Loading…
Loading…
127 results • Best match
TURNKEY CT SCAN 32 SLICE FOR CHURACHANDPUR
Modular Operation Room with turnkey works (Q3)
Modular Operation Theatre with turnkey works (Q3)
Modular Operation Room on Turnkey Works (Q3)
Construction of 4-Lane Bridge over Irang River on Imphal- Jiribam road section (95.500Km) NH-37 (Old NH-53) in the State of Manipur on EPC mode under NH(O)
Digital Subtraction Angiography Unit (Single Plane) on Turnkey Basis
Eye Bank with Equipment and Accessories on Turnkey basis
Restoration and Rehabilitation of Ukhrul to Nagaland Border via Jessami road for km 63.00 to Km 126.00 (Length 63km) NH-150 in the State of Manipur on EPC mode-4th Call
Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Km 0.000 to Km 13.747 in the State of Manipur EPC mode under Bharatmala
Restoration/Rehabilitation of Churachandpur Tipaimukh road on NH02 Old NH150 from Km 185 to Km 262 Total Length 77 Km in the State of Manipur in FY2025 26 on EPC mode
Consultancy services for AE for Supervision of Improvement of existing road to 2 laning with Hard Shoulders of Maram-Peren section (Package-III) in the State of Manipur on EPC Mode
CS for AE for Supervision of Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B (PKG-3) in the State of Manipur on EPC mode
Consultancy services for Authoritys Engineer for Supervision of Construction of two lane with paved shoulders road of Tamenglong to Muhur in the state of Manipur (PKG-1,2,3 and 4) on EPC mode
Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Km 13.747 to Km 32.835 in the State of Manipur on EPC mode under Bharatmala
Mobile C-Arm with Flat Panel Detector with Turnkey basis
Emergent Maintenance work of the existing road of the project Construction of 4Lane Bridge over Irang River on Imphal-Jiribam road section 95.5Km NH37 on EPC mode at the Risk Cost of the EPC Contractor on Percentage Rate and work Order Basis 3rd Call
Consultancy Services as AE for Supervision of Construction of two lane with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur (Package-5 and 6) on EPC mode.
Widening and Improvement of Imphal-Moreh section of NH-39 from Km 395.680 to Km 406.000 toTwo (2) lane with paved shoulders configuration in the State of Manipur (Package-3) on EPC mode
Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Design Chainage 69.875 km to 88.980 Km (PKG-3A) in the State of Manipur EPC mode.
Restoration/Rehabilitation of Churachandpur Tipaimukh road NH 02 Old NH 150from Km 9.00 to Km 70.00 Total Length 61.00 Km in the State of Manipur in FY 2025 26 on EPC mode 2nd Call
Widening/Improvement to 2 (Two) lane with earthen shoulder of Marrem Khullen to Jessami section of NH-202 of Imphal - Ukhrul - Jessami Economic Corridor (Package-6) in the State of Manipur on EPC mode
Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Km 118.850 to Km 130.000 (Package-4A) in the State of Manipur on EPC mode under Bharatmala
Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Km 130.000 to Km 141.029 (Package-4B) in the State of Manipur on EPC mode under Bharatmala
Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Km 48.587 to Km 69.875 (Package-2B) in the State of Manipur on EPC mode under Bharatmala
Construction of Two laning with Hard shoulder road of Ukhrul - Toloi - Tadubi section of NH-102A from Design Chainage 50.850 Km to 81.870 Km (Package 3) in the State of Manipur on EPC mode
Construction of two lane with paved shoulders road from Tamenglong to Muhur in the state of Manipur from km 0.000 at Tamenglong to km 10.000 near Dialong (Length - 10.00km) (PKG-1) on EPC mode
Widening to 2 (Two) Lane with Hard shoulder of Churachandpur to Tuivai section of NH 102B from Km 32.835 to Km 48.587 (Package-2A) in the State of Manipur on EPC mode under Bharatmala
Widening and Improvement of Imphal-Moreh section of NH-39 from Km 406.000 to Km 425.411 to Two (2) lane with paved shoulders configuration in the State of Manipur (Package-4) on EPC mode
Widening Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Assam starting near Jiri River (Assam/Manipur Border (Package - 7) on EPC mode. (Length-19.68 km).
Widening to 2 (Two) Lane with Hard shoulder road of Ukhrul - Toloi -Tadubi section of NH-102A from Design Chainage km 9.450 to km 50.850 (Package-2) in the State of Manipur on EPC mode
Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 3.275 km to 15.940 Km (Total length 12.665 Km) (PKG-1) in Manipur on EPC mode.
Balance work of Widening to 2 (Two) lane with hard shoulder of Churachandpur to Tuivai section of NH-102B from km 130.000 to km 141.029 (Package- 4B) in the State of Manipur on EPC Mode
Construction of two lane with paved shoulders road of Tamenglong Mahur section in the state of Manipur from km 20.500 at Old Tamenglong to km 30.800 ending near Phelong (Length-10.3km) (PKG-3) on EPC mode
Consultancy Services as AE for Supervision of widening to 2 (Two) -lane with paved shoulder of Imphal to Jiribam section of NH-37 ( PKG-IV,V,VI,VII) in the state of Manipur on EPC mode
Consultancy Services for AE for Supervision of Construction of Two lanning with Hard Shoulder Road of Ukhrul - Toloi - Tadbui section of NH-102A from (Package-3 and 4) in the State of Manipur on EPC Mode
Construction of Moreh Bypass to Two Lane with paved shoulder from Km 421.950 to Km 425.411 (Length 2.52 Km) on NH39 near Indo-Myanmar border in the State of Manipur on EPC mode under NH (O
Construction of two lane with paved shoulders road of Tamenglong Mahur section in the state of Manipur from km 30.800 at Phelong to km 41.450 ending near Azuram (Length-10. 65km) (PKG-4) on EPC mode
Strengthening of Ukhrul to Choithar section of NH-202 from existing km 50.520 to km 59.230 (Design Chainage km 45.600 to km 54.212) in the State of Manipur on EPC mode. (Package-4, Length-8.612 km)
Construction of Two laning with Hard shoulder road of Ukhrul - Toloi - Tadubi section of NH-102A from Design Chainage 50.850 Km to 81.870 Km (Package 3) in the State of Manipur on EPC mode - 2nd Call.
Widening Improvement to 2-lane with earthen shoulder of Finch Corner to Ukhrul section from existing km 34.650 to km 50.520 of NH-202 in the State of Manipur on EPC mode. (Package-3, Length-14.63 km)
Balance work of Widening to 2 (Two) lane with hard shoulder of Churachandpur to Tuivai section of NH-102B from Design Chainage km 118.850 to km 132.037 (Package 4A) in the State of Manipur on EPC Mode
32 Slice CT Scanner with Virtual Autopsy Software & Hardware Solutions with Turnkey Basis
CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF (i) Construction of two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) in the State of Manipur starting from km 54.180 (Package-5 and 6) on EPC mode.
Improvement/Up-gradation of existing 2-Lane road to 4-Lane Divided Highway from Sekmai to Nilkhuthi(Pkg5B) of Imphal Kohima Road (Design Chainage from Km 297.700 to Km 308.460) of NH-39 in Manipur on EPC Mode.
Improvement of existing road to 2 laning with Hard Shoulders of Maram-Peren section (Package-IB, length- 17.660 Km) from Design Chainage 22.340 Km to Km 40.000 on NH-129A in the State of Manipur on EPC mode
Improvement of existing road to 2 laning with Hard Shoulders of Maram-Peren section (Package-IA, length- 22.340 Km) from Design Chainage 0.000 km to 22.340 Km on NH-129A in the State of Manipur on EPC Mode
Widening to 2 (Two) Lane with Paved shoulder of Imphal to Jiribam section of NH-37 from Design Chainage 15.940 km to 33.120 Km (Total length 17.180 Km) (PKG-2) in the State of Manipur on EPC mode
CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF (i) Widening /Improvement to 2 Lane with Earthen Shoulder of Yaingangpokpi-Finch Corner Section from km 0.00 to km 30.970 of NH 202 in the State of Manipur on EPC mode.
Consultancy Services as AE for Supervision of Widening and Upgradation to two lanes with paved shoulders road from Tamenglong to Mahur (NH-137) (Package - 7 and 8) on EPC mode in the State of Assam under NH(O)-NE.
Installation of 2x5MVA, 33/11KV Sub Station at RIMS Campus, Imphal on turnkey basis.