Loading…
Loading…
25,858 results • Best match
Balance work for improvement to 2 lane with PS in realignment from Km 52.320 to Km 52.940 of NH81 Protection works in HL Bridges at Km 33 and Km 36 for the approach of Mahananda River and recons. of culvert in 30th km of NH81 on EPC mode in Bihar.
Rehabilitation and Up gradation of Polekuru - Komaragiri section from Km 59/800 to Km 70/400 (Design Chainage from Km 63/540 to Km 74/165) of NH-216 )(Old NH-214) to two lanes with paved shoulders on EPC mode under NHDP Phase IV in the State of AP
Balance work of Construction of 2lane ROB and its approaches at Km 36/800 (Jarua) on NH-26A in lieu of existing level crossing no. 11 on Katni-Bina Railway line on Railway ch 1011/6-7 on Sagar to Bina Road in the state of Madhya Pradesh on EPC mode.
Planning, design and construction of 150 bedded critical care hospital block building at AIIMS trauma centre New Delhi including all civil and MEp services, hospital serbvices, horticulture and development works on EPC Mode 1 basis. SH Providing inspection vehicles for AE civil CAPFIMS project Divsion II CPWD Vidyut bhawan, New Delhi.
Planning, design and construction of 150 bedded critical care hospital block building at AIIMS Trauma Centre for AIIMS, New Delhi including all civil & MEP services, hospital services, horticulture and development work on EPC Mode-I basis. (SH: Providing Inspection Vehicles for CAPFIMS Project Division -II CPWD Vidyut Bhawan New Delhi).
C/o Centre for Disability Sports at Gwalior (MP) through EPC mode. (SH:- Providing services of Two Nos. Computer Operator, One No. Chowkidar and Two Nos. Peon for day to day functioning up-keeping and maintenance of records of the Gwalior Project Division, Sub-Divisions, CPWD at Gwalior) (3rd Call)
Construction of New Building for Integrated Facilities of Office Training Complex for ISTM and Office Accommodation for DoPT at Old JNU Complex, New Delhi under EPC Mode-I (SH: Repair and Maintenance of Surrounding Area and Staff Toilet at O/o CE&ED, DPZ-2, Old JNU Campus, New Delhi)-Recall.
Construction of New Building Project at central University of South Bihar, Panchanpur, Gaya on EPC mode. SH: Providing and Laying of irrigation water supply From STP to T-III/T-IV Residential Building including valve, fittings etc. for gardening around type-III and Type-IV Residential Building at CUSB, Gaya.
Construction of New Building for Integrated Facilities of Office Training Complex for ISTM and Office Accommodation for DoPT at Old JNU Complex, New Delhi under EPC Mode-I (SH: Hiring of Inspection Vehicle for Official Use of the Executive Engineer & Senior Manager and Assistant Engineer, IIT Project Division-1, CPWD).
Const of Foot Track from Sarli to Semai from Km 22.467(Milli) to Km 54.873(Semai) Km 22.467 to Km 54.873) (total length 32.406 Kms) for 54th Battalion ITBP in the Kurung Kumey district under 119 RCC/756 TF of P ANK in the State of A.P on EPC Mode
Construction of two no. of new RCC minor Bridge 3x18.84 m and 3x5x4 and 3 nos of new box culverts 2 nos 1x3x3 and 1 no 3x3x3 in place of old bridge and culvert at various chainage in NH 33 old nh 110 on epc mode in the State of Bihar
Widening to 4 lane of missing link between NH40 and NH69 from existing chainage Km 351/460 to Km 358/260 (Design Chainage 351/460 to 358/130 (6.67 Km)) of NH40 as continuation of NH40 in the state of Andhra Pradesh under NH(O) in EPC Mode 2nd call
Survey, Investigation, Designs, and Build Water Supply Improvement Scheme to achieve 135 Lpcd in Agartala Municipal Corporation Area (Usha Bazar) and Operate And Maintain O and M the Built System For 5 Years Under AMRUT
Survey, Investigation, Designs, and Build Water Supply Improvement Scheme to achieve 135 Lpcd in Agartala Municipal Corporation Area (Panchamukh) and Operate And Maintain O and M the Built System For 5 Years Under AMRUT
AS PER NIT
Construction of Chuliya Barrage across Panchi river near village Chuliya Tehsil Jobat, Distt. Alirajpur (M.P.) on turn key basis as per detailed scope of work but not limited to that.
Work for shifting of lines and other associated work during road widening of Jahanabad-Amauli-Chandpur-Jaferganj and Joniha on Semi Turn Key Basis under jurisdiction of EDD-II Fatehpur
Work for shifting of lines and other associated work during road widening of Pukhraya Ghatampur Bindki Road (Bindki-Bakewar) on Semi Turn Key Basis under jurisdiction of EDD-II Fatehpur
Construction of Kaluwat Barrage across Hathni river near village Kaluwat Tehsil Jobat, Distt. Alirajpur (M.P.) on turn key basis as per detailed scope of work but not limited to that.
Construction of Battisdi Barrage across Idar River near village Battisdi Tehsil Manasa Distt. Neemuch (M.P.) on turn key basis as per detailed scope of work but not limited to that.
Execution of 02 Nos Individual Rural Piped Water Supply Project pertaining to 31GPs of Ranpur and 36GPs of Odoagaon and 6 GPs of Ranpur Block in Nayagarh District including 5 years Operation and maintenance on EPC contract under the one package
Turn Key Contract For Development Of Distribution Infrastructure For Providing Grid Connectivity To Villages Earlier Electrified Through Off-grid (mini Grid Plant And Standalone System) Of West Champaran District Of Nbpdcl Under Revamped Distribution Sector Scheme
ComprehensiveIntegrated Consultancy Services/ Project Monitoring consultant for Construction of Government University Saharanpur on EPC Mode
Setting up of BSL-2 Drug Laboratories on EPC Basis
Development of Additional Campus for NIT Patna on EPC basis
Replacement Of 11kv Faulty Ab Cable By Rabbit Conductor In Nannalii Of Kumta Subdivision Of Honnavar Division On Total Turn Key And Lumpsum Basis.
Reconductoring of 9Nos of 11KV lines for a distance of 29.34 RKms in Raibag Sub Division of Raibag Division on Total turn key basis.
Reconductoring of 25 Nos of 11KV lines for a distance of 85.92 RKms in Laxmeshwar Sub Division on total turn key and lumpsum basis
Shifting of Electric Pole of Saurikh-Paror-Daulatabad Road for widening of Road in Distt.-Kannauj on Turn-key basis (Under Full Deposit Scheme)
The work of New Connection of Sri Kashi Vishwanath Temple for 2000 KVA Laod under EE, UEDD-III, Varanasi on Semi Turn Key Basis
Reconductoring of 9 Nos of 11KV lines for a distance of 62.13RKm in Ugar Sub division of Athani Division on total Turn key basis.
Work of Installation of Additional New Distribution T/F on semi turn-key basis under B.P. 2025-26 in the area of EDD-Sakaldiha.
Supply and Installation of Bird Flight Diverters on overhead 33 KV lines falling in GIB Arc area of Jaisalmer circle on turn key basis
Design Supply Installation and Commissioning of Digital open standard VHF Wireless DMR TIER II System with accessories on Turn key Basis for District Bharatpur
Design, Engineering, Supply, Erection Installation, Commissioning and Operation of 400KLPD Capacity Effluent Treatment Plant on turn-key basis at Malappuram Dairy under MRCMPU Ltd.
For the work of 11 KV R.M.U. (Ring Main Unit) in Buisness Plan (Part-2) on Semi Turn-key Basis under EDD-2 Agra.
On Turn Key Basis Construction of jalhali minor tank project (with canal) as per details in scope of work but not limited to that.
Miscellaneous System Strengthening Work under Additional Business Plan 2023-24 (339 Crore) in the area of EDC-II, Mathura on Semi Turn-Key Basis
Construction of BPHU at JALAH BPHC in (in Jalah CHC) in Baksa District for FY 2022 23 under PM ABHIM on Turn Key Basis
Renovation and Upgradation of existing space including Equipment/Gadgets therein for establishing TV/AV Studio on Turn Key basis at Doon University, Dehradun, Uttarakhand
CONSTRUCTION OF BUIDINGLESS SUB HEALTH CENTRE AT KACHUTALI IN KAMRUP M DISTRICT UNDER PMABHIM FOR FY2021-22 UNDER NHM ASSAM ON TURN KEY BASIS
Work of Capacity Enhancement of Distribution T/F on semi turn-key basis under B.P. 2025-26 in the area of EDD-IInd, Mughalsarai.
Renovation of toilet, providing cupboard and internal colouring to Staff Quarter No.2/B at Old MLA Quarters, Hyderabad. (Turn key basis) (2nd call)
Renovation of attached toilets and other civil works in the family Quarter No.508, MS-II at Old MLA Quarters, Hyderabad.(Turn key basis)
Renovation of toilets in Hon'ble Chief Minister room and Secretary to State Legislature's room toilet in the p/o TLA, Hyd. (turn key basis)
SR for certain civil and Sanitary repair works to flat no A 504 , A block of 224 flats at Malakpet colony , Hyderabad (Turn key)
Quarter maintenance for attending normal and emergent water supply and sanitary repairs works in the p/o.New MLA Quarters, Adarshnagar, Hyd. (Turn key basis)
Districtwise Implementation of LED Street Lighting System in one Village of each Gram Panchayat GP of Jharsuguda District in Odisha on Turn-Key basis
Retrofitting of 40 LPCD PWS Scheme to 70 LPCD to village Mohiskudar under JamdaBlock in the District of Mayurbhanj on turn key basis(JJM)
CREATION OF 25 KVA SUB-STATION ALONG WITH ALLIED HT/LT FOR BOREWELL OF SERICULTURE DEPARTMENT AT BABAPORA SHOPIAN ON FULL TURN KEY BASIS