Loading…
Loading…
362 results • Best match
Widening and upgradation of 200 feet wide PR-7 road from JLPL Sector-82 to NH-64, S.A.S Nagar on EPC Mode including five years of maintenance (Civil and Public Health Works)
Appointment of Safety Consultant for Sanchore - Santalpur Section (km 4.888 km 130.073) of NH-754K Amritsar Jamnagar Economic Corridor in the State of Gujarat on EPC Mode Pkg-1,2,3,4 Total Length- 125.185 km
Construction of 2 lanes ROB over L C NO S 53 T 2 at CH 50 665 of NH 703A Jalandhar Kapurthala Sultanpur Lodhi Makhu in the State of Punjab on EPC Mode
providing Road safety and flood damage repair from Km 54 00 to 60 800 on Jalandhar Kapurthala Sultanpur Lodhi Dadwindi Lohian Makhu Road NH 703A in the state of Punjab on EPC Mode
Construction of Four Lane LVUP alongwith approaches between existing Km 172.500 to km 174.000 on Barnala-Bathinda section of old NH-64 (New NH-07) in the State of Punjab on EPC Mode
Design Construction Testing Commissioning and Operation and Maintenance of Infrastructure Works at Rajpura Patiala Industrial node in Punjab under Amritsar Kolkata Industrial Corridor Project On EPC Basis
Comprehensive Planning Designing Construction Furniture IT Networking and Maintenance during defect liability period Under EPC Contract Mode of 100 bedded PGI Satellite Centre at Ferozepur Punjab
Construction of 4 lane viaduct at the junction of Ring Road with Bathinda-Tapa section of NH-07 at Km. 212.700 in Bathinda of NH-07 in the state of Punjab on EPC Mode.
Strengthening of Existing 2-Lane 4-Lane road with paved shoulders of NH-254 from KM 82.400 to 104.200 KM from Rampura to Maur in the State of Punjab (21.80 km) on EPC Mode.
Construction of LVUP near Dakoha railway crossing at Jalandhar City on old NH 01 (New NH 44) at Km 370.100 including entry/exit and other related works in State of Punjab on EPC mode
Construction of Underpass at Sohal Town on Pathankot-Amritsar Section of NH-15 from Km.6.082 to Km.108.502 at Ch. 43.500 under Rectification of Blackspot in the State of Punjab on EPC mode
Construction of 4 lane LVUP at Dhakoli Junction (on Zirakpur Parwanoo road) at Km 39.784 on Ambala-Chandigarh section of old NH-22 (New NH-152) in the State of Punjab on EPC mode
CONSTRUCTION OF AQUEDUCT OVER SUKHRAL KHAD AND ADJOINING NALLAH INCLUDING CONSTRUCTION OF BARREL,FLAIR IN and FLAIR OUT WALLS and PROTECTION WORK FROM RD 265.8M TO 819.0M OF PROPOSED RAVI CANAL ON EPC MODE
Procurement of CT Scan 128 Slices on Turn-Key Basis for Punjab Institute of Liver and Biliary Sciences, Phase-3B1, SAS Nagar (Mohali), Punjab.
Widening and Strengthening of NH 148B from km. 226.370 to km. 234.900 i.e. from Tohana Haryana Border to Moonak Jakhal excluding stretch from km. 233.830 to km. 234.300 on EPC Mode in State of Punjab
Construction of LVUP Design Ch.117.920, LVUP and other related works on Panipat-Jalandhar section of old NH-1 (new NH 44) from Km 96.000 to 387.100 in the State of Haryana on EPC Mode
Construction of 2 lane service road alongwith Retaining Wall at Patiala-Sanaur Junction existing VUP km 54.702 on Patiala Bypass section of NH-64 New NH 07 in the State of Punjab in EPC Mode
STRENGTHENING AND ROAD SAFETY OF PATHANKOT TO KULLU ROAD UPTO MAMUN CHOWK FROM KM 0 000 TO 5 550 FOUR LANE SECTION OF NH 154 IN DISTT PATHANKOT PUNJAB FOR YEAR 2021 2022 ON EPC MODE
Consultancy Services for Supervision Consultants of New NH-354 section from Khemkaran to start of Amritsar Bypass from Km 22.673 to Km 71.496 for length of 48.822 Km on EPC mode in the State of Punjab
Replacement of od design damaged border security fence to new design fence at various locations in Punjab sector along Indo-Pakistan Border (Length of - 134.561 km). SH: Replacement of old/damaged existing border security fence with new design ... in Engineering Procurement and Construction (EPC) ... ( EPC ) ... (EPC) mode -III. ...
Construction of Steel Truss Bridge at Km. 1.700, 2.450, 3.300 and 3.900 over Sidhwan Canal on 4-lane (Partial Access Controlled) Laddowal Bypass from Km 0.000 to Km 17.041 in the State of Punjab on EPC mode
Const. of Double loop dumbbell Interchange at the Junc. of NH52 HR n RJ Border Barwala and NH9 Delhi Sirsa at Dhandhoor in Haryana as part of Amritsar Kolkata Industrial Corridor under NH O on EPC mode
CS for AE for Supervision of Constr of 4lane Greenfield DelhiAmritsar Katra Expway from Junction with PatialaSamana Patran Rd SH10 near Ghagga to Junction with LudhianaMalerkotla Rd SH11 near Bhogiwal on EPC mode under BMP in Punjab
Construction of 4 lane VUP at Bhankarpur junction at Km 33.275 on Ambala-Chandigarh section of Old NH-22 (New NH-152) in the State of Punjab on EPC basis
Development of Memmadpur (Ambala) - Banur (IT City Chowk) - Kharar (Chandigarh) Corridor under Bharatmala Pariyojana - Package-II - 6 laning of IT City Chowk to Kurali Chandigarh Road (Design length 31.23 Km) in the state of Punjab on EPC mode
Rehabilitation and Upgradation of Hoshiarpur to Una up to PB HP border section of NH503A to 2lane paved shoulder configuration including 4lane Hoshiarpur Bypass(from Design Ch2.425 to Design Ch30.348) in Punjab(PckgIV) on EPC mode under NH
Construction of four/six lane Greenfield connectivity from Talwara Jattan Village on NH44 to Gobindsar village on Delhi Amritsar - Katra Expressway from km 0.000 to km 12.345 (Pathankot Link Road) in Punjab on EPC Mode under NH(O)
PR Work from Km. 226.370 to 236.600, Km. 239.400 to 241.500 and Km. 243.300 to 244.750 road section of Tohana in Haryana Border to Moonak-Jakhal-Budhlada of NH-148-B on EPC mode in the state of Punjab
Construction of 6 - lane elevated structure extension in Rayya at km. 420.070 on Jalandhar-Amritsar section of NH-03 with service road on both sides including approach for rectification of blackspot in the State of Punjab on EPC mode.
Construction of Minor Bridges on MCW and SR at Km.115.830, FOB and Approach Road etc. from Km 115.300 to 116.300 on Panipat-Jalandhar section of NH-1 (new NH-44) in the State of Haryana on EPC mode
CS for AE for Supervision of Construction of 4lane Greenfield Delhi AmritsarKatra Expway from Junction with Ludhiana Malerkotla Rd SH11 near Bhogiwal to Junction with Jalandhar Moga Rd NH703 near Kang Sahibu on EPC mode under BMP in Punjab
Widening and Reconstruction of existing Two Lane Carriageway to Four Lane with Paved Shoulder in Makhu Town from km. 170.000 to km. 171.900 including ROB at km. 171.387 of NH-54 in the State of Punjab on EPC mode.
Rehabilitation and augmentation of New NH-354 of section Amritsar (airport junction) to Ramdas from km ASR 100.835 to km 139.965 for Length of 39.130 km into Four-Lane under Bharatmala scheme in Punjab (Package-IV) under EPC Mode
Construction of 6 lane Flyover at km 417.374 and 6 lane VUP at km 416.700 including construction of new service road on Jalandhar-Amritsar section of NH-01 for rectification of Blackspots in State of Punjab on EPC mode
Rejuvenation of Badi Nadi and Chotti Nadi construction of STPs and ETP and laying of Sewer Network at Patiala on EPC basis including O and M for a period of 5 Years
CONSTRUCTION OF FOUR/SIX LANE GREENFIELD LUDHIANA-RUPNAGAR NH-205K FROM JUNCTION WITH NE-5 VILLAGE NEAR MANEWAL LUDHIANA TO JUNCTION WITH NH-205 NEAR BHEORA VILLAGE RUPNAGAR INCL SPUR TO KHARAR WITH LUDHIANA BYPASS IN PUNJAB ON EPC MODE
Periodic Renewal of existing road from km 12 720 to km 23 400 of NH 703A under National Highways Division PWD B and R Jalandhar in the State of Punjab for the year 2021 2022 10 68 KM on EPC Mode
Authority Engineer for Supervision of Rehabilitation and augmentation of New NH354 of Amritsar (airport junction) to Ramdas from km ASR 100.835 to km 139.965 for Length of 39.130 km into Four Lane under Bharatmala in Punjab (PackageIV) in EPC Mode
CS for AE for Supervision of Development of Memmadpur Ambala Banur IT City Chowk Kharar Chandigarh Corridor under BMP Pkg-II 6 laning of IT City Chowk to Kurali Chandigarh Road Design length 31.23 Km in Punjab on EPC mode
CS for AE for Supervision of 4Laning of Amritsar Bypass Greenfield Alignment from New Tarn Taran Rd to Ajnala Rd and Upgradation of existing Amritsar Khemkaran Rd NH354 to 4Lane Configuration Pkg 3 in Punjab under BMP on EPC mode
Construction of 4 lane VUP at km 39.960, flyover at km 40.320 and km 46.630 between km 39.300 to km 47.170 in Kurali-Kiratpur section of old NH-21 (new NH-205) in the State of Punjab on EPC Mode
Construction 4lane Greenfield Amritsar connectivity of Amritsar with Delhi-Amritsar-Katra Exp. from Jun. with Kapurthala-Sultanpur Lodhi road (NH-703A) Isharwal village ch.24.000 to MDR Jun. at ch.40.900 Dhunda Village on EPC mode under BMP in Punjab
Construction of 6 lane Elevated highway at km 414 at Beas at km 438.850 at Jandiyala including VUP at km 432.300 at Chouhan and flyover at km 425.880 at Khilchanon on Amritsar Jalandhar section of old NH01 on EPC mode
Engineering procurement and construction (EPC) for supply erection and commissioning of New Ethanol distillery plant with 120 KLPD (alongwith slop fired Co-generation Plant of 5.65 MW Power in the existing campus
Strengthening of Jalandhar Kapurthala Sultanpur Lodhi Lohian Makhu road from Km 0 00 to 0 715 Km1 88 to 4 040 and From Km 37 680 to Km 48 490 section of NH 703A in the State of Punjab on EPC Mode
CS for AE for Supervision of Development of 6-lane access control highway of Bareilly-Ludhiana EC under BMP from Ranipur Barsi Saharanpur district to Sadopur Ambala district Ch.45.500-121.786 of Shamli Ambala section in Haryana on EPC Mode (PKG-II)
Construction of 6-lane access controlled Greenfield highway from km 125.000 to 150.000 of Deogarh-Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar EC in Rajasthan on EPC mode under BM (Ph-I) (AJ/DRGB-Package-6)
Construction of new MNB on Main Carriageway at km 462.087 on Old NH01 (New NH03) near Loharka crossing, MNB on Service Road including dismantling of old bridge, service road at RHS and concrete crash barrier with friction slab at RHS on EPC mode
Construction Widening of Structures i.e MJB MNB ROBs LVUP etc rectification of drainage and rain cuts and other works on Panipat Jalandhar sec of old NH1(new NH44)from Km96.000 to 387.100 in the State of Haryana and Punjab on EPC Mode.
CS for AE for Supervision of Development of 6-lane access control highway of Bareilly-Ludhiana EC under BMP from Gogwan Jalalpur to Ranipur Barsi (from Ch.(000.600) to 45.500) of Shamli Ambala section in Uttar Pradesh on EPC Mode (Package-I)