Loading…
Loading…
25,857 results • Best match
on EPC mode. Job No. 310A/SK/2021-22/07
EPC contract as per NIT
Stage strengthening work from Ch 10 km to 30 km of NH-35 under Barasat NH Sub Divin-II of NH Division V, P.W. Rds Directt in the Dist of North 24 Pgs WB during the year 2020-21 on EPC mode. Job No. 035-WB-2020-21-469.
Work of increasing capacity of Transformer in 33/11 KV Substaion Khalilabad under Business Plan 2017-18 on Turn Key Basis.
Renovation of WTA of Dhanara Major State RLI(E) on Turn Key basis (i.e including supply of PVC Pipes and MS/GI materials ) under Core Sector
Engineering Procurement and Construction of Foot over bridge at Vikasnagar Shimla with comprehensive operation and maintenance of lift for 5 years
TENDER FOR PROCUREMENT OF Machinery AND Equipment on Turn key Basis
Widening-Improvement to 2 (Two) Lane with Earthen Shoulder of Yaingangpokpi-Finch Corner Section from km 0.00 to 16.900 (length 16.900km) of NH 202 in the State of Manipur on EPC mode
SUPPLY, INSTALLATION AND COMMISSIONING Work for KULFI MIX PLANT WITH PUSH LOLLY MACHINE ON TURN KEY BASIS FOR DAIRY PLANT UDAIPUR (RAJ.),
Work of Replacing Jarjer ACSR Dog Conductor from 33 KV Bithariya Pump Cannal feeder under Business Plan 2017-18 on Turn Key Basis.
Construction of 250 Nos. Type-II Qtrs. S plus 6, in EPC Mode-1 at CISF SSG Campus, Greater Noida UP. (SH: Providing skilled, semi-skilled and Unskilled workers for smooth functioning of ADG Lucknow office and sub-division 06 office). Subwork/Packages: Civil work
Construction of 250 Nos. Type-II qtrs. (S plus 6), in EPC Mode-1, at CISF SSG Campus, Greater Noida (UP). (SH: Providing skilled/semi-skilled and Unskilled workers for smooth functioning of ADG, Lucknow office and sub-division-06 office). Subwork/Packages: civil work
Doubling of Track between Furkating (331.138 km) (excluding) and Selenghat stations (including) up to km 394.30 (63.162km) including Electrification and Signalling works in connection with Furkating - New Tinsukia doubling project of Northeast ... on EPC mode
ONE TIME IMPROVEMENT OF EXISTING ROAD ALONGWITH RAISING OF CERTAIN SUBMERSIBLE LOCATION IN MONSOON SEASON IN AMBIKAPUR TOWN (FROM KM 375.600 TO KM 385.700) AND IN SITAPUR TOWN (FROM CH. KM 433.850 TO KM 437.670) SECTION OF NH-43 ON EPC MODE.
Supervision Consultancy Services for Construction of Bhugaon Realignment Road from Ch 0.000 to Ch 0.860 with 4 lane configuration on Pune Male section of NH-753F in the state of Maharashtra on EPC mode II nd call. Total Project Length 0.860 km
Consultancy Services for Authority Engineer for Supervision of 4-Laning of Itanagar to Banderdewa section of NH-415 from km 40.430 to km 51.735 (Package-B) and Km 51.700 to Km 59.199 (Package-C) on EPC Mode in the state of Arunachal Pradesh
Providing permanent restoration to valley side slips occurred during monsoon of 2019 20 by soil nailing with tie back system to RCC retaining walls from Km 86.200 to 99.200 Charmadi ghat of NH 73 old NH-234, Mangalore Tumkur section on EPC Mode
Widening from 2 Lane to 4 Lane of reach from Km 1.5 to 3.7 under Long Term Rectification of blackspots ID TG 02 205 TG 05 181 on Khammam Aswaraopeta Section of NH 365BB in the state of Telangana on EPC mode
RFP for the work of Rehabitation and Upgradation of NH931A from Design Ch. 0.000 to Design Ch.53.500. (Design length 53.50 Km) to 2L / 4L plus PS of Jagdishpur-Jais-Salon of NH931A on EPC Mode in the State of Uttar Pradesh.
RFP for Rehabilitation and Upgradation to 2-lane with paved shoulder configuration of Lambasingi to Paderu section Km 205/000 to Km 253/010 of NH-516E in the State of Andhra Pradesh under Green National Highways Corridor Project GNHCP on EPC mode
Strengthening of Jalandhar Kapurthala Sultanpur Lodhi Lohian Makhu road from Km 0 00 to 0 715 Km1 88 to 4 040 and From Km 37 680 to Km 48 490 section of NH 703A in the State of Punjab on EPC Mode
Construction of High Level Bridge including approach road across Jarwahi Nalla on the approach road and approach road of Son River Bridge on Beohari Katni road Via Vijaysota in K.M. 37/10 Distt. Shahdol in the state of Madhya Pradesh. on EPC Mode
Periodical Renewal from Km 16.80 to Km 17.850 Km 18.45 to Km 41.8 Km 42.050 to Km 42.850 Km 43.15 to Km 47.9 Km 49.325 to Km 57.3 of NH 207 Sarjapur Hosakote Section in the State of Karnataka on EPC mode
Design, Engineering, SITC of 6.0 MW Wind Farm on EPC Mode at VOCPA, Tuticorin along with Civil works and Power evacuation system to be connected with Grid as per DISCOM TNPDCL norms including Comprehensive Oand M for 11yrs with 02yrs Guarantee period
Consultancy Services For Authority Engineer For Supervision Of Widening to 2 lane with paved shoulder from Km 0000 to Km 102310 Design Chainage of NH 548B ie Murrum Maharashtra border IB circle Bijapur Section in the State of Karnataka on EPC mode
Construction of Bridge including approaches across river Zuari on NH-17/NH66 on Panaji Mangalore Section in the State of Goa on EPC Mode (Package-I). S.H Providing interlocking pavers and exterior painting to compound wall and allied works of PMU, M
CS for AE for Supervision of Development of 6-lane access control highway of Bareilly-Ludhiana EC under BMP from Ranipur Barsi Saharanpur district to Sadopur Ambala district Ch.45.500-121.786 of Shamli Ambala section in Haryana on EPC Mode (PKG-II)
Construction of Road Junction minor bridge culvert in forest stretches length 7.1 km and balance mjb work on nal river on nandgaonpeth morshi warud mh mp border road section nh 353 k dist amravati on epc mode in the state of maharashtra
Construction of Morena bypass, Ambah bypass and Porsa bypass (Total length 27.16km) and Ater realignment to Bhind bypass (Total length 21.50 km) Section of NH-552 Ext. to Two lane with paved shoulder configuration in the state of MP on EPC MODE
Construction of 2 Major and 7 Minor Bridges in the Tembhurni to Kuslamb section of NH 548C and 3 minor bridges in the Kuslamb to Yedshi section of NH 63 to 4 lane standards in the State of Maharashtra on EPC mode
Balance work for Construction of 5 HL bridge at km 379.010 (Pangam) km 439.400 (Potteru) km 444.237 (Kongurukonda) km 457.075 (MV-90) and km 468.150 (MV-96) on NH-326 along the Malkangiri motu road in the state of Odisha on EPC mode
Upgradation of Kullu Manali section of NH 21 now NH 3 from Km 272 00 to Km 309 345 designed chainage on EPC Mode in the State of Himachal Pradesh under NHDP phase IVB Regarding Maintenance of Bypassed sections of National Highways
CONSTRUCTION AND UPGRADATION OF DITTE DIMME-MIGGING ROAD (DESIGN CHAINAGE FROM KM 85.657 TO KM 104.53 AND EXISTING CHAINAGE FROM KM 92.25 TO KM 113.65) TO 2-LANE WITH HARD SHOULDERS UNDER PROJECT BRAHMANK IN THE STATE OF ARUNACHAL PRADESH ON EPC MODE
CS for AE of Construction of new 4Lane Bridge over River Ganga at Downstream of Farakka Barrage including approaches connecting Farakka Raiganj of NH34 from km 290.940 (design chainage 0 km) to km 296.805 (design chainage 5.468 km) in WB on EPC Mode
CONSTRUCTION AND UPGRADATION OF DITTE DIMME-MIGGING ROAD (DESIGN CHAINAGE FROM KM 104.53 TO KM 129.31 AND EXISTING CHAINAGE FROM KM 113.65 TO KM 142.0) TO 2-LANE WITH HARD SHOULDERS UNDER PROJECT BRAHMANK IN THE STATE OF ARUNACHAL PRADESH ON EPC MODE
Authority engineer/PMC for Supervision of Construction of Four Lane Elevated Viaduct from Km 4.634 to Km 6.345 on NH-24A including Retaining Wall, service lane, at Grade Road and improvement of junctions in the State of Uttar Pradesh on EPC mode
Periodic Renewal for the year 2019-20 from Km 398/050 to Km 408/000 (Total Length - 9.95 Km) of NH- 15 under PWD Nagaon NH Division Nagaon in the State of Assam on EPC mode. (Job.No.TA/015/AS/2019-20/250)
CONSTRUCTION AND UPGRADATION OF DITTE DIMME-MIGGING ROAD (DESIGN CHAINAGE FROM KM 129.31 TO KM 152.81 AND EXISTING CHAINAGE FROM KM 142.02 TO KM 167.1) TO 2-LANE WITH HARD SHOULDERS UNDER PROJECT BRAHMANK IN THE STATE OF ARUNACHAL PRADESH ON EPC MODE
Engagement of user fee agency on the basis of EQ through etender for Annampalli FP (Km 78.000) for rehabilitation and upgradation of Gurajanapalli to Pasarlapudi of NH-216 to two lane with paved shoulder in the State of Andhra Pradesh on EPC mode
Engagement of user fee collection agency on the basis of CB at Vishankheda Fee Plaza at Km 283.600 for rehabilitation upgradation of Jabalpur-Bhopal Section of NH-12 to 4lane with provision of rigid pavement on EPC Mode in the state of MP
Engagement of user fee agency through E-Tender at Saini Majra Fee Plaza at km 28.160 from km 0.000 to km 50.860 on Ambala-Kaithal Section (Pkg.I) of NH-65 under NHDP Phase-III on EPC mode in the state of Haryana
Engagement of user fee agency on the basis of CB through etender for Gorribanda FP Km 19.755 for the Rehab and upgradation of NH326A to two lane with paved Shoulders in Andhra Pradesh under NH(O) on EPC Mode developed by MoRTH
A Const. of H. L. Bridge over river Subarnarekha at Gobaraghata on Jaleswar Old NH by Pass road to D.P. Road and B Construction of HL Bridge over river Subarnarekha at 1st km of Churmara to Chaughari in EPC mode of Contract
Construction of 6-lane access controlled Greenfield highway from km 125.000 to 150.000 of Deogarh-Rajasthan/Gujarat Border section of NH-754K as a part of Amritsar-Jamnagar EC in Rajasthan on EPC mode under BM (Ph-I) (AJ/DRGB-Package-6)
construction of connecting road (24.00 km) to imb fence at bp-167 and connecting road (23.00 km) to IMB fence at BP -168 along indo-myanmar border from BP-166 to BP-168 in changlang district of arunachal pradesh state on EPC mode
Construction of new MNB on Main Carriageway at km 462.087 on Old NH01 (New NH03) near Loharka crossing, MNB on Service Road including dismantling of old bridge, service road at RHS and concrete crash barrier with friction slab at RHS on EPC mode
Rehabilitation and up gradation of existing road between Km 95.287 to Km 100.300 design chainage Km 81.800 to Km 87.000 single lane to double lane with paved shoulder specification on Gangotri Uttarkashi Dharasu road NH34 on EPC mode in the State of
Rehabilitation and up gradation of existing rd bet Km 95.287 to Km 100.300 design chainage Km 81.800 to Km 87.000 single lane to double lane with paved shoulder specification on Gangotri Uttarkashi Dharasu rd NH 34 on EPC mode in the State
ENGAGING TECHNICAL CONSULTANT FOR PREPARATION OF FEASIBILITY STUDY (FS) AND DPR ON EPC MODE FOR CONSTR OF RD MOREH-THINGPAI-NEW SAMATHAL FROM KM 45.00 TO KM 85.00 (NEW SAMATHAL) (APPROX) TO NHSL SPCN UNDER PROJECT SEWAK IN MANIPUR STATE (SECOND CALL)
Construction of New 4-lane Bridge Across River Kosi at Phulaut including Rehabilitation and Upgradation of existing Birpur-Bihpur Section of NH-106 from km 106.000 to km. 136.000 to 2-lane with Paved Shoulder in the State of Bihar on EPC mode