Loading…
Loading…
25,858 results • Best match
CONSTRUCTION OF 1X5 MVA 33/11 KV SUBSTATION, 33 KV LINE AND 11 KV LINE FOR PACHKHARI, DISTT.-CHANDAULI ON SEMI TURN-KEY
Design Fabrication Erection Maintenance and Dismantling of Punjab Pavilion on Turn Key Basis at Bharat Mandapam Pragati Maidan New Delhi for IITF 2024
various electric works on Turn-key Basis for electrification and strengthening of Infrastructure due to extension of Nagar Nigam area EUDD-1 Aligarh
Construction of Badi Kalmer Ghat on Gambhir river on Turn-Key Basis as per detailed scope of work but not limited to that.
Procurement of Plasma Enhanced Chemical Vapor Deposition (PECVD), Inductive Coupled Reactive Ion Etching (ICP-RIE-F) and required utilities on turn key basis
Desinfection drinking water of Saluru water supply distribution system on turn key basis from 1-5-2021 to 31-03-2022-Salur Municipality
Certain Civil and Sanitary repair works to the Govt Residential Quarter Nos: MC-385 to MC-388 at Malakpet Colony, Hyderabad.(Turn key) .
Desinfection drinking water of Saluru water supply distribution system on turn key basis from 1-4-2021 to 31-03-2022-Salur Municipality
Request for proposal for Setting up Primary Processing Unit for Ground Nut Turn Key Basis in the State of Andhra Pradesh (2018-19)
Construction of 500m 11Kv Covered Conductor from Pallimukku Mosque Transformer Point to Pallimukku Colony Transformer under Electrical Section Peyad on turn key basis
Construction of Line for Underground Cable of 11 KV feeder ementing from 132 KV Malwan on Turn-Key Basis under EDD-I, Fatehpur.
WORK FOR SHIFTING OF 11 KV LT LINE (COMPOSIT LINE) AND 11 ROAD CROSSING ETC UNDER TURN KEY BASIS IN EDD I FTP
Strengthening of 11 KV Feeder at 33, 11 KV Sub-station, Aurangabad under EUDD-I ,Mathura on Turn-key basis (Under Business Plan).
SUPPLY, INSTALLATION, COMMISSIONING OF ICT LAB AND RELATED HARDWARE ON TURN KEY BASIS INCLUDING TRAINING FOR STAFF AT VV GOVT PG COLLEGE JALORE
EPC contract for development of 40 MW Capacity Solar Power Project and associated 220 KV Transmission line for connectivity at 220 KV OPTCL Transmission System through LILO Provision along with comprehensive O and M for 05 years at Odisha.
Execution of 5 Nos Individual RPWS Project pertaining to 17GP of Tangi Block 06GPs of Bhubaneswar Block 09GPs of Bhubaneswar Block Balipatna Block 16GPs of Balianta Block of Khordha District including 5 years Operation and Maintenance on EPC contract
Renovation of WTA of Phulberya Major State RLI(E) on Turn Key basis (i.e including supply of PVC Pipes, MS/GI materials, Renovation of Pump House and Internal wiring of pump House) (Mouza- Phulberya, JL No.278 Plot No. 01) under Manbazar II
Construction of Western Regional Center of Indian Institute of Mass Communication (IIMC) at Badnera, Amravati including Consultancy services for preparation of Master Plan (LOP), Architectural drawings, Submission Drawings for local body submittals ... on Engineering Procurement and Construction (EPC) ... ( EPC ) ... (EPC) basis .
SUPPLY OF PSA Oxygen Generation Plant on Turn Key Basis (Approximately 610 Numbers of Type D Cylinders per day) FOR CSM HOSPITALS THANE MUNICIPAL CORPORATION THANE.
Two Lane Major Bridge (with Footpath) over River Ganga along with Approaches, additional Approaches and Protection works at Rampur Ghat to Connect District Mirzapur with District Bhadohi in District Mirzapur
Construction of Betwasa Barrage across Dohi river near village Betwasa Tehsil Jobat, Distt. Alirajpur on turn key basis as per detailed scope of work but not limited to that.
Re-development of Safdarjung Railway Station along with Office Building near Moti Bagh at New Delhi on Engineering Design, Procurement and Construction (EPC) basis including Operation and Maintenance for 1 year during DLP Period
Execution of DG Infrastructure, Supply and Laying of Power Cables, Electrical Installations and Associated Civil Works for BFL System along Indo-Bangladesh Border in Mizoram, on EPC basis. From BP No 2359 to BP No 2360 (17.88 km), PKG-V
Execution of DG Infrastructure, Supply and Laying of Power Cables, Electrical Installations and Associated Civil Works for (BFL) System along Indo-Bangladesh Border in Mizoram, on EPC basis. From BP No 2357 to BP No 2359 (20.70 km), PKG-IV
CONSTRUCTION OF GURU RAVIDAS BHAWAN AND MUSEUM AT KURUKSHETRA, HARYANA ON DESIGN ENGINEERING PROCUREMENT AND CONSTRUCTION EPIC BASIS AS DEPOSIT WORK OF ARCHAEOLOGY AND MUSEUMS DEPTT HARYANA
Strengthening to Bramhapuri - Wadsa - Kurkheda - Korchi - Deori - Amgaon Road in NH 543 in Km 3/200 to 5/150 , km 6/350 to 7/150 , 12/00 to 19/500 km 28/00 to 35/00 and km 45/00 to 50/00 in the State of Maharashtra on EPC Mode .
Construction of 401 Bedded Girls Hostel ( G Plus 5), Academic Block (G Plus 3) Hostel for Married Research Scholar Cum Project Employees (Lower Ground & G Plus 3), Utility & ESS Block with development of site including E&M services at IIT Mandi ... in EPC mode I ...
Strengthening under Annual Plan for the year 2019-2020 from km 316/00 to km 330/00 and from km 345/00 to km 350/00 (total length-19km) of NH-15 under Nagaon NH Division in the State of Assam on EPC Mode, Job No 015/As/2019-20/194
Periodic Renewal to NH-315(New)/NH-38(Old) from Ch 4.86 Km to 20.00 km and 53.00 km to 56.35 km (L - 18.49 km) for the year 2021-22 under Dibrugarh NH Division in the State of Assam in EPC mode (Job No. TA-315-AS-2021-22/265)
ENGAGING TECH CONSULTANT FOR (FS) AND (DPR) ON EPC MODE FOR CONSTR OF RD GELEMO-PUKAR LA (NEW ALIGNMENT) FROM KM 0.00 TO KM 25.00 (NET LENGTH 25.00 KMS) GREEN FIELD ALIGNMENT TO NHSL SP THE AOR OF 128 RCC UNDER 23 TF (P) ARUNANK IN THE STATE OF A.P
Reconstruction of minor bridge at Km 0 225 on Solapur Yedeshi section Km 0 00 to Km 100 00 of NH 211 and Junction of NH 211 Solapur Yedshi and NH 65 Pune Solapur Package II in the state of Maharashtra on EPC mode at the risk and cost of Concessionair
Cons. of 30 m wide Peripheral Road from Point C B to A1 Ch.8.00 Km to 10.5 Km. ESB wall of Airport in Jewar YEIDA and cons. of 30m wide PeripheralRoad from Pt. B to K Ch. 9.85 to 14.55 ESB wall of Airport in Jewar YEIDA on EPC Mode.
Up-gradation to four lane/ two lane with paved shoulders configuration of Kaylan - Murbad - Malshej Ghat - Nirmal Road NH- 61 km 15/200 to Km 38/00 and from Km. 58/00 to Km 84/00 (design length 48.55 km) of NH-61 on EPC Mode in Thane District in the
Valley side protection works from Ch. 25.80 km to km 26.65, km 26.75 to km 27.20 and 27.41 km to 27.48 km to restore damages by flash flood in 2023 of NH-10 under National Highway Division -IX in the Dist. of Kalimpong on EPC mode - 2nd call, Job-548
Construction of 4 Laning of part of Ramban to Banihal Section of NH-1A (Now NH-44) from Ch.154.210 to Ch.158.650 (NB) and from Ch.155.940 to Ch.160.260 (SB) including construction of twin tube tunnel (PKG-I) in the UT of Jammu and Kashmir on EPC Mode
Construction of 4 lane ROB and its approaches at km 14/800 (Jerai) on NH 26A in lieu of existing level crossing No. 19 on Katni Bina section Railway chainage 1034/5-6 on Sagar Khurai Bina road of Sagar Dist in the state of Madhya Pradesh on EPC Mode
Periodic Renewal from Km 18.800 to Km 28.550 and Km 37.950 to Km 48.550 on NH-6 (New)/ NH-154 (Old) (Total Length - 20.350 Km) under ARP for the year 2021-22 under Karimganj NH Division in the state of Assam in EPC mode. Job No 154/AS/2021-22/229
UPG. TO 2-L WITH PAVED SHOULDER FROM DESIGN KM 36.300 (EXT KM 36.300) TO DESIGN CHAIN 47.918 (EXT KM 48.700) AND FROM DESIGN CHAIN 69.900 (EXT KM 69.550) TO DESIGN CH. 83.940 (EXT KM 83.870) OF NH-248A STATE OF RAJ. ON EPC MODE NH-248A/RJ/23-24/830
Stage strengthening to NH-53 (Silchar Badarpur section) from Km 3.65 to Km 6.25 and NH-54 at 21st km, 27th km to 30th km, 35th km, 36th km and 40th km in stretches for 2019-20 on EPC mode under PWD, NH Division, Silchar in the state of Assam
Design and Construction of i VUP at Km 47 150 Khed Bypass End Junction ii VUP at Saykhindi Phata at Km 153 880 and iii VUP at Nandurshingote BP End Junction at Km 165 430 on Khed Sinnar section of NH 60 in the state of Maharashtra on EPC Mode
ENGAGING TECHNICAL CONSULT FOR PREPARATION OF FS DPR ON EPC MODE FOR CONST RD TAPA-KARU-SERING-BAGAN (NEW ALIGNT) KM 0.00 TO KM 68.00 (NET L 68.000 KM) GREEN FIELD ALIGNT TO NHSL SPECIFICATIONS IN AOR OF 85 RCC UNDER 756 TF P ANK IN THE STATE OF A. P
Construction of diversion road to distressed bridge at Km 1 800 of NH 353B of Adilabad Bela section in Telangana in the work of Widening to 2 L with PS from Km 0 to km 32 970 of Adilabad Bela section of NH 353B in Telangana on EPC Mode 2nd call
Strengthening work of Road from km 73/4 to 81 Km 83 to 92, 95 to 97.300, 99,100, 104, 105 107, to111, 113, 114, 117 to 119 and 123 Total Km 36.70 of NH- 12A Extn (New NH-539) Shahgarh- Tikamgarh Road on EPC mode in the state of Madhya Pradesh
SSI, DESIGN AND CONSTN OF 216.00 M (3 x 72 M) SPAN MAJ PMT BR OVER GALETHIYA RIVER AT KM 46.45 (INCL BOTH SIDE APPCH ROAD) ON NORTH-SOUTH ROAD OF GREAT NICOBAR ISLAND IN A AND N ISLAND (UNION TERRITORY) UNDER 46 BR(I)TF PROJECT PUSHPAK ON EPC MODE
CS For AE For Supervision of balance work of 4-laning of Indore Gujarat/MP Border from km 106.210 to km 115.250 km 121.740 to 127.140 and Forest portion km 149.800 to km 150.850 km 158.250 to km 158.850 of NH-47 (Old-59) on EPC Mode in Madhya Pradesh
Permanent Rectification of Black Spot TN-02-078 by construction of 2 Flyovers at Entry and Exit of Hosur New Bus Stand location at Km.43.400 and SVUP at Km.43.900 in Hosur Krishnagiri section of NH-44 (Old NH-7) in the State of Tamil Nadu on EPC mode
Permanent Rectification of 05 Nos. of Blackspots TN-02-282, TN-02-083, TN-02-162, TN-02-232, TN-02-292 by Constructing VUP, LVUP, and FOBs in Madurai to Kayathar section of NH-44 (Old NH-7) in the State of Tamil Nadu on EPC mode (2nd Call)
CONSULTANCY SERVICES FOR IE DURING O AND M PERIOD FOR 2L PS GADU-POR SECT OF NH51 FROM KM287.43 TO KM379.1 ON HAM IN THE STATE OF GUJARAT INCL SERVICES FOR AE DURING CONST OF 2L TO 4L OF MADHAVPUR-PORB SECT OF NH51 FROM KM338.4 TO KM379.1 ON EPC MODE
CS for AE for Supervision of 4laning of Indore to Raghav Garh section of NH 59 (Indore-Harda Pkg 1 stretch) from MR-10 Junction on NH-3 Bypass Ch.0.250 to Raghav Garh Ch. 26.903 (Design Length 26.653 Km) under BMP Phase-I (EC) in MP on EPC Mode
Widening and Strengthening Reconstruction to 2 L Paved Shoulder 2 L paved shoulder with service road from km 0 00 to km 42 250 excluding design Ch 03 220 to 04 200 and 28 350 to 29 060 Pkg I of NH 320G in the state of Jharkhand under EPC mode