Loading…
Loading…
25,858 results • Best match
Design, Construction, Supply, Testing, Commissioning of Water Supply Schemes with Electric Driven Pumps in Left out PRD Habitation\ Wards in Jamui Districts of Bihar on turn-key basis with 3 months Trial Run under Mukhya Mantri Nishchay Yojna on ... on Turn Key basis ...
Construction of 6-Lane Underpasses (3 Nos) and allied works on Existing 4 Lane Hyd to Blr Sec of NH-44 from km 99.700 to 187.300 in the State of TG on EPC Mode, as part of Long-term Rectification of MoRTH Identified Black Spots TG-03-71, TG-05-39
Reconductoring 37.071 Kms of existing 11 KV OH Line using Covered conductor HT AAAC 99 sqmm (Package No.6)-Turn key contract
Design, Construction, testing and Commissioning of office building with data centre (Uptime Institute Tier-IV Certified) for Punjab National Bank at Plot No 84, Sector 18, Gurugram, Haryana including all Civil and MEP services, horticulture and ... on EPC basis . ...
ENGAGING AUTHORITY ENGINEER FOR THE PROJECT HIGHWAYS ON AJMER-NAGAUR SECTION KM 0.00 TO KM 148.25 ON NH89 (NEW NH58) AND NAGAUR-BIKANER SECTION FROM KM 161.0 TO KM 269.26 ON NH89 (NEW NH62) ON EPC BASIS IN THE STATE OF RAJASTHAN
Consultancy Services for AE for Supervision of Widening of existing 2L with PS road to 4L with PS Bathalapalli to Mudigubba Section from Design Ch. Km. 96.300 to 129.300 incl. Bathalapalli Bypass of NH42 in the State of AP through EPC basis
Four laning of Ambala-Kaithal section of NH-152 from Km 0.000 to Km. 50.860 in the State of Haryana under NHDP Phase-III on EPC basis (Package-1) Rectification works at the risk and cost of the Contractor at various locations.
SDPE of DPR and Execution of works related to Laying of Sewage Line Network from different Toilet Blocks/establishments of Sanjichhat area and connecting the same by installing 600KLD STP based on MBR technology on EPC Basis including O and M for 5yr
Investigation detail design, construction of smart trunk infrastructure with roads ,storm water drains , water supply network ,utility ducts , for power ,reuse water line,pedestrian tracks,cycle track,avenue plantation &street furniture etc on EPC basis...
Consultancy services for Authoritys Engineer for Supervision of Work of Imp. and up-gradation of newly declared NH, NH-227B (84 Kosi Parikrama Marg)PkgIII, Design Km 47 800(Gosaiganj)to Km 73 300 (Bikapur) on (EPC) basis in the State of U.P.
Improvement and up-gradation of newly declared National Highways NH-227B (84 Kosi Parikrama Marg) Pkg III, Design Km 47 800 (Gosaiganj) to Km 73 300 (Bikapur)in the state of Uttar Pradesh on (EPC) basis in the State of Uttar Pradesh.
Improvement and Up-gradation to two Lane with Paved Shoulder configuration from existing Km 420.000 to Km 454.000(Design length Km 420.000 to Km 454.643, Design length 32.543 Km)of NH730(Shohratgarh to Uska Bazar)in the state of U.P. on(EPC)basis.
CONSTRUCTION OF BALANCE 03 NOs OF MAJOR/MINOR BRIDGES AT KM.327.545 KM.411.105 and KM. 415.865 and 01 VUP AT 416.685 AND 2LANE CROSS FLYOVER AT KM. 413.830 ON EXISTING 4LANING OF BAREILLY SITAPUR OF NH24 ON EPC BASIS IN UTTAR PRADESH.
CS for AE for Supervision of Construction of 6 lane flyovers at Boragaon Gorchuk Lokhra Basistha Junction along with 6 laning of approaches from section Ch. Km 146.172 to Km 162.620 on Guwahati Bypass NH37 in Assam under BMP on EPC basis
Diversion of NH 30 stretch from Km. 114.020 Design Km.0.000 to Km. 116.476 Design Km. 3.315 for taking up VK open cast mine project in Kothagudem SCCL area in Bhadradri Kothagudem district Telangana to Two lanes with paved shoulder through EPC basis.
Design and Construction of retaining wall along the edges of ROW up to required height with defect liability period of four years (after successful completion of infrastructure work) at Tumakuru Node, phase-A activation area under Chennai Bengaluru ... on EPC basis
Construction of (G plus 5) 200 Bedded ESIC Hospital at Beltola, Guwahati, Assam, i/c internal and external civil, electrical and Mechanical services and external development work on EPC basis. SH: Providing running inspection vehicle with driver for ADG, Region - Guwahati, CPWD, Guwahati.
Site development and the construction of Girls & Boys hostels at the Extension Campus of NIT Uttarakhand at Srinagar, Garhwal (Phase-1) including maintenance for three years on EPC basis. (SH : Development of parking area in front of NIT Recreation Block and Miscellaneous work).
Site development and the construction of Girls & Boys Hostels at the Extension Campus of NIT Uttarakhand at Srinagar, Garhwal (Phase-1) including maintenance for three years on EPC Basis. (SH : Repair and maintenance of defective work executed by M/s Arsh Constructions).
Construction of (G plus 5 )200 Bedded ESIC Hospital at Beltola, Guwahati (Assam), including internal and external civil, electrical and mechnical services and external development work on EPC basis, SH: Providing Computer services for O/o Chief Engineer (Ghy), CPWD, Guwahati- 35.
Construction of Basement Plus Ground Floor Plus 10 Storied Building for State of the Art, Director General, GSI Office at Plot No. GN-40, Sector-V, Salt Lake, Kolkata. including Civil, Electrical & Mechanical and Horticulture works/Services on EPC Basis...
Construction of G plus five 200 Bedded ESIC Hospital at Beltola, Guwahati, Assam i/c internal and external Civil, electrical and mechanical services and external development work on EPC basis. SH Providing running inspection vehicle with driver for ADG Region Guwahati, CPWD Guwahati.
Site development and the construction of Girls & Boys Hostels at the Extension Campus of NIT Uttarakhand at Srinagar, Garhwal (Phase-1) including maintenance for three years on EPC basis. (SH : Construction of 1 No. Tubewell including boring at NIT campus, Srinagar (Garhwal), Uttarakhand).
upgradation of Guhaghar Chiplun Helwak Road from existing Km. 00.00 to 26.890 . 40.610 to 54-260 sh78 Design Km. 00-000 to 26-230 . 40-00 to 53-600 two lane with paved shoulders on EPC basis in the State of Maharashtra
Construction of 84 nos. T III, 28 nos. Type IV and 28 nos. Type V Quarter including Internal EI and Fans Fire Fighting Fire Alarm System and Development work at AIIMS Raebareli UP on EPC basis. SH-Hiring of inspection vehicle Work Contingencies
Construction of Khadi Textile, Rural Chemical Bio Processing Department, Auditorium Building, Rural Craft Engineering Rural Energy Infrastructure Building and Allied Works Including Internal Services, Associated External Development Works Along with ... ( EPC ) ... (EPC) Basis .
Construction of 1377 bedded Boys Hostels (G plus 5) i/c Mess Student Activity Centre Warden Residence (G plus1), Workers Dormitory (G plus 5), utility block, including E and M Services, development works and Horticulture works including Defect ... in EPC mode 1 ... in EPC mode 1 ...
Design, survey, manufacture, supply, erection, testing, commissioning of 10 kWp and 5 kWp Solar Photovoltaic Power Plant at Block Offices etc. on turn-key basis throughout the state of Tripura as per DNIe-T
Turn Key Contract For Design, Engineering And Construction Of New 33 Kv Lines At Six (06) Locations Under Electric Supply Circle, Samastipur, Nbpdcl Under O&m Capital Head Scheme.
Construction of SAS Based 220/132/33kV Substation Anandnagar, Maharajganj on Turn-key basis
Dismantling existing VCBs and installing new RMUs on Turn-Key basis
Survey, design, manufacture, supply, erection, testing and commissioning of Solar Photovoltaic Water Pumping Systems and CWPP including creation of water source on turn-key basis in Tripura as per DNIe-T
DESIGN, SUPPLY, INSTALLATION, TESTING COMMISSIONING OF CETP STP ETP 200 KLD AT STATE CANCER INSTITUTE, JAMMU ON TURNKEY BASIS.
Construction of 2280.30 KM Lateral & Axial Roads in the State of Punjab and Rajasthan along the Indo-Pakistan Border (EPC Mode). SH: Construction of Lateral Road (Length 21.480 Km) along Indo-Pak Border in Gurdaspur sector under Punjab frontier, including 05 years defect liability and 05 years maintenance period, Package-I (b)
CONSULTANCY WORK FOR VALUATION STRUCTURE FOR THE WORK UPGRADATION TO 2 L - PS FROM KM 36/300 TO KM 47/918 AND FROM CH 69/900 TO CH 83/940 OF NH-248A IN THE STATE OF RAJASTHAN ON EPC MODE UNDER ANNUAL PLAN 2023- 24. JOB NO.NH-248A-RJ-2023-24-830
Strengthening of km 411/000 to 419/900 and from 420/000 to km 437/000 of NH-52 (New NH-15) under Annual Plan for the year 2019-20 on EPC mode in the State of Assam. (Job No. 052/AS/2020-21/210) Estimate under Contingency for Road Safety Provision reg
PR from ch. 350/000 km to ch. 365/000 km and from ch. 408/000 km to ch.412/000 km of NH-15 (Total Length - 19.00Km) under Annual Renewal Plan for the year 2021-22 in the State of Assam on EPC Mode. Job. No-15/AS/2021-22/232
CONST/IMPRO/WIDENING OF ROAD TALIHA -NACHO FROM KM 23.400 TO KM 42.790 KM 64.641 TO KM 67.205 (NET LENGTH 21.954 KM) UNDER PKG-2 FROM CL-09 TO NHDL SPECIFICATIONS EPC MODE UNDER 77 RCC/ 23 TF/ P ANK IN A. P (JOB NO D-BR-I/02/ARK/2022-23)
Design, Supply, Construction, Test and Commissioning of 800 mm dia DI-K9 Pipe line from Mydukur to MIP Kopparthy duly tapping at Mydukur on existing RTPP water supply line in YSR Kadapa District including O&M for 3 years (DLP 2years + 1year O&M from ... under EPC mode )
Periodic Renewal from Km 24 (Bardolguri), 25, 30, 37, 51 to 56, 64,82(150m), 83 to 86, 98 and 110 to 135 (Mission Chariali) of NH-15 under APR for 2022-23 under EPC Mode under Rangia NH Division in the State of Assam. Job No. TA-15/AS/2022-23/269.
PR from km. 315.315 to km. 325.000 and from Ch.325/000 Km. to Ch.344/000 Km. of NH-37 (New NH-715) under Annual Renewal Plan for the year 2021-22 under Nagaon NH Division, Nagaon in the State of Assam on EPC Mode. Job No-37/AS/2021-22/230.
Strengthening selected stretches from Km 1/2 to Km 23/6 (9.50 Km) of NH-81 and Strengthening selected stretches from Km 6/0 to Km 23/0 (1.8Km) of NH-181 including junctions improvement at Km 6/0 to Km 6/4 of NH-181 on EPC mode in the Tamil Nadu
Construction of Flyover/VUP on Ajmer-Nagaur Section of NH 89 (New NH-58) (i) Tehla at km 38/240, (ii) Kuchera Bypass at km 116/450 and (iii) Development of Junctions on NH-89 (New NH-58) from Km. 0/000 to 148/250 in the state of Rajasthan on EPC Mode
Strengthening of road in Km.137/000 to Km.160/000 (Work portion Km 137/000 to Km 147/000, Km 150/000 to Km 152/800, Km 156/000 to Km 160/000) of NH-160A Sinnar - Ghoti -Trimbakeshwar - Palghar Road in the state of Maharashtra (2nd call) on EPC mode
CONS OF ROAD K-N-S FROM EXISTING TRACK TO NHSL SPECS FROM DESIGN CHAINAGE KM 20.000 TO KM 38.765 (TAKEN KARZOK AS KM 0.000) INCL TWO MAJOR BRIDGES OF SPAN 400 MTR (50 MTR x 8) AND 275 MTR (55 MTR x 5) UNDER PROJECT HIMANK IN LADAKH (UT) ON EPC MODE (
O and M of Barabanki to Jarwal of NH-28C (New NH-927) from Km. 0.0 to Km. 42.546 with 2-lane PS on EPC Mode and Improvement of Black Spots from Km. 0.0 to Km.152.847 of Barabanki to Rupaidiha Section of NH-28C (New NH-927) in the State of UP
Providing laying of Optical Fiber Cable from km 0.000-km 59.100 of DND-Faridabad bypass KMP and km 0.000-km 31.100 of GFC to Jewar IA from DND-FBD-Ballabhgarh Bypass KMP Link and km 0.000-km 697.220 of DVE on EPC mode in Delhi UP HR Raj. and MP PKG-I
DESIGN AND CONST OF FLYOVER INCL APPR AND SERVICE ROAD AT SANGRAMA CHOWK FM EXIST CH KM 42.780 TO KM 43.440 DESIGN CH KM 44.294 TO KM 44.958 PKG-1C ON SRINAGAR-BARAMULLA-URI ROAD NH-1 UNDER 760 BRTF IN THE UT OF J K UNDER PRO BCN ON EPC MODE
C/o. Lecture Hall Complex (G plus 1) floors on EPC Mode-I with civil and electrical works at HCU, Hyderabad. SH: Providing services of 1 No Computer operator at Sub-division, HYD-III/1, GPRA Campus, Gachibowli, Hyd and Care taking attendants for the Guest House located at GPRA Campus, Gachibowli, Hyderabad