Loading…
Loading…
362 results • Best match
Development of Shadipur Colony of Delhi Transport Corporation (DTC) in Delhi on Design, Engineering, Procurement and Construction (EPC) basis
Construction of Centre of Advance Studies at Hindu College, University of Delhi on Design, Engineering, Procurement and construction (EPC) basis
Engineering, Procurement and Construction(EPC) of PGIMER Satellite Centre at Ferozepur, Punjab, a 100 Bedded Hospital with allied services and facilities.
Construction of Water Resources Museum at Ropar Head Works on EPC Mode
Replacement of old design damaged border security fence to new design fence at various locations in Punjab Sector along Indo-Pakistan Border (Length of - 134.561 km) SH:- Replacement of old/damaged existing border security fence with new design ... in Engineering Procurement and Construction (EPC) ... ( EPC ) ... (EPC) mode -III. ... in Engineering Procurement and Construction (EPC) ... ( EPC ) ... (EPC) mode -III
Replacement of Old design damaged border security fence to new design fence at various locations in Punjab Sector along Indo-Pakistan Border (Length of-134.561 Km). SH: Replacement of old/damaged existing border security fence with new design fencing ... in Engineering Procurement and Construction (EPC) ... ( EPC ) ... (EPC) mode -III
Construction of Permanent Campus of JNV at Charai Deo, Assam on EPC Mode-II Basis
Development of Sports Hub at Burlton Park Area, Jalandhar on EPC Mode under Jalandhar Smart City
Replacement of 400 Mtr. 8 Lanes Synthetic Athletic Track-1 at NSNIS, Patiala (Punjab) on EPC Mode
Replacement of Old design damaged border security fence to new design fence at various locations in Punjab Sector along Indo-Pakistan Border (Length of - 134.561 Km) SH: Replacement of old/damaged existing border security fence with new design ... in Engineering Procurement and Construction (EPC) ... ( EPC ) ... (EPC) mode -III. ...
CE CHZ PAT T 17 2022 23 DESIGN AND CONSTRUCTION OF KLP ACCOMODATION AT SANGRUR ON EPC MODE
Design and Construction of Interim Airport Terminal Building at Halwara IAF Station (EPC Mode) Distt. Ludhiana (Lump-Sum Basis)
Replacement of Old design damaged border security fence to new design fence at various locations in Punjab Sector along Indo-Pakistan Border (Length of 134.561 Km) SH: Replacement of old/damaged existing border security fence with new design fencing ... in Engineering Procurement and Construction (EPC) ... ( EPC ) ... (EPC) mode -III. ...
Replacement of Old design damaged border security fence to new design fence at various locations in Punjab Sector along Indo-Pakistan Border (Length of 134.561 Km) SH: Replacement of old/damaged existing border security fence with new design fence at ... in Engineering Procurement and Construction (EPC) ... ( EPC ) ... (EPC) mode -III. ...
Re-Development of Jalandhar City Railway Station on JUC-ASR section of Firozpur Division of Northern Railway on EPC mode
Construction and Commissioning of Chandigarh-Baddi New Broad Gauge Railway Line 30.295 km (Ch.-2219 m to 28076m including P-Way but excluding Electrification and Signaling and Telecommunication works on (EPC) Mode
Construction of toll plaza at km 175.900 on Ramdas-Gurdaspur section of NH-354 in the State of Punjab on EPC mode.
CONSTRUCTION OF INTERNAL ROADS, ESTATE PUBLIC HEALTH SERVICES AND CAMPUS LIGHTING INTERIM AIRPORT TERMINAL AT HALWARA IAF STATION EPC MODE DISTT LUDHIANA PUNJAB
Construction of Interchange Loop with underpass at Beas on Amritsar- Jalandhar section of NH-03 in the State of Punjab on EPC Mode
Replacement of Old design damaged border security fence to new design fence at various locations in Punjab Sector along Indo-Pakistan Border (Length of - 134.561 Km). SH: Replacement of old/damaged existing border security fence with new design ... in Engineering Procurement and Construction (EPC) ... ( EPC ) ... (EPC) mode -III. ...
Strengthening of 32.200 Km section of Phagwara Hoshiarpur ( Km 0 to 32.200 ) on NH 344 B in the state of Punjab on EPC mode
Engagement of user fee agency on the basis of CB through etender for Karahewala Fee Plaza in the State of Punjab on EPC Mode
Construction of National Sports University including Multipurpose Sports Hall, Administration and Academic Block, Faculty Residences and Civic Amenities at Koutruk, Imphal, Manipur State on Design, Engineering, Procurement and Construction (on EPC) ... EPC) basis .
Replacement of Old design damaged border security fence to new design fence at various locations in Punjab Sector along Indo-Pakistan Border (Length of 134.561 Km.) SH: Replacement of old /damaged existing border security fence with new design ... in Engineering Procurement and construction (EPC) ... ( EPC ) ... (EPC) mode -III. ...
CONSTRUCTION OF INTERNAL ROADS ESTATE PUBLIC HEALTH SERVICES AND CAMPUS LIGHTING INTERIM AIRPORT TERMINAL AT HALWARA IAF STATION EPC MODE DISTT LUDHIANA PUNJAB BALANCE WORK
Development of 4by6 lane Mohali to Sirhind Greenfield Highway Section Design length 27.370 Km under Bharatmala Pariyojana in the State of Punjab on EPC mode
Installation of LED Lights and Centralized control and Mandatory System (CCMS) on EPC mode with O and M for 5 years Maintenance for Municipal Corporation Jalandhar
Construction of VUP, Service road at km.17.325 in village Behram on Phagwara-Rupnagar section of NH-344A in the State of Punjab on EPC Mode
Construction of Academic building for Faculty of Technology at North Campus, University of Delhi on Design, Engineering, Procurement & construction (EPC) basis-Pkg-1
Road Safety of Jalandhar Hoshiarpur Manali Road NH 70 New NH 03 from Km 49 200 to 58 85 in the State of Punjab on EPC mode
Construction of 4 lane flyover at Tehna Junction on Harike-Faridkot-Bathinda section of NH-54 at Km. 225.272 in the State of Punjab on EPC Mode
Strengthening of Pathankot - Banikhet road upto Katori Bangla (Himachal Pradesh Boundary) from Km 0.000 to 39.360 of NH-154A in the State of Punjab on EPC Mode.
The work for Strengthening of Phagwara-Nawanshahar-Ropar road from Km. 81.900 to 88.00 in Ropar City of NH-344A in the State of Punjab on EPC Mode.
Construction of 45m wide approach road from NH-44 to IMC Rajpura (5.56 Km length) including one number dual carriage way HL Truss bridge (Civil Works) - EPC mode
Construction of Civil Works of 2 no Switchyard of 220 KV for Power House No 1 and Power House No 2 and their allied Works on EPC mode
Construction of flyover at km 233.110 on Dogal Kalan to Punjab-Haryana Border Section on NH-71 (new NH-52) in the State of Punjab on EPC Mode
Works Of Implementing Smart LED Street Lights And Centralized Control and Monitoring System on EPC Mode with Operation And Maintenance Of 5 Years In Municipal Corporation Amritsar, Amritsar Under Smart City Mission
Replacement of Old design damaged border security fence to new design fence at various locations in Punjab Sector along Indo-Pakistan Border (Length of -134.561 KM). SH: Replacement of Old/damaged existing border security fence with new design ... in Engineering Procurement and construction (EPC) ... ( EPC ) ... (EPC) mode -III. ...
Construction of Inter-disciplinary Academic, Administrative and Research building for Institution of Eminence at Maurice Nagar, University of Delhi on Design, Engineering, Procurement & Construction (EPC) basis
Construction of Vehicular Underpasses (VUPs) at Ch. 317.520 and Ch. 321.600 and Widening and Strengthening of Service road of NH-44 in the State of Punjab on EPC Mode.
Consultancy services for Authority Engineer for Supervision of Development of 4by6 lane Mohali to Sirhind Greenfield Highway Design length 27.370 Km under Bharatmala Pariyojana in Punjab on EPC mode
Construction of 4L PS Sri Muktsar Sahib bypass from existing Km 269.960 of NH-354 to existing km 39.280 of NH 754 on EPC mode in the state of Punjab
supply installation and commissioning of GCMS MS on turn key basis
supply installation and commissioning of LCMS MS on turn key basis
Supply installation and commissioning of ICP MS on turn key basis
Construction of Civil Works of 2 No Fire fighting tanks and Sub surface Pump House for Power House No 1and Power House No 2 and their allied Works on EPC mode
Replacement of Old Design damaged border security fence to new design fence at various locations in Punjab Sector along Indo-Pakistan Border (Length of - 134.561). SH: Replacement of old/damaged existing border security fence with new design fencing ... in Engineering Procurement and Construction (EPC) ... ( EPC ) ... (EPC) mode III. ...
Periodic Renewal of Abohar Fazilka road from Km.24.560 to 42.560 of NH-07 under NH Division, Abohar in the State of Punjab for the year 2021-22 (18km) on EPC mode
Construction of 6-Lane Elevated Structure at Km 462.160 at Loharka including balance Work of Approaches on Amritsar Wagah Border Section of NH-03 in the State of Punjab on EPC Mode
Construction of Dadwindi realignment starting from existing Km 36 250 and terminating at existing Km 38 650 including 2 lane ROB on NH 703A on EPC mode in the State of Punjab