Loading…
Loading…
25,852 results • Best match
Balance Works for 6 laning of existing 4 lane stretch of NH 44 from Gundlapochampally (Design chainage km 471.300) to Bowenpally (Design chainage km 481.331) total length 10.031 km in the State of Telangana on EPC mode under Bharatmala Pariyojana.
Consultancy services for authority engineer/ PMC for supervision of rehabilitation and up- gradation from km. 51.600 to km. 75.700 of NH 321G (Nuhkhas to Etah section) to two lane with paved shoulder configuration under EPC Mode in the State of U
Consultancy Services for Authority Engineer for supervision of the work of Construction of Flyover, Rotary and Under Pass at Tribune Chowk on NH-05 in the UT of Chandigarh under NH(O) on EPC mode (Length- 1.65km, Lane- 6 lane).
Construction of 2-lane road of Potin to Pangin section of NH-13 from Km 77.95 to Km 117.56 (Package-3) on EPC Mode in the State of Arunachal Pradesh under Arunachal Pradesh Package of Roads and Highways of SARDP-NE
Rehabilitation and Upgradation to 2-lane with paved shoulders configuration of Bewar-Allahganj Section (KM 0.000 to KM 52.770) of NH-730C in the State of Uttar Pradesh under GNHCP with the loan assistance of World Bank on EPC mode.
Periodical renewal of Jonai (Ruksin Gate)-Pasighat-Raneghat Road section of NH-515 from km. 536.00 to km. 5550.150 under Pasighat Highway Division, PWD in the state of Arunachal Pradesh on EPC mode under Annual Renewal Programme (ARP) 2021-22.
Periodical renewal of Jonai (Ruksin Gate)-Pasighat-Raneghat Road section of NH-515 from km. 510.00 to km. 522.00 under Pasighat Highway Division, PWD in the state of Arunachal Pradesh on EPC mode under Annual Renewal Programme (ARP) 2021-22.
Construction of 2-lane road of Potin to Pangin section of NH-13 from Km 284.92 to Km 314.25 (Package-8)on EPC Mode in the State of Arunachal Pradesh under Arunachal Pradesh Package of Roads and Highways of SARDP-NE
Construction of 2-lane road of Potin to Pangin section of NH-13 from Km 163.59 to Km 206.66 (Package 5) on EPC Mode in the State of Arunachal Pradesh under Arunachal Pradesh Package of Roads and Highways of SARDP-NE
Strengthening the selected stretches from km 5.600 to 16.000 and km 18.400 to 20.000 and km 27.400 to 49.350 of Rajamahendravaram Madhurapudi airport section of NH 516E in the state of Andhra Pradesh on EPC mode under Annual Plan 2019 20
Consultancy services for AE for rehabilitaion and upgradation 2_4 lane with paved shoulder configuration for the work of gangakhed palam loha road NH361F from km 169.00 to 210.00 desigh chainage km 30.400 to 71.400 in state of maharashtra on EPC mode
One time improvement of existing road from Km 1/0 to 8/4, Km 9/0 to 10/9 and Km 19/3 to 21/8 of NH 365BB of Suryapet - Khammam section in the state of Telangana on EPC mode
Widening of existing road to 2 lane with paved shoulder from Hukanjuri to Khonsa section of NH-315A from design chainage Km 9.00 to Km 12.24 (Package-B) on EPC mode in the state of Arunachal Pradesh under NH(O).
Improvement to two lane with paved shoulder of Saraigarh on NH 327A Lalganj Ganpatganj upto NH 106 New NH 131 from KM 0.000 to KM 10.672 Total Length 10.672 km of NH 327AD on EPC mode in the State of Bihar
RFP for the Construction of Jasra bypass with four lane paved shoulder configuration from km 379.670 of NH- 76 (New NH-35) to km 18.000 of NH-27 (New NH-30) on EPC mode in the State of Uttar Pradesh.
Strengthening work from Km. 121.700 to Km 129.450 (Champawat Aabadi portion), Km136.320 to km.142.00 (Lohaghat Aabadi Portion) and km.197.150 to km. 202.00 (Pithoragarh Aabadi Portion) on NH-125 (new NH-09) in the state of Uttarakhand under EPC mode
Realignment of road from Km 35.935 to 39.255 Chowdapur village Km 58.220 to Km.62.290 Afzalpur Town and Km 70.125 to Km 72.920 Ballurgi village of NH150E with 2 lane paved shoulder in the state of Karnataka on EPC Mode
Periodic Renewal of existing road from km 12 720 to km 23 400 of NH 703A under National Highways Division PWD B and R Jalandhar in the State of Punjab for the year 2021 2022 10 68 KM on EPC Mode
Widening to two lane with paved shoulders from design Km. 410.600 Existing Km. 413.740 to design Km. 441.900 Existing Km. 447.610 of Hiriyur-Huliyar Section of NH 150A in the State of Karnataka on EPC Mode under Annual Plan 2021-22
Rehabilitation and Upgradation to 4-lane configuration of Ras-Beawar Section (km 0.000 to km 30.000) of NH-158 in the State of Rajasthan under Green National Highways Corridor Project (GNHCP) with the loan assistance of World Bank on EPC mode
Techno Commercial Offer for Providing Consultancy services for obtaining Forest Approval From Forest Department for Construction of flyover on NH 62 at Km. 213 600Khimsar Village on Nagaur Jodhpur section in the State of Rajasthan on EPC Mode in Road
Widening of existing road to 2 lane with paved shoulder from Hukanjuri to Khonsa section of NH-315A from design chainage Km 26.30 to Km 27.474 (Package-D) on EPC mode in the state of Arunachal Pradesh under NH(O).
Reconstruction of 5 Nos. of sub.standard bridges Arawali bridge at Km70.865, Sanagmeshwar bridge at Km 96.741, Saptalingi bridge at Km113.050, Bav bridge Km 117.110 and Anjanar ibridge at Km 143.500 on NH.66 in the state of Maharashtra on EPC Mode.
Rehabilitation and Upgradation of Risod Town to Four Lane with Paved Shoulders standards from Km. 36.845 to Km. 39.340 and Km. 41.520 to Km. 44.220 Total Length 5.2 KM of NH 461B in the state of Maharashtra on EPC mode
Construction of Bypass road to V.Kota (Km.333/400to340/900) and Byreddypalli town (Km315/900to318/250) to 2 lane with paved shoulder of NH-42 (Palamaneru Krishnagiri Boarder) in Chittoor District of Andhra Pradesh on EPC mode under Annual Plan2022-23
Rehabilitation and upgrading to two lanes with paved shoulders configuration and Strengthening o from Km 175.00 to km 196.00 (Gumakhal to Satpuli) on NH-119 (New 534) in the State of Uttarakhand Under Annual Plan 2021-22 on EPC mode.
Construction of Eight Lane Carriageway starting from Major bridge over Takli river near Nayagaon Jageer village to Rajasthan-MP Border (Ch.427.300 to Ch.452.425) section of Delhi-Vadodara (NH-148N) under BMP in the State of Rajasthan on EPC mode
Permanent Rectification of Black Spot TN-(02)-269, 595 and 539 by construction of VUP at Km.260.820 (Keerambur Junction), at Km.268.516 (Oviyampalayam Junction) and Service Road from Km.272.200 to Km.274.200 (Association Petrol Bunk) on EPC Mode
Construction of VUP Talkere Hand Post KA 02 057, LVUP Agrahara Junction KA 02 273 and VUP Tippasandra Hand Post KA 02 015 of MORTH Identified Black Spots on Devihalli Hassan section of NH75 to be executed on EPC mode
Construction of High-level Bridge and its approaches in place of existing Low-level Bridge at Km 466.310 on Penchalakona to Yerpadu section of NH-565 with Two Lane Paved Shoulder configuration in the State of AP on EPC mode.
CONSTR OF FOOT TRACK INCL EARTHWORK, SURF WKS, ROAD FURNITURE, FOOT SUSPENSION BRIDGES, LOG BRIDGES, STAGING CAMPS AND ROAD PROTECTION WORKS FROM MAGO TO TSELA (NET LENGTH 27.418 KM) THROUGH EPC MODE OF EXECUTION IN THE STATE OF ARUNACHAL PRADESH
Construction of 6-Lane Flyover at AIIMS Bibinagar from Km.32.125 to Km.33.825 under MoRTH identified Blackspot TS-05-128 for the period 2019-21 on Hyderabad-Yadgiri section of NH-163 in the state of Telangana on EPC Mode.
AE for Long Term Rectification of MoRTH identified Blackspots 17 and Removal of 2 AtGrade Junctions and allied works on existing 4/6 Lane Hyderabad Vijayawada section of NH65 from Km.40.000 to Km.221.500 in Telangana on EPC mode
CS for AE services for 4laning of(i)Thirumangalam Vadugapatti section from Km. 0.000 to Km 36.000 of NH744(PckgI) and (ii)Vadugapatti Therkuvenganallur section from Km36.000 to KM71.600 of NH744(PckgII) in Tamil Nadu on EPC Mode under BMP
Construction of Long Term Remedial measures of identified Landslide location i.e. Thalout Ch. 229.600 To Ch. 230.100 between PANDOH TO KULLU Section of NH 03 (Old NH 21) in the State of Himachal Pradesh under NH(O) on EPC mode
Construction of 8Lane access-controlled expressway starting after the end of Bridge over Hadaf River near Hathiyavan village with SH-152 near Matariya Vadi in Panchmahal (Ch.729.700-756.052) of Delhi-Vadodara GA on EPC Mode under BMP in Gujarat
Balance work of four laning of Gwalior Shivpuri from existing Ch. 215.000 (design Ch. 100.757) to existing Ch. 221.500 (design Ch.107.350) section of NH3 passing through Madhav National Park (Total length-6.593 km) in MP on EPC Mode basis.
Authority Engineer for Supervision of Rehabilitation and augmentation of New NH354 of Amritsar (airport junction) to Ramdas from km ASR 100.835 to km 139.965 for Length of 39.130 km into Four Lane under Bharatmala in Punjab (PackageIV) in EPC Mode
Construction of 2-lane road of Potin to Pangin section of NH-13 from Km 117.56to Km 163.59 (Package-4) on EPC Mode in the State of Arunachal Pradesh under Arunachal Pradesh Package of Roads and Highways of SARDP-NE
CS for AE for Supervision of Const of 4laning of NH 45 to Amjhar Road from km 38.400 to Km 98.950(Jabalpur Ring Road Pkg 3 and 4)under Bharatmala Pariyojna in the State of Madhya Pradesh on EPC Mode
Const of new Slip Service road at various locations L30.28 km LHS RHS and Flyover(2x30m)at Sawadgaon Phata(Km.310.380)on Dhule Pimpalgaon sec of NH60 Km. 261.720 to Km. 380.000 in Maharashtra on EPC mode under NH(O)
Construction of Balance Works in descoped section in the Village Amboda, Hiwara Sangam, Lonbehal, Dattarampur, Kinhi in four laning of Mahagaon-Yavatmal section of NH-361 from Km 320.580 to Km 400.575 in the state of Maharashtra on EPC mode
Development of six lane access controlled in Uttar Pradesh portion of Delhi Saharanpur Highway from Delhi/UP Border to EPE Junction (Ch.14.750 to Ch. 31.200) in Uttar Pradesh on EPC mode under Economic Corridor in phase1 of Bharatmala Pariyojana
CS for AE for Supervision of Development of Memmadpur Ambala Banur IT City Chowk Kharar Chandigarh Corridor under BMP Pkg-II 6 laning of IT City Chowk to Kurali Chandigarh Road Design length 31.23 Km in Punjab on EPC mode
Engagement of user fee collection agency on the basis of CB through e-tender at Raisinghnagar (Thakri) and Patroda Fee plazas located at km 102.500 and Km 163.000 of NH-911 under PhaseI of under BMP on EPC Mode Rajasthan
Rectification of Blackspots TN-03-069 (Thadakoil), Accident Spot (Kakkathoppu) and Blackspot TN-02-604 (Agaram Junction) by Construction of VUPs and Service Road in Karur to Dindigul Section of NH-44 in the State of Tamil Nadu on EPC Mode
CS for AE for Supervision of Development of 6 lane access control greenfield highway of Delhi-Saharanpur-Dehradun under BP from Design Chainage 56.500 Vill-Karaunda Mahajan to 119.790 Vill-Latifpur at Saharanpur Bypass in UP on EPC Mode Package-II
Permanent Rectification of Black Spot TN(02)69 and TN(02)514 by Constructing a Vehicular Underpass (VUP) (12mx5.5m) at Km 03 791 (Neikarapatti Junction) in the project of Salem - Kumarapalayam section in the State of Tamil Nadu on EPC Mode
Consultancy services for AE for Supervision of Four Laning of Natham-Tuvarankurichi section of NH-785E from Design Chainage 36.690 to 61.115 (Length-24.425 Km) under BP Phase-I (Feeder Route category) on EPC mode in the State of Tamil Nadu
Authority Engineer Services for Construction of underpasses at 7 blackspot locations in the project highway at specified locations from Ch. 23.600 to Ch. 149.900 of NH34 (Old NH91) from Ghaziabad to Aligarh on EPC Mode in the State of Uttar Pradesh