Loading…
Loading…
25,854 results • Best match
BW under Phase-II for 4-laning of Khed Sinner comprising of the stretches of Kalamb bypass (km68.576 to km72.390) Linear length of Bhatkalwadi (km89.550 to km90.400) and Alephata bypass (km 92.030 to km 96.000) in Maharashtra on EPC Mode
CONSTRUCTION OF ROAD CHERLUN TO INDO MYANMAR BORDER FROM KM 0.00 TO KM 16.649 (NET LENGTH 16.649 KM) TO CONNECT COBS OF ASSAM RIFLES IN HNAHTHIAL DISTRICT UNDER 74 RCC /24 BRTF/ PROJECT PUSHPAK IN MIZORAM STATE THROUGH EPC MODE
Consultancy services for Supervision Consultant for Operation and Maintenance of Up gradation of Kullu-Manali section of NH-21 (new NH-3) from Km 272.00 to Km 309.345 (Designed Chainage) on EPC mode in the state of Himachal Pradesh under NHDPPhaseIVB
CONS AND UPGRAD TO NHDL SPEC FROM KM 7PT900 TO KM 18PT000 (DESIGN CHAINAGE KM 7PT900 TO KM 16PT904) (KM 0PT000 RECKONED AT KHALSAR) OF ROAD KHALSAR AGHAM UNDER PROJECT HIMANK IN LADAKH (UT) ON EPC MODE (LENGTH 9PT004 KM)
Construction of 4 nos. Bridges at Km 47.000 (Jhiram nalla), Km. 123.000 (Kerlapal nalla), Km. 127.800 (Bodaguda nalla) and Km. 137.400 (Dubbatota nalla) on NH-30 (Old NH-221) Jagdalpur-Sukma-Konta road in the state of Chhattisgarh on EPC Mode.
AE Services for Balance Works for 6Laning of Sriperumbudur to Karapettai Sec of NH-4(New NH-48) from Km 37.000 (Exis Km 37.000) to Km 71.015 (Exis Km 71.000) in Tamil Nadu on EPC Mode under NHDP Phase-V
Widening to Two Lane with Paved shoulders including strengthening of existing pavement from km 0.00 to km 24.800 of NH 28B New NH 727 on EPC mode in the state of Bihar for the year 2021 22 Length 24.800 Km
IRQP of road work from Km 16.00 to Km 61.00 (excluding Km 27.925 to Km 29.065 and Km 39.00 to Km 40.500) of NH-75E in the state of Jharkhand under EPC mode (Job No - NH-75E-JHR-2021-22-302)
DESIGN AND CONSTRUCTION OF PMT 55.00 M PSC BOX GIRDER GAGRIAN BRIDGE OVER GAGRIAN NALLAH AT KM 0.30 INCL APPROACH WORKS ON EPC MODE ON ROAD GALI ANGANPATHRI UNDER 79 RCC 31 BRTF PROJECT SAMPARK IN UT OF J K
Construction of balance work of Widening and strengthening for improvement and up-Gradation of NH-709A Garhmukteshwar chainage- 83.200 of NH24 to Meerut (chainage 9.860 of NH235) including connector to Nh-119 Package XII in Uttar Pradesh on EPC Mode.
Design Engineering and Procurement of Construction of Indoor Sports Complex for increase of 50 seats in UG Course in New Campus of Dr Ram Manohar Lohia Institute of Medical Sciences Gomti Nagar Extension at District Lucknow UP on EPC mode
Construction of ROB at km 168.954 of NH-75E between Talaburu and Kendposi railway station (LC No. RBK-30) in the State of Jharkhand on EPC mode for the year2021-22(Job No. NH-75E/AP/JHR/2021-22-315).
Work of Strengthening/One Time Improvement Including reconstruction in various stretches of road from km 8.560 to km 29.000 of NH-419 in the State of Jharkhand under EPC mode. (JOB NO-NH-419-JHR-2021-22-303), (Length-19.00 km).
Widening and reconstruction to 2-Lane with paved shoulder from km 10.900 to km 24.793 (excluding km 14.855 to km 16.291) of NH-133 in the state of Jharkhand under EPC mode (Job No-NH-133-AP-JHR-2021-22-308)
Widening and Reconstruction to 4 Lane/4 lane with Service road including structures from Pokhria More at km 47.600(Ex. Km 50.230) to Govindpur at km 62.949(Ex Km 65.325) of NH-419 in the State of Jharkhand on EPC mode.
Widening and Reconstruction to 2 Lane with paved shoulder from Runarayanpur to Pokharia More from (Design Km 8.56) to (Design Km 38.656) and (Design Km 40.456) to (Design Km 46.375) of NH-419 in the State of Jharkhand on EPC mode.
Rectification of identified Accident Black Spots using Long term measures (i) from km 15.6000 to 16.000 near Doy Dholia bridge and (ii) from km 79.100 TO 79.200 near Sahakri on NH-133 in the state of Jharkhand on EPC Mode.
Construction of ROB at km 160.327 of NH-75E between S Jhinkpani and Talaburu railway station (LC No. RBK-24) in the State of Jharkhand on EPC mode for the year2021-22(Job No. NH-75E/AP/Ranchi/2021-22-316)
Construction of 2 lane road in forest Area from Km. 38/100 to 43/040, 46/500 to 47/080, 51/640 to 54/500 forest Section (8.40 Km) of NH-113 on EPC Mode in the state of Rajasthan
Consultancy services for (AE) for supervision of Construction of Shohratgarh Bypass (Design Length 6.273 Km) to 2lane with paved shoulder on NH-730 starts near ch. 413.700 and ends near ch. 419.000) under EPC mode in the State of UP.
Construction of 2 Lane ROB with approaches in lieu of existing L.C. No. 41E at Km 86/100 (Railway chainage Km 64/5 6) of NH42 under Setu Bharatam in the state of Andhra Pradesh on EPC mode (2nd call)
Rehabilitation Upgradation to 4 lane with Paved shoulder of Existing Section in Sillod Town with Design Ch. Km. 54.500 to Km. 60.679 Length 6.179 Km. Section of NH.753.F Aurangabad.Jalgaon road on EPC Mode in the State of Maharashtra.
Construction of Limited Height Subway RUB near proposed ROB at Railway km. 576 10 11 LC No C61 on NH89 Old NH at Ch 165 550 Left out portion of Nagaur Bikaner Section in the state of Rajasthan on EPC Mode
Road Protection work in Hill side and Valley side at km. 171 (ch. 170.750 to 170.930) and at km 172 (Ch. 171.700 to 171.900) on NH-707 in the State of Uttarakhand under Road Safety Plan 2023-24 on EPC Mode
Up-gradation of Keonchi - Ratanpur Road of NH 45 package-I, from design chainage Km 237.860 to Km 273.200 of length 35.340 Km to Two Lane with Paved shoulders under corridor scheme on EPC Mode in the State of Chhattisgarh.
Rehabilitation and Upgradation of existing carriageway to two lane with paved shoulder standard in Arvi to Talegaon section of NH-347A from Km.99.700 to Km.86.000 Section of NH 347 in the State of Maharashtra on EPC Mode. Balance Work
Widening and Strengthening to 2-Lane with Paved Shoulder along with geometric improvement including Replacement of Culverts from km 79.00 to km 117.20 of NH-99 under NH(O) on EPC mode in the state of Jharkhand under NH Division, Ranchi
UPGRADATION OF ROAD BUDHAL MAHOREGUL FROM EXISTING CHAINAGE KM 65.880 TO KM 86.725 (DESIGN CHAINAGE KM 53.250 TO KM 88.200 NET LENGTH 34.950 KM PACKAGE III TO NHDL SPECIFICATION UNDER P SAMPARK IN UT OF J K ON EPC MODE
Permanent Rectification of 04 Nos. of Blackspots (TN-(02)-117, TN-(02)-064 /143, TN-(02)-567 and TN-(02)-025) in Madurai to Tuticorin section of NH-38 (Old NH-45B) in the State of Tamil Nadu on EPC mode
Construction of 6 lane Elevated highway at km 414 at Beas at km 438.850 at Jandiyala including VUP at km 432.300 at Chouhan and flyover at km 425.880 at Khilchanon on Amritsar Jalandhar section of old NH01 on EPC mode
Balance Works of Rehabilitation and Upgradation of Nakrekal to Nagarjunasagar section of NH 565 to 2Lane Paved Shoulder from Km 1.000 to Km 86.057 under NH O for the year 2020 21 in the State of Telangana on EPC Mode
CONSULTANCY SERVICES FOR AUTHORITYS ENGINEER FOR SUPERVISION OF Upgradation of Jharkheda- Berasia - Dholkhedi from km 0/000 to km 87/900 of NH-346 (including 3 nos. green field bypasses 13.10 Km) in the State of Madhya Pradesh under EPC mode
Construction of Four Lane Divided Carriageway with Paved Shoulder from Patan (Near Rajpur) at Km 52.000 (design) to Gojariya at Km 128.940 (design), a length of 76.940 km (PKG II) of NH-68 in Gujarat under NH(O) on EPC Mode
Execution of Pressurized UGPL Irrigation Network system for Right command of Lower Suktel Irrigation Project with Distribution network up to 1 Ha sub-chak compatible with micro irrigation having total planned CCA of 27000 Ha on EPC mode of contract
Construction of a 2L PS Road Over Bridge ROB t km 2 135 parallel to the existing ROB and reconstruction of existing 2 lane ROB at km 48 557 to 4L PS standards in the state of Maharashtra on EPC mode
Construction of ROB at km 154.831 of NH-75E between Singhpokharia and Jhinkpani railway station (LC No. RBK-21) in the State of Jharkhand on EPC mode for the year2021-22(Job No. NH-75E/AP/Ranchi/2021-22-317).
Construction of HL RCC Bridge (5x26.50M) in Km 19 (Kinjer) of NH 33 (Old NH 110, Km 71) in the district of Arwal in the State of Bihar for the year 2024 25 under NH Divison Gaya on EPC mode.
Construction of 2-lane ROB and its approaches at km 36/800 (Jarua) on NH-26A Katni-Bina Railway line on Sagar to Bina road of Sagar District in the state of Madhya Pradesh on EPC Mode under Setu Bharatam.
Construction of 6 lane flyover from Khapari ROB to Mihan Interchange and upgradation of existing 4 LPS road to 6 LPS with service road by flexible pavement in section of Nagpur - Hyderabad in the state of Maharashtra on EPC mode
Rehabilitation and up-gradation to 2-lane configuration of Kangarchina to Almora road from km 161.600 to Km 196.670 Existing Chainage 169.00 to Km 206.00 of NH-309A in the State of Uttarakhand Package-V under NH(O) on EPC Mode.
Consultancy Services for Authority Engineer for Supervision of Construction of 2-lane road of Potin to Pangin section of NH-13 (Package-B, Design chainage from Km 117.560 to Km 247.050) on EPC Mode in the State of Arunachal Pradesh
Consultancy Services for Authority Engineer for Supervision of Construction of 2-lane road of Potin to Pangin section of NH-13 (Package-C, Design chainage from Km 247.050 to Km 351.383) on EPC Mode in the State of Arunachal Pradesh
Permanent Rectification of Black Spot TN-02-217 by constructing a VUP at Km 19 250 (Mettupatti village) in the project of Salem -Ulundurpet section of NH-79 (Old No. NH-68) in the State of Tamil Nadu on EPC Mode
Construction of ROB at km 164.444 of NH-75E between S Jhinkpani and Talaburu railway station (LC No. RBK-26) in the State of Jharkhand on EPC mode for the year2021-22(Job No. NH-75E/AP/JHR/2021-22-320).
Construction of VUP including approaches and Service Roads at Chevuru Cross Road at Km.1307.275 (Black spot ID AP-(03)-190-BS) on Chilakaluripeta-Nellore Section of NH-16 (Old NH-5) in the State of Andhra Pradesh on EPC Mode
Improvement and up gradation from NH227B (84 Kosi Parikrama Marg) Package-V Design Km 140.960 (Patranga) to Km 160.200(Bahuvan Madar Majha) to two lane with paved shoulder configuration with Parikrama Marg under EPC mode in the State of Uttar Pradesh
Widening to two lane with paved shoulders of Sangameswaram Nallakaluva Velugodu Nandyal section from Km. 93.819 to 124.530 141.700 to 173.560 of NH 167K in the State of Andhra Pradesh under Annual Plan 2022 23 on EPC mode under NH O
Construction of Staff Training Centre along with branch and Currency Chest including all civill and E & M services and Development of sites & builk services for Punjab National Bank, Peenya Industrial area, Bangaluru, Karnataka in EPC mode ( Design and Build Basis)
Construction of AIIMS at Awantipora (Kashmir), Jammu & Kashmir (on EPC Mode 3 basis) etc. (SH: Providing services of Multi Skilled Computer Operator, MTS etc. for the office of EE&SM(E), AIIMS, Awantipora (Kashmir) Project Zone, CPWD, Srinagar Kashmir, (J&K)
Design and Construction of 150 Bedded (Ground & 6 Floors) Critical Care Hospital Block Building for AIIMS, Rishikesh including all internal & external, Civil, Electrical & Mechanical Services, all external Civil & E&M Development works & Horticulture ... in EPC Mode .