Loading…
Loading…
25,852 results • Best match
Construction of community health center building (part 1) with permanent structure using reinforced cement concrete structure system technology at Padum Zanskar, UT of Ladakh on EPC mode III basis. (SH.:- Providing services of inspection vehicle for zone office at Leh.)
Construction of AIIMS at Awantipora (KASHMIR), Jammu and Kashmir (on EPC Mode 3 basis) etc. (SH: Providing services of four wheeled inspection vehicle for the O/o Executive Engineer & Senior Manager (E), AIIMS, Awantipora (Kashmir) Project Zone, CPWD, Srinagar) J&K
Construction of school of Engineering and Atal Bihari Vajpayee school of management & Entrepreneurship ay JNU Campus New Delhi including all Civil & MEP services, Horticulture and development works under EPC mode - III (SH: Providing services of office Assistant staff for IITPED Delhi)
Construction of AIIMS at Awantipora(KASHMIR), Jammu and Kashmir (on EPC Mode 3 basis). (SH: Providing services of four wheeled inspection vehicle for the O/o Executive Engineer & Senior Manager (E), AIIMS, Awantipora (Kashmir) Project Zone, CPWD Srinagar) (J&K)
Construction of AIIMS at Awantipora (Kashmir), Jammau and Kashmir (on EPC Mode 3 basis) etc. SH: Providing services of four wheeled inspection vehicle for the O/o Assistant Engineer (Elect.), AIIMS, Awantipora (Kashmir) Project Zone, CPWD Srinagar Kashmir, J and K
Periodical Renewal for the year 2019-20 from 373/000 to km. 396/425 (Total Length 23.425 Km) on NH-15 under Nagaon NH Division on EPC mode in the state of Assam, Job TA/015/AS/2019-20/252
Construction of 1.0 TPD Biogas plant at Goushala at Sri Lord Sri Venkateswara Swamy Temple of D.Tirumala Village & Mandal, Eluru District, Andhra Pradesh from Organic waste like Agriculture waste, Cow Dung, Food waste under GOBAR-dhan Project on EPC Mode...
Improvement and Upgradation of Existing 2-Lane Bypass to 6-Laning from Km. 403.100 (Design Ch. 402.600)-Km.433.000 (Design Ch.433.200) of Hubli-Dharwad Bypass section of NH-48 (Old NH-4) in Karnataka to be executed on EPC Mode
Consultant to provide Key personnel to assist Departmental Authoritys Engineer for Supervision of Construction of Bypass on NH-59 from km 336.350 to 349.910 km (13.560 km) near Berhampur including four lane ROB in the state of Odisha on EPC Mode
Consultancy services for preparation of DPR for construction of new 2 alne Major Bridge including approaches from Km.733.800 to Km.739.800 across Penna River on NH67 at Nellore in the State of Andhra Pradesh under NH(O) on EPC mode.
Construction of AIIMS at Awantipora (KASHMIR), Jammu & Kashmir (on EPC Mode 3 basis) etc. SH: Providing services of Multi Skilled Computer Operator, MTS etc. for the office of EE & SM(E), AIIMS, Awantipora (Kashmir) Project Zone, CPWD, Srinagar (J&K)
for Construction of two laning with paved shoulder of N.H.No.848 of Peth Bypass from Km.53/600 to Km 56/700 (Approximately 3.00 Km) (Design chainage 53.400 to 56.392) in Nashik District in the State of Maharashtra on EPC mode
Construction of 8 Lane Expressway starting near Junction with NH-12 near village Ummedpura to Major bridge over Takli river near Nayagaon Jageer village (Ch.419.000-427.300) section of Delhi-Vadodara GFA (NH-148N) under BMP in Rajasthan on EPC Mode
Construction Of Six Lane Flyover at the Junction Of Kandari Chokdi (Ch. 149.440) And Luvara Patiya (Ch.186.640) for Rectification of Blackspots on Vadodara - Surat Section Of NH-8 (New NH-48) in the State of Gujarat on EPC Mode.
Construction of Dualatabad Bypass Existing chainage from Km 98 500 to Km102 000) and Design Chainage from Km 0 000 to Km 3 865 section of NH 752 H in Chhatrapati Sambhajinagar District in the state of Maharashtra on EPC Mode
Construction of New Toll Plaza (12 lane) including Administrative building and other works at Kunimellihalli Km.347.180 of Chitradurga Davanagere Haveri Hubli section of NH-48 in the state of Karnataka on EPC Mode (for NHIT Eastern Projects Pvt. Ltd)
Construction of 2 lane Elevated Flyover from City Railway Station to Collector Residence including entry and Exit ramps with one extra exit at Court Circle towards Chetak Circle of carriageway width 5.5 mtr (on EPC mode) in Udaipur. (e_13 / Flyover)
Construction of Four Lane Expressway from Vejalka Village to start of DSIR Zone of Ahmedabad District from km 48.520 to km 71.060 section of Ahmedabad-Dholera Greenfield Alignment (NH-751) on EPC Mode Under Bharatmala Pariyojana in the State of Gujar
Rehabilitation and Up-gradation to 2 lane road with paved shoulders configuration for the balance work of 13 km length on Helwak - Patan - Karad section km 85.000 to 133.417 of NH -166 E in the State of Maharashtra on EPC mode
BID for Balance work of Construction of Bypass for providing inter connectivity amongst National Highways (NHs) around the Pratapgarh city (Pratapgarh Bypass) on EPC mode from km 0.00 to km 2.90 (Near junction with NH-931)in the State of UP
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Construction of 4 lane with PS Idar-Badoli bypass section from Design chainage km 81.300 to 95.500 of NH-168G in the state of Gujarat ,Total Length 14.2 Km, on EPC mode
Widening of Existing Road from Intermediate Lane oblic 2-lane to 4-lane Between Km 19.994 to Km 35.180 of NH-848A Rakholi-Khadoli-Velugam Section in U.T. of Dadra and Nagar Haveli and Daman and Diu on EPC mode.
Engagement of user fee agency through e-quotation for Dularpur Fee Plaza for two lane with paved shoulder road under EPC mode on Bahraich-Shrawasti Section (km 248.400 to km 310.000) on NH-730 in the state of Uttar Pradesh
Upgradation of Existing Two-Lane Carriageway to Two Lane Carriageway with Paved Shoulder from Ch. 665.686 (Existing Km. 665.686) in Khanpur Village to Ch. 710.462 ( Km. 710.483 in Karvad Village (Length 44.776) Sec. of NH-56 in Gujarat on EPC Mode.
Strengthening of NH-921 Mahuwa - Mandawar - Rajgarh road from Km 0/00 to 25/400 and 43/00 to 49/00 on EPC Mode (Total 31.40 Km) in the State of Rajasthan (Job No. NH-921-RJ-2019-20-740)
Balance work of Rehabilitation and Upgradation to four laning of Baharagora Singhara sec. of NH-49 from Km.229.727 to Km.238.990 including cons. of Five Elephant Underpasses (EUPs) and Fourteen Animal Underpasses (AUPs) in Odisha state on EPC Mode.
Balance work of 6 lanning of existing 4 lane from Km 22.300 (Thondupally) to Km 34.144 (Kothur) (Design Length 11.844 Km) on Hyderabad Bangalore Section of NH 44 in the State of Telangana under Bharatmala Pariyojana Phase on EPC Mode
Design and Construction of Vehicular Underpass with approaches at Khodad Junction Km 78 600 and Ambikhalsa Junction Km 113 150 on Khed Sinnar section of NH 60 Old NH 50 in the State of Maharashtra as Standalone project on EPC Mode
PR work from km 193 to 233 (41 km) and Provision of THRIE Metal Beam Crash Barrier in km 176 to km 233 (58km) of NH- 707 A in the State of Uttarakhand under Annual Plan 2023-24 on EPC mode
Construction of Maski Bypass Starts at existing Km 144.22 and ends at existing Km 151.760 and Sindhanur Bypass Starts at existing Km 168.37 and ends at existing Km 180.8 on NH 150A in the State of Karnataka on EPC mode
Rebuilding of 2L ROB with 3L ROB at Rly km.20/201 between Guntur and Vejendla Stations of Guntur-Tenali Section at km.406.300 (LHS) of Chilakaluripeta-Vijaywada sectioni of NH-16 in the state of AP on EPC Mode.
Widening and Strengthening of NH-20 from Mangalpur to Kayangola from Chainage 35.800 Km to 47.600 Km including construction of spur route of length 4.724 Km from Kayangola to Aradi (Akhandalamani Temple) in the state of Odisha on EPC mode
Widening and Strengthening to 2-Lane with Paved Shoulder and geometric improvement of NH-114A from km 65.500 (Tower Chowk Dumka) to km 87.530 (Basukinath) on EPC mode in the state of Jharkhand.(JOB NO-NH-114A-JHR-2020-21/291)
EXECUTION OF ERECTION WORKS FOR DISMANTLING AND DIVERSION/ SHIFTING/HEIGHT RAISING OF PART OF EXISTING 220 KV UNCHAHAR(NTPC)-RAEBARELI(PG) LINE ON TURN-KEY BASIS FOR THE PURPOSE OF CONSTRUCTION OF DOUBLE TRUMPET FOR GANGA EXPRESSWAY ON TURN-KEY
SSI, DESIGN, DRAWING AND CONST OF 02 NOS MAJ PMT STEEL SUPER STRUCTURE (THROUGH TYPE) OF 70 MTR SPAN EACH BR INCL APPRO RD AT KM 15.200 MEDI, KM 27.450 LIBI ON RD N-TCC THROUGH EPC MODE UNDER 128RCC,23TF, (P) ANK IN A. P EPC JOB NO 106/87/ARK, 2 CALL
Consultancy Services for Authority Engineer for Supervision of Construction of 2-lane road of Potin to Pangin section of NH-13 (Package-A, Design chainage from Km 0.000 to Km 117.560) on EPC Mode in the State of Arunachal Pradesh under Arunach
CONSTRUCTION OF THREE STORIED RESIDENTIAL SCHOOL CUM HOSTEL FACILITY AT PAU SHANKAR KANE VIDYALAYA, NGALOIMOUL AT TAMENGLONG, MANIPUR ON EPC MODE
Project Management Consultancy Services for the work of Design & Construction of Working Womens Hostel Buildings including maintenance of buildings for 1 year under EPC contract at Narasapura Industrial Area, Kolar Taluk & District.
Improvement of Water Supply to provide safe and clean drinking water conforming to Drink from Tap Quality to Karanjia, Udala, Rairangpur, Baripada, Rourkela, Sundergarh, Biramitrapur and Rajgangpur on EPC Contract (Package-II)
Construction of Road From Tilau Village to Picchore Dinara Road at KM 14/8 to Gajora Village via Chandu Pahari, Manka, Gadrauli, Khurai, Jungipur, Bhitargawa, Manpur Road Total Length 22.90 KM. in the State of Madhya Pradesh on EPC Mode (First
Rectification of black spots at km 119.3 Amtala_km 119.745 Hosenabad km 121.25 Dharma and km 125.5 Keranichoti of NH 60 under NH div-II in the dist. of Paschim Medinipur during the year 2019-20 on EPC mode. Job No. 060_WB_2019_20_466
Consltancy services for AE for Supervision of Rehabili.and Upgrada. to 2L with PS confi.from Km0.000 to Km7.800 and km.35.400to Km.52.345(Dg.len. 24.745Km. except,Bihar portion)of NH727B(Tamkuhiraj to B.B. and B.B. to Majhauli)on EPC mode in UP
Tender for Design, Engineering, Supply, Erection, Testing and Commissioning of HT LT Package and its associated works on EPC mode for the project of Supply, Installation, Testing and Commissioning of FGD System for 1 500 MW Unit 6 Ukai TPS,
STABILIZATION OF LANDSLIDE AND SLOPE PROTECTION AT KM 474.710 TO KM 474.850 and KM 475.565 TO KM 475.625 ON RISHIKESH JOSHIMATH - MANA ROAD NH-07 ON EPC MODE IN THE STATE OF UTTARAKHAND. (NOS OF LAND SLIDE 02 NOS ON ENGINEERING,
Request for proposal ( RFP ) for Survey Investigation , Detail Design and Construction of Major Arterial Road - ELevated Corridor , E05 Road ( Package XXIII) on EPC basis in Amaravati Capacity City , AndhraPradesh ( including DLP -2 Years )
Periodic Renewal Work in Km. 505.000 to 537.000 of NH-730 in the state of Uttar Pradesh (including Thin white topping Ch. 525.915 to 528.000 and Ch. 533.000 to 535.000 on (EPC) basis
EPC Basis for Design Engineering Supply Erection and Installation along with commissioning of Sewage Treatment Plant by Septic Tank Elimination Project inside DNPL Township along with operation maintenance for period of 2 Years
Construction of MSME Technology Centre at Thiruvananthapuram (Kerala) under the Scheme Establishment of New Technology Centre/Extension Centre on Engineering Design, Procurement and Construction (EPC) basis including Maintenance for 2 year during Def
Strengthening and Improvement of existing 2 and 4 lane with paved shoulder Jind-Karnal Section of NH-709A from Design km. 68.857 to Design 82.227 in the state of Haryana on EPC basis.
Selection of Contractor for work of Design and Build / Renovation of existing Zila Pustakalaya Varanasi Civil Structure at Varanasi, Uttar Pradesh including five years maintenance through process of e-tendering on EPC Basis.