Loading…
Loading…
25,857 results • Best match
CS for AE for supervision for the projects Construction of Agra Bypass connecting 174.500-km141.000 of Yamuna Expressways Construction of leftout portion of Agra Inner Ring Road connecting village Deori (CH 0) to NH-44 (CH. 7.772) in UP on EPC mode.
CS for AE for Supervision of Construction of 2lane with Paved Shoulder or 4laning of Harda Betul sec of NH47 from Temagaon Ch. km 30.000 to Chicholi Ch. km 80.952 (length 50.952 km) (Harda Betul Pkg2) in Madhya Pradesh on EPC Mode
Permanent Rectification of 5 Nos. of Blackspots (TN-02-665, TN-02-565, TN-02-566, TN-02-504 and TN-02-084) in Tuticorin to Tirunelveli section of NH-138 (Old NH-7A) in the State of Tamil Nadu on EPC mode
Construction of approaches to ROB at Km.51/700 (159-A and B at Km.55/6-10 between Singaperumalkoil and Paranur Stations) in the Tambaram Tindivanam section of NH-32 (Old NH 45) in the state of Tamil Nadu on EPC Mode.
Const of underpass VUP LVUP SVUP for long term mitigation measure on potential BS loca from Bhonga Kheda to Suktara sec of NH44 at km 593.950 VUP 610.360 VUP 615.920 VUP 621.140 VUP n under Road Safety in MP on EPC Mode
Improvement and strengthening of existing 2 Lane stretch to 2 Lane Paved Shoulder (1.5 m BHS) on Ghoti-Sinnar section of NH-160A from Km.0.000 to Km.53.500 using Thin White topping (200 mm thick) the State of Maharashtra on EPC Mode
Rehabilitation and Upgradation of kolde kalamba to visarwadi NH-6 Nandurbar State Highway design ch. Km 50.200 to km 56.800 62.400 to 100.400 NH Section NH752-G to two lane with paved shoulder 4 Lane in the state of Maharashtra on EPC Mode.
Construction of 2Lane with Paved shoulder of Hinotiya to Mehluwa from Design Km 27.000 (of existing SH 19 Km 26.530) near Hinotiya Village near Mehulwa village Sec of NH 346 Vidisha Talbehat of length 48.700 kms in MP (Package 2) on EPC Mode.
Construction of 2 nos of FOBs with Ramps at Km.11600 Collectorate Baghpat and at Km 32000 Kendriya Vidyalaya, Baoli of NH709B in the stretch from EPE Crossing to start of Shamli Bypass in the state of Uttar Pradesh on EPC mode
Construction of additional structures at i Warvand Ch 59 000 ii Patas Ch 66 350 and iii Khadaki Ch 90 300 on Pune Solapur NH 65 from km 40 000 to km 150 050 in the state of Maharashtra on EPC Mode
Construction of 6 lane Greenfield corridor from Ramnagar to Kacchi Dargah NH119D (from Km 109.700 to Km 122.300) including widening of the existing NH31 (from Km 196.700 to Km 198.600) as part of the Amas Darbhanga highway in Bihar on EPC Mode
SC Services during O-M of 4-laning of Ghaghra Bridge to Varanasi section of NH-233 from Km.121.800-Km.180.420 (Package-1) from Ghaghra Bridge Abutment on Basti side to Bhudanpur Urban section in UPunder NHDP Phase-IV on EPC mode.
CS for AE for Supervision of (a)existing km 88.400 (Savali Vihir)-km 163.400 (start of Ahmednagar bypass) and (b)4-lane Elevated structure (flyover) from Sakkar Chowk to SB Chowk on Pune-Aurangabad road along NH-222 in Maharashtra on EPC mode
Engagement of user fee collection agency on the basis of CB through Shrishikalan FP at Km 193.600 for Rehabilitation and up gradation from km 178.00 to km 215.00 of NH-76 to 2 lane with paved shoulder on EPC mode in Uttar Pradesh
Construction of Box Structures at Km 833 250 Bhumkar Chowk Narhe Km 857 500 Tathawade and Km 859 140 Punawale on Pune Satara Section from Km 725 000 to Km 865 350 of NH 48 in the State of Maharashtra on EPC Mode
Design and Re Construction of Major Bridge at Mula River including approaches at Km 853 556 LHS MCW and Superstructure of VUP at KM 862 180 BHS of Pune Satara Section of NH 48 in the State of Maharashtra on EPC Mode
Design and Construction of Minor Bridge over Irrigation Canal at Km 50.795 on Slip Road along with construction of RHS Slip Road and Highway lighting on various sections of Kodebad-Dhamtari Project of NH-30 in the State of Chhattisgarh on EPC Mode.
CS for AE for Supervision of Construction of 4 lane access-controlled highway from Samarlakota to Achampeta Junction (from km. 0.000 to Km. 12.250) as a part of Kakinada port to NH-16 connectivity in AP on EPC mode under Bharatmala Pariyojana
Permanent Rectification of Black Spot TN(02)189, TN(02)406, TN(02)079 by Constructing VUP at Orrappam Km.8.617 with Service Road extended upto Chettipalli at Km. 9.850, LVUP at Kandhikuppam Km.11.720 on Krishnagiri to Walajahpet section on EPC mode
RFP for Balance work of NH 66 from design Km 84.000 to Km 87.100 (Indapur Bypass) and Km 91.600 to Km 99.100 (Mangaon Bypass) to four-lane with paved shoulder in the State of Maharashtra under NH(O) on EPC Mode (Length10.60 Km)
Upgradation of port connectivity NH configuration from existing 2-lane-4-lane road from Achhampeta junction (NH-216) to Kakinada anchorage port connecting Vakalpudi light house (from Ch.0.0 to Ch.13.198) in the state of AP on EPC Mode under BMP
CS for AE of 4-Laning of Pangare-Waranga Phata section from Km134.500-Km174.645 of NH-161 including Bypasses at Kalamnuri and Akhada Balapur and lengths of 800m from Waranga Junction to Nanded and 700m road from Waranga in Maharashtra on EPC mode
Engagement of user fee collection agency on the basis of CB through e-tender for Bolangir FP for Widening/ strengthening of existing IL/DL to 2L.1.5m PS from Km.0.00 to Km.45.750 of NH-57 on EPC mode in Odisha
Four laning of existing 2-4 lane stretch from Lonand (Design km 166.400) to Dive Ghat (Design km 220.900) (54.500 km) of Mohol-Alandi section (PKG-V) of NH-965 in the State of Maharashtra to be executed on EPC Mode under BMP
CS for AE for Supervision of Development of 6 lane access controlled highway of Ganeshpur Dehradun section of NH-72A under BP from Design Chainage 0 (Ganeshpur) to Design Chainage Km 19.785 in up and Uttarakhand on EPC mode under BP (Phase-I)
Permanent Rectification of 5 Nos. of Blackspots (TN-(03)-091, TN-(02)-568, TN-(02)-506, TN-(02)-728 and TN-(02)-049) in Madurai to Tuticorin section of NH-38 (Old NH-45B) in the State of Tamil Nadu on EPC mode
Development of Six lane green field Ring Road-bypasses Package-I Sachendi-Mandhana Road start from Design Ch.0.000 to Design Ch.23.325 (Length 23.325) kms around Kanpur District in the state of Uttar Pradesh under NHDP Phase-VII on EPC mode
Permanent Rectification of Black Spot TN-02-110 by constructing a Small Vehicular Underpass (SVUP) (1x7m x 4.5m) at Km.175.550 (Iruvelpattu Junction) in Tindivanam Ulundurpet section of NH-45 (New No.NH-38) in the State of Tamil Nadu on EPC mode
Const. of 2lane with paved shoulders bypass to Mungrabadshapur town start near Kodahu at Km 47.225 of NH319D and ending near Nauwadandi at Km 218.880 of NH31 Ch.Km 0.00 to Km 4.335 L 4.335Km under NH O in Uttar Pradesh on EPC mode
Construction and Site for Improvement of existing 4 Lane National Highway Old NH22 (New NH-5) on Zirakpur Parwanoo section from Km 42.350 to Km 43.850 including 2nos.VUP at Km 43.051 and Km 43.286 in the State of Haryana on EPC Mode
Construction of 4 Lane Flyover from MES College Junction to Bogmalo Junction on NH566 from km 7.106 to km 10.460 and 4 Lane VUP at Queeny Nagar Junction from km 3.330 to km 4.550 on EPC Mode in the State of Goa.
Construction of New Double Tier 4-lane Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from km 0.342 to Km 20.223 on EPC Mode under Bharatmala Pariyojana in the State of Tamil Nadu- Package-III (km 9.700 to Km 14.185)
CS for AE for, 1. Development of 6Lane greenfield Ring Road(Pckg-I) starts from Ch. 0.000 to Ch 23.325(L-23.325kms) around Kanpur City in UP on EPC mode. 2. Development of 6Lane greenfield Ring Road(Pckg-IV) starts from Ch68.650 t
Consultancy Services for AE for Supervision of Construction of Six lane Bhandara Bypass Section of NH-53 (Old NH-06) from km 485.000 (Design km 485.000) to km 499.545 (Design km 499.800) under BMP in the state of Maharashtra on EPC mode
Construction of Additional Spans (30 metre each) at Km.185.920 (Gangrar) on 6L of Gulabpura Chittorgarh section of NH 48 (Km. 90.000 to km. 214.870) for Rectification of 01 No. Black Spot identified by MoRTH in the state of Rajasthan on EPC Mode
Constr. of 6lane elevated flyover inclu. reconst rehab of exist pavement from Km 426.230 to Km 430.500 at Nirsa in the Barwa Adda Panagarh sec of NH19 Km.398.240 to Km.521.120 inclu Panagarh Bypass in Jharkhand on EPC Mode under NH(O)
Construction of new 4 lane Prayagraj Southern Greenfield Bypass from design km.43.200 (near Mahuari) to design km.50.860 (near Nababa urf Nibi Kala Uparhar) (design length 7.660 km) PKG-2 under Ph-I on NH19 in UP under Bharatmala on EPC mode.
Development of six lane access control greenfield highway of Delhi-Saharanpur-Dehradun EC under BMP from Design Chainage 0.000 (Aksardham NH-9 (old NH-24)) to Design Chainage 14.750 (Delhi-UP Border) in the state of Delhi (Package-1) on EPC mode
CS for AE for Supervision of Improvement of 4 lane to 6 lane road (Public Road) and Construction of 4 lane dedicated Port Road for the Port Connectivity Road from Convent Junc. to Sheela Nagar Junc. in Andhra Pradesh on EPC Mode
Construction of Bal Works (i)Pedestrian Underpass at Km.514.960 including approaches, service road, (ii) Bus lay bay, bus shelter, (iii) Drain on BHS (iv) Junction at Km.514.960 on 4-laned Wardha-Butibori section of NH-361 in Maharashtra on EPC Mode
Authority Engineer for Construction of new 4 lane Prayagraj Southern Bypass from km. 43.200-km. 50.860 (near Nababa urf Nibi Kala Uparhar) (length 7.660 km) Package-2 under Phase-I on NH-19 in the state of UP under Bharatmala on EPC mode
CS for AE for Supervision of Development of 6-lane access control highway of Bareilly-Ludhiana EC under BMP from Gogwan Jalalpur to Ranipur Barsi (from Ch.(000.600) to 45.500) of Shamli Ambala section in Uttar Pradesh on EPC Mode (Package-I)
Construction of LVUP at Nangali cross at Ch 220.770 and provision of PUP at Ch 220.380 in the approach portion of Black spot in the stretch of Mulbagal AP KNT Border Section of NH 75 in the State of Karnataka under EPC mode
Const of 6L EC at Pigdambar Chauraha Km14.235 and Medicaps Km13.430 LVUP at Sirsodiya Junc at Km61.660 Flyovers at Dhanmod Bypass Km65.455 and Dhanmod Bypass End Km73.495 under road safety improvement on Indore Khalghat Sec of NH52 in MP on EPC mode
Consultancy services for AE for Construction of Descoped Portion of Binnaguri Bypass in Binnaguri Mouza of NH-27 (Old NH-31D) from Chainage 17.500 to 23.000 of old NH-31D in the District of Jalpaiguri West Bengal on EPC Mode under NH(O)
Construction of LVUP at Noolvi cross at Km 397.540 of Six Laning of Hubli Haveri section from km 340.000 to km 403.400 of NH48 Old NH4 in the State of Karnataka under Standalone mode in the Annual road safety Plan under EPC mode
Construction of New Double Tier 4-lane Elevated Corridor from Chennai Port to Maduravoyal in Chennai District from km 0.342 to Km 20.223 on EPC Mode under Bharatmala Pariyojana in the State of Tamil Nadu-Package-IV (km 14.185 to Km 20.223)
Consultancy services for AE for Supervision of 4-Laning of existing 2-4 laning stretch of Mohol-Alandi (Pkg-IV) from Dharmapuri-Lonand (design Chainage 117.000 km-166.400 km with design length 49.400 km) Section of NH-965 in Maharashtra on EPC Mode
CS for AE services for Construction Four Lane Bypasses for Jagatpur Babuganj Unchahar Alapur Bypass and Sai River Bridge and upgradation of carriageway Km 180.200 to 188.700 of Raebareli-Prayagraj section of NH-30 in UP on EPC mode under Bmp (ICR)
CS for AE for Const. of EC for Gammon Junc. at Km.903.265 BS ID No.AP-05-092 and Diwancheruvu junc. at Km. 902.308 BS ID No. AP 03 299 on NH-16 in Andhra Pradesh under NH(O) on EPC mode