Loading…
Loading…
25,857 results • Best match
CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF 6-lane Urban Extension Road UER 2 NH 344 M From Karala-Kanjhawala Road, Km 150.000 to Dwarka Sector 24 Road, Km 38.111 till Bahadurgarh bypass of NH-10 near Bahadurgarh in Haryana ON EPC Mode
Construction/Shifting of Sewer Pipeline at Vill. Daudpura, Algon Kothi to Chung, Sursingh, Chabal Distt. Tarn Taran of Sec. Khemkaran Town to start of Amritsar Bypass from Km. 22.673 to Km. 71.496 in the state of Punjab on EPC Mode Pkg-II
Construction of service road on both side of 4-lane Varanasi bypass from Km 0.00 (starting point at Km 271.300 of NH-56) to Km 15.250 (end point at Km 11.170 of NH-29) in the state of Uttar Pradesh on EPC mode
Providing and laying of 33 KV HT Electrical line for Power Supply from 33 KV Mannur Industrial Feeder fed from 110/33 KV Sriperumbuthur Sub Station to MMLP Chennai at Mappedu, Tiruvallur District in the State of Tamil Nadu on EPC Mode
Consultancy Services for AE for supervision of 6-laning with access control from km 29.435 to km 74.168 of Neelmangala-Tumkur including Tumkur bypass section of NH-48 (Old NH-4) in the State of Karnataka on EPC mode under Bharatmala Pariyo
AE for Supervision of Development and Upgradation of 4lane AC Expressway from Km 530.000 to Km 545.300 (Sidhra to Ban Vill Sec of NH44) of Delhi Amritsar Katra Expressway on EPC Mode under BMP in the UT of JnK (Ph2-Package XVIII)
Construction of 1 Nos ROB 2 Nos VUPs Service roads provision of lighting and construction of other miscellaneous works at various stretches on section of NH-4 from AP/Tamil Nadu Border (Km. 134.890) to Nalagampalli village (Km.172.000) under EPC mode
Construction of VUP at Km 226.160 at Nipana T-Point and Flyover at Km. 240.660 Appu T-Point near Akola MIDC in stretch of Kurankhed to Shelad Amravati - Chikhali Pkg. 2 section of NH-53 in the State of Maharashtra on EPC Mode
Construction of 6L Flyover at the Junction of Nilam Hotel (Ch261.500) ,Chalthan Chokdi (Ch263.400) and Service road at Palod (Ch235.600) for Rectification of Blackspots on Vadodara-Surat Section Of NH-8 (New NH-48) in the State of Gujarat on EPC Mode
Consultancy Services for AE for SC of 8-lane access controlled Greenfield Delhi-Vadodara Expressway at Junction with MDR-1 (Baonli-Jhalai road) to Major Bridge on Mej River (Ch.247.310-Ch.331.030) in the State of Rajasthan on EPC mode under BMP
DESIGN AND CONSTRUCTION OF 40 MTR SPAN MAJ PMT BRIDGE AT KM 23.5 OVER ANGROPANI NALLAH AND 35 MTR SPAN MAJ PMT BRIDGE AT KM 27.75 OVER AVAPANI NALLAH ON OPEN FOUNDATION WITH STEEL SUPERSTRUCTURE IN ARUNACHAL PRADESH STATE IN EPC MODE
Construction of 6 Lane Flyover(1x25.1x30.1x25) at Km.21.076 (Ghatkesar Junction of MoRTH identified Blackspot TG 03 187) and LVUP (12mx4m) at Km.21.890 (Ghattumaisamma Junction) on Hyderabad to Yadgiri Section of NH 163 in the State of TS on EPC Mode
SUB SOIL INVESTIGATION, DESIGN, DRG AND CONSTR OF 80 M SPAN MAJOR PMT SHERE THAPA BRIDGE OVER ISMI-SIKO NALLAH INCLUDING APPROACH ROADS AT KM 0.630 ON ROAD TCC-MAZA THROUGH EPC MODE UNDER 128 RCC / 23 BRTF/PROJECT ARUNANK IN ARUNACHAL PRADESH.
Work of Widening to Four Lane rigid pavement configuration from Km 90.00 to Km 100.800 on NH-96 (Km 42.0 to Km 53.300 as per new NH-330),design length of 11.300 km under EPC mode in the state of Uttar Pradesh
RFP for Construction of 4 lane divided carriageway with paved shoulders from km 0.000 (Km. 144.200 of NH-15(NewNH-68) to km 21.042 (Km. 160.700 of NH-15(New NH-68) Barmer Bypass on EPC mode on in the State of Rajasthan.
Reconstruction Widening Strengthening of Belhe Shirur from Single Lane Intermediate Lane and Two lane to Two lane with paved Shoulders of NH-761 from Design Ch. Km 0.000 to KM 37.970 Design length 37.970 Km in the State of Maharashtra on EPC Mode
Widening and Strengthening to 2 lane with paved shoulders from Km. 8.0 Design Ch. Km 7.870 to 25.0 Design Ch. Km 24.890 of Sironcha to Mahadevpur Section of NH 353C in the State of Telangana under Annual Plan 2021-22 on EPC Mode
Construction of (i) Connecting road from Z-Morh Tunnel to Zojila Tunnel and (ii) 14.150 km long bi-directional tunnel across Zojila Pass on Sonamarg-Kargil section of NH-01 on EPC mode in the Union Territories of Jand K and Ladakh
Providing One Time Improvement from Km. 0.000 to Km. 1.527 and Km. 91.468 to Km. 92.080 in Holenarasipura Town Limit of NH-373 Belur to Bilikere Section in the State of Karnataka To Reduce Congestion in H.N.Pura Town Limit on EPC Mode
Construction of 2 lane ROB with approaches in lieu of existing LC No.119 at Km 226/80 of NH205 (New NH71) under setu Bharatam in the state of Andhra Pradesh under NH(O) for the year 2021-22 on EPC Mode.
Widening to 2- Lane with Paved Shoulder including replacement of Culverts and Bridges from km 0.00 to km 44.00 (Kuru to Ghaghra Section) of NH-143A in the state of Jharkhand on EPC Mode (Job No.-NH-143A-JHR-2019-20/286)
Rehabilitation and up-gradation of existing road from 2 lane to 2 lane with paved shoulders from Km 0 000 to Km 53 590 53.590 Km of Rayachoty to Vempalli section of NH 440 in the State of Andhra Pradesh on EPC mode
RFP for the Construction of Gilaula bypass with two lane with paved shoulder configuration starts near km. 281.930 of NH-730 and ends near Km. 284.900 of NH-730 (Design length- 3.510 km) on EPC mode in the State of Uttar Pradesh.
CONSTRUCTION OF FOUR LANE PARALI BYEPASS (MISSING LINK) ON DEOGAON PHATA -PATHRI-INJEGAON-PARALI- AMBAJOGAI-LATUR-AUSA-OMERGA ROAD NH-548B IN BETWEEN KM 2/700 TO 6/829 AND ROB AT CH3/485 IN THE STATE OF MAHARASHTRA on EPC mode
Strengthening/Reconstruction of road from Km 30.400(Sunderpahari) to Km 57.450(Dharampur More) of NH-333A under NH Division Deoghar in the state of Jharkhand for the year 2020-21(27.05Km) on EPC mode.(JOB NO-NH-333A-JHR-2020-21-293).
Rehabilitation and Upgradation of Existing two Lane Road to 4Lane With Paved Shoulders from km 32 00 to km 79 650 Puttaparthi Koduru Section of NH342 in Sri Satyasai District in the State of AP on EPC Mode under Annual Plan 2022 23
Providing and fixing of THRIE metal beam crash barrier at accident prone areas from Km 16.000 to 55.000 and Improvement widening of junction in Km 52 and Km 54 on NH-334A under Road safety Annual Plan 2022-23 on EPC mode
Improvement to two lane with paved shoulder of Sarwan-Chakai upto NH-333 from Km 0.000 to Km 15.972 Total length 15.972 km of NH 333C on EPC mode in the State of Bihar Job No- NH-333C-BR-2022-2023-72
Rehabilitation Upgradation of Newly Declared National Highway Somayajulapalli Dhone Road of NH 340B from Km.0.0 To 56.200 Design Ch. Km 0.00 to km 53.33 to two lane with paved shoulders in Kurnool District in the State Of Andhra Pradesh on EPC Mode
Reconstruction of Minor Bridges at Km 99.800 to Km 100.600, Km 98.400 to 98.800 (GeedamNalla ) and Major Bridge at Km 59.000 To 59.600 (Guter Nalla) on NH-30 (Old NH-221) Jagdalpur-Sukma-Konta Road in the State of Chhattisgarh on EPC Mode.
Strengthening and Improvement of Road Safety of Hyderabad Bhupalapatnam section of NH163 from km 215.0 to 231.0, km 236.0 to km 247.0, km 294.6 to km 307.3 in the state of Telangana under Annual Plan 2021 22 on EPC mode under NHO TSP
Rebuilding of Existing 2 Lane ROB (RHS) to 3 Lane ROB at Railway Km.102 / 3-4 Crossing the NH - 44 Chainage 86/200-300 Near Divitipally Village on Hyderabad - Bangalore section of NH-44 in the state of Telangana on EPC Mode
Consultancy services for AE for supervision of Rehabilitation and Up-gradation to 2LPS of Kalyan - Murbad - Malshej Ghat - Nirmal Road NH-61 from km 37-850 to km 57-900 (Murbad to Kadampada section) in the State of Maharashtra on EPC Mode.
Construction of New Double Tier 4-lane Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from km 0.342 to Km 20.223 on EPC mode under Bharatmala Pariyojana in the State of Tamil Nadu-Package-I (km 0.342 to Km 4.604)
Construction of New Double Tier 4-lane Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from km 0.342 to Km 20.223 on EPC Mode under Bharatmala Pariyojana in the State of Tamil Nadu-Package-II (km 4.604 to Km 9.700)
Construction of four lane Flyover with service road at junction of NH-58E with NH-48 under Annual plan 2021-22 of road safety in the State of Rajasthan on EPC Mode for permanent rectification of black spot ID no. RJ-02/282
4-laning of Balwara to Dhangaon section of NH-347BG-753L (Indore to Boregaon-Pkg III) Design Ch.42.260-Existing Ch.45.000 to Design Ch.82.810-Existing Ch.86.00 (Length 40.35 Km) under Bharatmala Pariyojana Phase-I in Madhya Pradesh on EPC mode
Planning Designing and obtaining all local body approvals and Construction of Lecture hall complex 2 G plus 1 consisting of all Civil E and M works and Services as per conceptual plan and development of BIM models on EPC mode IISER BHOPAL
Upgradation and construction of Ambua to MP/Gujrat Border road section of NH-56 Total length 27.59km to 2 Lane with paved shoulder configuration along with one time improvement in 5.88 km length in the State of Madhya Pradesh on EPC Mode
Rehabilitation and Up-gradation to 2 Lane with paved shoulder configuration for the work of Charthana Jintur section of NH 752 I from Design Km.25 100 to 47 100 Design Length 22 00 Km in the State of Maharashtra on EPC Mode
Construction of Service Road and Slip In / Slip Out Roads along with allied drain works on the 4-lane stretch of NH-44, from the MP/MH Border covering the Kamptee - Kanhan and Nagpur Bypass in the State of Maharashtra on EPC Mode
Construction of 6 lane VUP at Km 168.535 including construction of New Service Road, Exit and Entry, drain and Highway Lighting on Rectification of black spot at Hisar Cantt. Location From 167.810 to 169.445 in the state of Haryana on EPC Mode
Upgradation of Highway starting from junction with NH-44 at Panipat connecting Kairana Shamli Muzaffarnagar Miranpur Bijnor and terminating at its junction with NH-74 at Kotawali to 2-4 lane configuration in State of UP on EPC Mode Pkg-III NH-709AD
Balance works of 4-laning of Rampur-Kathgodam section of NH-87 (New NH No. 09) from Km 0.000 (Km 190.000 of NH-24) to Km 42.791 (design Chainage Km 43.446) (Package-I) in the state of Uttar Pradesh on EPC Mode
WID IMPVT OF RD DDM BET KM 53 TO KM 92.25 DESIGN CHAINAGE KM 51.015 TO 87.74 DESIGN LENGTH 36.725 KM FROM CL 09 TO NHDL SPECN UNDER 105 RCC 761 TF IN AOR OF PROJECT BMK IN AP ON EPC MODE
C/o. Office Block (Basement plus GF 2 storey) with one more floor provision at later date on EPC Mode-I basis at IDBI College at Gachibowli, Hyderabad. SH: Providing services of attender and computer operator for HYD-III/4 Sub-division.
construction of centre for disability sport at gwalior mp SH : construction of inddor sport complex hostel bldg out door sports aquatic centre and site development including all services and development work on EPC mode contingecies SH : pdg. services of hired vehicle for gwalior
S S I DESIGN DRAWING AND CONSTRUCTION OF 80 MTR SPAN MAJOR PERMANENT SHERE THAPA BRIDGE OVER ISMI SIKO NALLAH INCLUDING APPROACH RD AT KM 0.630 ON ROAD TCC MAZA THROUGH EPC MODE UNDER 128 RCC 23 TF P ANK IN A. P
Consultancy services for preparation of Detailed Project Report for widening and strengthening to 2-lane with paved shoulder from intermediate lane of NH-516E from km 16.000 to 28.800 of Rajamahendravaram to Rampachodavaram in the State of Andhra ... on EPC mode
CONSTRUCTION ON EPC MODE OF EXISTING ROAD TO NHDL SPEC WITH PAVED SHOULDER FROM EXISTING KM 67 (MANGAN) TO KM 95 (CHUNGTHANG) OF TOTAL DESIGN LENGTH 27.476 KM ON ROAD G-M-C IN THE STATE OF SIKKIM UNDER PROJECT SWASTIK OF BRO