N.Pura Town Limit on EPC Mode
Widening of existing 2 lane to 4 lane with paved shoulder from Km 25 15 to 56 70 except Km 52 70 to 53 50 of NH 169 Nellisara camp to Thirthahalli Shimoga Mangalore section in the State of Karnataka on EPC mode
Four laning of Honnavar Port Connectivity rd Kasarkod side of Honnavar Port towards NH 66 connecting Honnavar Port with NH 66 at Km 196.00 and to improve NH 66 to integrate port connectivity road on EPC mode under BMP Ph 1 in Karnataka
Planning, Designing and construction Multidisciplinary Research Centre (MRC) (Basement plus G plus 2) at RIE, Mysore including internal water supply, sanitary installations, Civil external service connections, internal electrical installations, ... on Engineering , ... Engineering, Procurement and Construction (EPC) ... ( EPC ) ... (EPC) Mode -I.
Package 2 Supply, Installation, Commissioning with Quality Test Report, and Operation and Maintenance of the whole of pure Drinking Water Distribution/ Dispensing Plant/ unit of Capacity 500 LPH Product water on single Phase power supply for a Period ... on Turnkey /EPC ... Turnkey/ EPC Basis for ...
Package 4 Supply, Installation, Commissioning with Quality Test Report, and Operation and Maintenance of the whole of pure Drinking Water Distribution/ Dispensing Plant/ unit of Capacity 500 LPH Product water on single Phase power supply for a Period ... on Turnkey /EPC ... Turnkey/ EPC Basis for ...
Package 3 Supply, Installation, Commissioning with Quality Test Report, and Operation and Maintenance of the whole of pure Drinking Water Distribution/ Dispensing Plant/ unit of Capacity 500 LPH Product water on single Phase power supply for a Period ... on Turnkey /EPC ... Turnkey/ EPC Basis for ...
Supply, Installation, Commissioning with Quality Test Report, and Operation and Maintenance of the whole of pure Drinking Water Distribution/ Dispensing Plant/ unit of Capacity 500 LPH Product water on single Phase power supply for a Period of 1 ... on Turnkey /EPC ... Turnkey/ EPC Basis for ...
4-laning of Bangalore-Mangalore Section from km 270.270 (Periya Shanthi) to km 318.755 (Bantwal) including 6-lane Flyover at Kalladka Town in km. 311-km. 314 on NH-75 on EPC Basis in Karnataka
Widening to Two Lane with Paved Shoulder from Km 105.00 to 110.838 of NH 544DD Anantpur Molkalmuru section in the State of Karnataka on EPC Basis Contract. Job no. NH 544DD KNT 2020 21 922
TENDER FOR SUPPLY, INSTALLATION AND COMMISSIONING OF 3 NOs. OF SECTIONAL WARPING MACHINE WITH CREEL, ON TURN KEY BASIS
Project Management Consultancy Services for the work of Design & Construction of Working Womens Hostel Buildings including maintenance of buildings for 1 year under EPC contract at Residential Layout, Vasanthanarasapura Industrial Area, Tumakuru Taluk & District
Detailed Engineering Procurement and Construction of Roofing Shed to the Railway lines in the Marshalling yard at New Mangalore Port Authority Mangalore
Widening to 4 lane from Km 51.600 to 76.200 Hebri to Parkala and from km 85.200 To 88.900 Karavali Junction to Malpe of Thirthahalli Udupi Malpe Section of NH169A in the State of Karnataka on EPC mode Job No NH169A KNT 2021 22 927
Construction of Balance work of 2 Laning with Paved Shoulder from Km 30.800 to Km 70.800 and 2 Laning without Paved Shoulder with Rigid Carriageway from Km 70.800 to Karnataka-Goa Border km 84.120 of NH-4A in the State of Karnataka on EPC mode
CS for AE for Supervision of Construction of 6-laning from Belgaum to Sankeshwar Bypass from Km.515.000-Km.555.017 (Package-I) and Sankeshwar to MH-KNT Bypass from Km.555.017-Km.592.853 of NH-48 in Karnataka under BMP (Package-II) on EPC mode
Construction of LVUP at Ajjagondanahalli at grade Junction Ch.82.410 KA 02 466 and Nelahal at grade Junction Ch.91.000 KA 02 175 Under road safety for rectification of Block spot of Tumkur Chitradurga from Km 75.00 to 189.000 of NH 48 Under EPC Mode
Widening to Four Lane with Paved Shoulders from Design Chainage Km 27.78 SH Chainage Km 459.5 to Km 57.32 SH Chainage Km. 489.04 Belur Hassan section of NH 373 in the State of Karnataka in EPC mode JOB No NH 373 KNT 2022 23 988
Reconductoring of 19 Nos of 11KV lines for a distance of 52.99RKm in Ron Division on total turn key basis.
Tender for Supply Installation Testing and Commissioning of 1250 KVA DG Set with accessories at BEMUL on Turn Key Basis
Construction of New Academic Blook G 4 at NIF Campus at HSR Layout Bangalore SH a building portion including sanitary installation, external service connections drainage internal CC roads, storm water drais with covers kerb stones rain water ... in EPC mode Design ... in EPC mode Design ...
Request for Proposal (RFP) for appointment of Authority Engineer for providing project management services for (1) Tumkur-Chitradurga-Davanagere New Line Project - Construction of New BG Line between Chainage 66/400 & Chainage 90/000 (23.60 Km) ... ( EPC ) ... (EPC) mode . ... ( EPC ) ... (EPC) mode .
Package 1- Supply, Installation, Commissioning with Quality Test Report, and Operation and Maintenance of the whole of pure Drinking Water Distribution/ Dispensing Plant/ unit of Capacity 500 LPH Product water on single Phase power supply for a ... on Turnkey /EPC ... Turnkey/ EPC Basis for ...
Reconductoring of 81nos of 11KV lines for a distance of 380.53RKms in Dharwad Urban & Rural Division on Total turn key basis.
Reconductoring of 06 Nos of 11KV lines for a distance of 36.1 RKms in Haveri division on Total turn key basis.
Reconductoring of 25 Nos of 11KV lines for a distance of 205.51 RKm in Karwar Division on total turn key basis.
Widening from Existing Intermediate Lane to Four Lane in Sringeri Town limits from Km.110.00 to 115.00 (Old Km.640.00 to 645.00) of NH-169 (Old No.13) on Shivamogga Mangalore Section in the state of Karnataka on EPC mode. (Job No.NH-169-KNT-2020-21-
Consultancy service for Authority Engineer for supervision of Construction of 4 lane ROB and its approaches in lieu of existing Level Crossing No.48 E at km.66.900 on NH-50 Railway Chainage 96/6-7 Near Naubad in the state of Karnataka on EPC Mode
Construction of 4 Lane ROB in lieu LC No 47 at Rly Km 49 600 700 NH Design Ch 673 000 between Nanjangud Town NTW and Chamarajanagar CMNR stations near Panyada Hundi on Mysore Chamaraj Nagar section of NH150A in the state of Karnataka in EPC mode