Loading…
Loading…
25,852 results • Best match
Design and Construction of Standalone 4 lane Vehicular Underpass with approaches at Sangamner Bypass End Junction Km150 200 and Wavi Junction Km163 900 on Khed Sinnar section of NH 60 Old NH 50 in the State of Maharashtra on EPC Mode
Supervision Consultant services during OM phase for Four Laning of NH709B from KM 92.200 (near Shamli) to km 155.025 (near Saharanpur) design km 61.409-km 124.181 (length 62.772 km) in the state of Uttar Pradesh (Package-II) on EPC mode
Construction of 8Lane AC expressway starting from MP-Gujarat Border near Chhayan village and ending after Bridge Over Hadaf River near Hathiyavan village (Ch.696.920 to 729.755) section of Delhi-Vadodara GA(NH-148N) on EPC Mode under BMP in Gujarat
CS for AE for Supervision of 4Laning of Amritsar Bypass Greenfield Alignment from New Tarn Taran Rd to Ajnala Rd and Upgradation of existing Amritsar Khemkaran Rd NH354 to 4Lane Configuration Pkg 3 in Punjab under BMP on EPC mode
Construction of 6 nos. of FOB at Km.34.500 (Badalpur), Km.42.800 (Dadri), Km.50.050 (Sikandrabad Industrial Area), Km.53.540 (Sikandrabad), Km.68.130 (Bulandshahr Dehat) and Km.83.100 (Khurja Dehat) on Ghaziabad Aligarh NH-34 in UP on EPC mode
Consultancy Services for AE services for 6-lane Flyover and approaches at the start of Muzaffarnagar Bypass (Km113.535) including widening of the existing 4lane-6lane highway from Km112.880-Km115.320 of the Meerut-Haridwar NH-58 on EPC mode in UP
Construction of Twin tube Uni directional Aizawal Bypass Tunnel of length 2.5 km and its approaches of 2.1 Km from Km 10.600 to Km 15.200 (Package 2) on Sairang Phaibawk section of NH 6 in state of Mizoram on EPC Mode
Permanent Rectification of Black Spots TN-(05)-037, TN-(02)-175, TN-(05)-040, TN-(02)-169 in Tindivanam to Ulundurpet Section of NH 32, 132, 38 (Old NH-45) in the State of Tamil Nadu on EPC Mode - 2nd Call
Construction of SVUP at Ch 20 650 Arangaon Village and Service Road on LHS from Ch 20 650 to Ch 21 580 on Ahmednagar Bypass section of NH 60 and NH-160 in the State of Maharashtra on EPC Mode
Deep Drilling, Development and Stabilization of Tube well upto 300 meters Below Ground Level by Direct Rotary/Reverse Rotary/Dual Rotary Method on EPC Mode At Lower Thather at Chedo di Chapri under WSS Upper Thather in District Jammu under SASCI
Constr Imprvt of Along - Yingkiong road between Km 40.00 to Km 65.00 Design Chainage Km 40.000 To 63.740 design length 23.740 Km for Constr and upgradation from Cl09 to NHDL Specn under 761 BRTF Project Brahmank in AP on EPC Mode
Consultancy Services for AE for supervision of Balance Work of four laning of Panvel-Indapur section of NH-66 (Old NH-17) from km 42.300 (Kasu) to km 84.600 (Indpaur) in the State of Maharashtra under BMP on EPC mode
Consultancy Services for AE for Supervision of Construction of 8 Lane ACE starting near Major Bridge on Mej River to Rajasthan MP Border section of Delhi Vadodara Greenfield Alignment NH-148N on EPC Mode under BMP in the State of Rajasthan
Construction of 4 lane VUP at km 39.960, flyover at km 40.320 and km 46.630 between km 39.300 to km 47.170 in Kurali-Kiratpur section of old NH-21 (new NH-205) in the State of Punjab on EPC Mode
CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF 6-lane Urban Extension Road UER 2 NH 344 M From NH 1 to Karala-Kanjhawala Road Km -0.700 to 15.000 of NH-352A at Village Barwasani Sonipat in Haryana ON EPC Mode
Construction LVUP on Six Lanning of Agra Etawah Bypass section of NH-2 from km 270.270 to km 270.830 and Construction of Foot Over Bridge at Km 274.055 in the state of Uttar Pradesh to be executed on EPC Mode
Permanent Rectification of Blackspot KA 02 345 by Constructing Vehicular Overpass VOP with Retaining wall at Chainage Km.374.200 and Service Road Chainage Km.374.000 Km. 375.600 on NH66 at KPT junction in the State of Karnataka under EPC mode
Construction of 6-lane Grade Separator at km.36.530 with LVUP at km. 36.894 including Approaches to Grade separator-LVUP from km.35.840-km.37.240 in Barhi-Hazaribagh Section(Hazaribagh Bypass) of the NH-33 in Jharkhand on EPC mode
Construction of 4 lane (expandable to 8 lane) access controlled Highway section of NH248S for the connectivity to proposed Vadhavan port (from Vadhavan Port to Tawa Village on NH 48) (Design length32.180Km) under NH (O) in Maharashtra on EPC Mode
Construction of 4lane Greenfield Highway from Chatrapur on NH 16 to Gopalpur port(Km 0.000 to km 4.500)and upgradation to 6lane elevated configuration of existing NH16(Km 429.025 to km 430.990)under BMP in Odisha State on EPC Mode
AE Services for 6 laning of existing 4 lane stretch of NH-44 on Nagpur-Hyderabad Section in Tel. under BMP on EPC Mode from Kallakal at Km.454.000 toGundlapochampally at Km 471.000 from Gundlapochampally at Km. 471.300 to Bowenpally 481.331
Construction of Four Lane Expressway from Sardar Patel ring road to Sindhrej Village of Ahmedabad District from km 0 to 22.000 of Ahmedabad-Dholera Greenfield Alignment (NH-751) in the State of Gujarat on EPC Mode under Bharatmala Pariyojana (Package
6 laning of existing 4 lane stretch from Kalkallu at km. 454.000 to Gundla Pochanpally at km 471.000 on Nagpur-Hyderabad section (Design length 17.000 km) of NH-44 in the state of Telangana under Bharatmala Pariyojana on EPC Mode
Construction of additional 3 lane with paved shoulder (design length 8.87 km) as realignment of Bakaner ghat (between Indore to Khalaghat Section from existing Km 59.190 to Km 66.120) of NH 52 (Old NH 3) on EPC mode in Madhya Pradesh
CONSULTANCY SERVICES FOR AUTHORITY ENGINEER FOR SUPERVISION OF CONSTRUCTION OF FOUR LANING OF PINJORE (END OF PINJORE BYPASS)-NALLAGARH SECTION (KM 4.200 TO 35.395) ON NH-105 (OLD NH-21A) IN HARYANA AND HIMACHAL PRADESH ON EPC MODE UNDER BMP
CS For AE for Supervision of Construction of 4 lane realignment of Old NH207 (New NH648) From TN/KA Border (Ch 0.000) To Hoskote (Ch 20.900) under BMP as a part of Bangalore Ring Road in Karnataka on EPC Mode
Construction 4lane Greenfield Amritsar connectivity of Amritsar with Delhi-Amritsar-Katra Exp. from Jun. with Kapurthala-Sultanpur Lodhi road (NH-703A) Isharwal village ch.24.000 to MDR Jun. at ch.40.900 Dhunda Village on EPC mode under BMP in Punjab
Consultancy Services for AE for supervision of Four laning of Aurangabad to Paithan section of NH-752E from design km 0.000 to design km 42.417 (42.417 km) in the State of Maharashtra to be executed on EPC mode under BMP
Construction of Balance Works in Tiger Corridor and Provision of Mitigation Measures Structures in Itarsi Betul Section of NH-69 (km 61.500 to km 67.380 km 80.940 to km 88.640 km 108.933 to 116.263) in Madhya Pradesh on EPC mode.
Up-gradation to Four Lane with Paved Shoulder configuration of the highway starting from existing km 88.400 (Savali Vihir) to km 163.400 (start of Ahmednagar bypass) (Design Length-75.000 km) section of NH-160 in Maharashtra under BMP on EPC Mode
Consultancy Services of AE for Construction of 6-Lane Patna Ring Road Highway NH-131G from Kanhauli to Sherpur from Km.0.000-Km8.480 including Junction Development with Bihta-Danapur elevated corridor App.length-1.5 Km on EPC Mode in Bihar L-9.98Km
Rebuilding of 2L ROB with 3L ROB at Rly km.20/201 between Guntur and Vejendla Stations of Guntur-Tenali Section at km.406.300 (LHS) of Chilakaluripeta-Vijaywada sectioni of NH-16 in the state of AP on EPC Mode.
AE Services for Construction of Four Laning of part of Ramban to Banihal Section of NH-1A including Construction of Twin Tube Tunnel (PKG I) PKG II AND PKG III in the UT of Jammu and Kashmir on EPC Mode
6 lane Flyover with approaches and Slip Road from km 0.000 to km 1.460 along NH 44 at Start of NH 530B Mathura Bypass at Existing km 154.200 of NH 02 (New NH 44) in Uttar Pradesh on EPC Mode Basis
CS for AE for Supervision of Balance work of 4Lane with Paved Shoulder configuration of the highway starting from km88.400 (Savali Vihir) to Km163.400 (Ahmednagar Bypass)(Length 75.000 km) section of NH-160 in Maharashtra under BMP on EPC Mode
Consultancy services for AE of Construction of balance work of two number of interchange at Jaipur ring road including supervision for Operation and maintenance of six laining of Jaipur ring road (km 0.300-km 46.700) on EPC mode (Total 53.272 km)
Consultancy Services for AE for Construction of Additional Structures Improvement of Service Road and Maintenance of Six Lane Gurgaon-Jaipur Section of NH-48 (old NH-8) between km 42.700 to km 107.100 in the States of Haryana on EPC Mode
CS for AE for supervision of construction of 2Lanes With or Without Paved Shoulders From Km 0.000 To Km 69.480 Of Sanquelim To Belagavi Section Of NH748AA in the state of Goa and Karnataka under Bharatmala Pariyojana on EPC mode
CS for AE for supervision of Construction of Elevated Corridor in Ranchi city from Km 0.00 to Km 3.260 of NH75 including down ramp on NH23 from Km 0.100 to Km 0.600 in the State of Jharkhand on EPC mode
Development of Six lane access-controlled highway from Design Chainage 8.130 near Mohand to 16.380 Daat kali Tunnel of Ganeshpur Dehradun section of NH-72A in the state of Uttar Pradesh and Uttarakhand under BMP on EPC mode (Package-2).
Consultancy Services for AE for Supervision of Construction of 4lane (expandable to 8 lane) expressway for the connectivity to proposed Vadhavan port (from Vadhavan Port to Tawa Village on NH48 (length 32.180Km) under NH-O in Maharashtra on EPC Mode
Construction of a 4 lane Western bypass for Jaunpur city connecting NH 731 at existing Ch. 223.200 Km to NH 135A (Eastern Bypass) at Ch. 107.780 Km. (total length 12.205 km) in the state of Uttar Pradesh on EPC mode
Construction of 6lane flyover (Size40 Nos. of 25m Span x 6m Height) including RE Wall approaches with Flexible Pavement in the Elephant Corridor of Angul Sambalpur sec of NH42(New NH-55)at Km.202.533 on EPC Mode in Odisha
Consultancy Services for AE for Supervision of Balance works of 4-laning of Fagne to Mah Guj Border section of NH-6 in the State of Maharashtra from km 510.000 to km 650.794 to be executed on EPC Mode under BMP.
CS for AE for Supervision of Improvement-Upgradation of Existing Two Lane Bypass to 6-laning from Km.403.100 (Design Ch.402.600) to Km.433.000 (Design Ch.433.200) of Hubli-Dharwad Bypass section of NH-48 in Karnataka on EPC mode
Construction of Foot Over Bridges providing and fixing of median guard rail pedestrian guard rail and widening of existing service road on Delhi Agra sec of NH-2 old (New NH-19) in the State of Haryana on EPC Mode
CS of AE for Supervision of Construction of Emergency Landing facility on NH Development of emergency landing facility on Balasore Kharagpur sec from Km 83.400 to Km 88.400(total 5 Km) of NH60(NewNH16) in West Bengal on EPC Mode.
CONSULTANCY SERVICES FOR AE FOR SUPERVISION OF Construction of Dwarka expressway from shiv Murti Intersection at km 20 of NH 8 till Rail under Bridge near Dwarka Sector 21 from km 0.800 to 5.300 Pkg-I in Delhi on EPC mode.
CONSTRUCTION/IMPROVEMENT OF LACHUNG-YUMTHANG-ZADONG ROAD (PART OF NH-310A) DESIGN CHAINAGE FROM KM 52.808 TO KM 81.203 (NET LENGTH 28.395 KM) FROM CL-9 TO NHDL WITH PAVED SHOULDER SPECIFICATIONS UNDER PROJECT SWASTIK IN SIKKIM STATE THROUGH EPC MODE
Removal of at-grade junction at Maker Bypass fork cross point towards Maker Bazaar on 2-laning with Paved shoulder of Chhapra-Rewaghat- Muzaffarpur section of NH 102 (New NH -722) in the State of Bihar on EPC Mode 2nd Call.