Survey Soil Testing Design Supply and construction installation and commissioning of STP 1 MLD capacity with MPS capacity 1 MLD based on SBR including other appurtenant works on turn key basis including OM for period 60 months IFP Nawan Shahar
Construction 54 Nos. of 125 mm dia x 115 mm dia x 70 Mtr . Deep Drilled tube well etc Turn key basis under 10-10 T/Well in each Panchayat under State plan in Village of Saraikela- Kharsawan District. Group-1
Construction 50 Nos. of 125 mm dia x 115 mm dia x 70 Mtr . Deep Drilled tube well etc Turn key basis under 10-10 T/Well in each Panchayat under State plan in Village of Saraikela- Kharsawan District. Group-6
Construction 50 Nos. of 125 mm dia x 115 mm dia x 70 Mtr . Deep Drilled tube well etc Turn key basis under 10-10 T/Well in each Panchayat under State plan in Village of Saraikela- Kharsawan District. Group-7
Tender for SOP to Reliance Jio Tower at Shelapaani by Providing Augmentation of 63 KVA, 22/0.4 KV Sub-Station into 100 KVA, 22/0.4 KV Sub-Station in Electrical Section Sheelghat under ESD HPSEBL, Jubbal. (TENDER ON TURN KEY BASIS).
Add. BP 2023-24 in EDD-I, Chandauli work plan of Rs. 07.50 cr. allocated for system strengthening work includes installation of add. converter and capacity increase, dilapidated ABC cable dilapidated wire installed on LT line. on semi turn-key basis.
Rate Contract for Creation of 25, 63, 100, 250, 400, 630 KVA Sub Station on 9 Mtr PCC Poles Under the jurisdiction of JPDCL Electric Division-I, Parade, Jammu for the financial year 2023-24 on partial Turn Key basis
The Work for Bifuracation of 11 KV Mawiya Feeder From 33/11 KV S/s Goithaha and Hukulganj Feeder From 33/11 KV S/s Sankul Under EE, UECD-II, Varanasi in Business Plan-2024-25 on semi turn key basis
Add. BP 2023-24 in EDD-III, Sakaldiha work plan of Rs. 07.50 cr. allocated for system strengthening work includes installation of add. converter and capacity increase, dilapidated ABC cable dilapidated wire installed on LT line on semi turn-key basis
Construction of 125/115 mm. Dia. with. 70m/90m/120m mtrs. Deep (Avg.) Drilled Tube Well etc. under D.W. and S. Division, No.-02, Dumka for the Year 2023-24 on Turn key basis. (Group No. - DT-SAR/90-2)
Establishment of additional distribution transformer in the works to be done under the work plan of Rs.20.00 cr. allocated for the work of system strengthening under additional business plan 2023-24 in EDD-I, Chandauli. on semi turn-key basis
Construction of 11 KV underground and overhead line, LT ABC and DT work for RFO-2 Allahabad, Bamrauli 4th line from track no. 831/12 to 833/19, Bamrauli, against Semi Turn Key Basis of Deposit work Under EUDD-Bamrauli, Prayagraj.
Installation, Conversion and Construction of New small Hatch Barge from Old Pump or Big Hatch Steel Barge at PARANPUR MADHAIPUR Major RLI Scheme on Turn Key Basis under Purbasthali I Block under Burdwan AM Division under Core Sector (2023 24) Program
The Work for Replacement of Damage condutcor by Dog cond., Replacement of Damage condutcor by ABC, laying of Additional ABC and Trolly Amounted T/F 630 KVA under EE, UECD-II, Varanasi in Business Plan-2019-20 on Turn-Key Basis
For the Work of 11 KV Line Construction/Strengthing, Increasing Capacity of Dist. T/F, Installation of New T/Fs and other associated works Head on Buisness Plan 2023-24 GREESHM RITU on Semi Turn Key Basis under EDC-1 Agra.
Survey, Planning, Designing, Drawing and Construction of 0.5 MLD STP based on SBR Technology and Sewage Network from the Colony to STP including Operation and Maintenance for 4 years at Katkona Sub-Area of Baikunthpur Area on TURN-KEY basis
Revival of Defunct IM II hand pumps by Changing of 32 mm dia. Rotten Riser Pipe) etc. in jurisdiction of D.W and S. Division No. 2, Dumka for the year 2023-24 (ON TURN KEY BASIS). (Group No. RRP-RAM-1)
Construction of 125/115 mm. Dia. with. 70m/90m/120m mtrs. Deep (Avg.) Drilled Tube Well etc. under D.W. and S. Division, No.-02, Dumka for the Year 2023-24 on Turn key basis. (Group No. - DT-JAR/70-1)
Work for Line Shifting and other associated work under Semi Turn Key Basis during road wending of Bullet Chauraha to Circiut House Fatehpur (33 KV, 11 KV and LT Lines, transformers and other associated work) under jurisdiction of EDD-I Fatehpur
Tender for SOP to Reliance Jio Tower at Purag by Providing Augmentation of 100 KVA, 22/0.4 KV Sub-Station to 250 KVA, 22/0.4 KV Sub-Station in Electrical Section Purag under ESD Kiari. (TENDER ON TURN KEY BASIS).
BOQ for Changing of 157 nos Tubewells of 32 mm dia. Rotten Riser Pipe, Connecting rod, C.I Cylinder etc. on turn key basis in different Blocks of Sonua Sub Division for the year 2025-26 under D. W. S. Division, Chakradharpur.
BOQ for Changing of 130 nos Tubewells of 32 mm dia. Rotten Riser Pipe, Connecting rod, C.I Cylinder etc. on turn key basis in different Blocks of Manoharpur Sub Division for the year 2025-26 under D. W. S. Division, Chakradharpur.
CONSTRUCTION AND INSTALLATION ( INCLUDING SUPPLY AND DELIVERY OF ALL RELATED MATERIALS , ALL-IN-ONE WORKS ON TURN KEY BASIS ) OF SUNUR (PURBA) SOLAR MINI RLI SCHEME IN BHATAR BLOCK UNDER BURDWAN(A-M) SUB DIVISION UNDER BURDWAN (A-M) DIVISION
Revival of Defunct IM II hand pumps by Changing of 32 mm dia. Rotten Riser Pipe) etc. in jurisdiction of D.W and S. Division No. 2, Dumka for the year 2023-24 (ON TURN KEY BASIS). (Group No. RRP-MAS-1)
Construction of 125/115 mm. Dia. with. 70m/90m/120m mtrs. Deep (Avg.) Drilled Tube Well etc. under D.W. and S. Division, No.-02, Dumka for the Year 2023-24 on Turn key basis. (Group No. - DT-JAM/90-1)
Supply, Erection, Testing, Commissioning for Creation of 250 KVA Sub-Station alongwith Laying of HT Line and Laying of LT Line under JJM Scheme at WSS Dhan under the Jurisdiction of Electric Division Div-I (JPDCL) Jammu on Turn Key Basis
Construction of 125/115 mm. Dia. with. 70m/90m/120m mtrs. Deep (Avg.) Drilled Tube Well etc. under D.W. and S. Division, No.-02, Dumka for the Year 2023-24 on Turn key basis. (Group No. - DT-DUM/90-2)
DESIGN, DETAILED ENGINEERING, MANUFACTURING, SUPPLY OF 132 KV 630SQMM SINGLE CORE COPPER CONDUCTOR CORRUGATED ALUMINIUM SHEATHED XLPE CABLE WITH ACCESSORIES CABLE LAYING 132 KV SOLAR BAY ON TURN-KEY BASIS AT 400 KV GIS S/S RASARA UNDER ETD, BALLIA
Construction 50 Nos. of 125 mm dia x 115 mm dia x 70 Mtr . Deep Drilled tube well etc Turn key basis under 10-10 T/Well in each Panchayat under State plan in Village of Saraikela- Kharsawan District. Group-17
CONSTRUCTION AND INSTALLATION ( INCLUDING SUPPLY AND DELIVERY OF ALL RELATED MATERIALS , ALL-IN-ONE WORKS ON TURN KEY BASIS ) OF SUNUR (PASCHIM) SOLAR MINI RLI SCHEME IN BHATAR BLOCK UNDER BURDWAN(A-M) SUB DIVISION UNDER BURDWAN (A-M) DIVISION
Installation, Conversion and Construction of New small Hatch Barge from Old Pump or Big Hatch Steel Barge at DHOBA I Major RLI Scheme on Turn Key Basis under Purbasthali I Block under Burdwan AM Division under Core Sector (2023 24) Programme.
Construction 50 Nos. of 125 mm dia x 115 mm dia x 70 Mtr . Deep Drilled tube well etc Turn key basis under 10-10 T/Well in each Panchayat under State plan in Village of Saraikela- Kharsawan District. Group-14
Rate contract for thickening of existing 11KV lines from Squirrel to Weasel, Weasel to Rabbit, Rabbit to Dog on Turn Key Basis at various locations within the jurisdiction of Electric Division-II Gandhi Nagar Jammu during the FY 2021-22
Supply, Erection, Testing Commissioning for Creation of 63 KVA Sub-Station with prodigy meter at Chak Chibba and Laying of HT Line at Chak Chibba Nursery, Nagrota Under the jurisdiction of Electric Division Div.-I (JPDCL) Jammu. On Turn Key basis
Construction 50 Nos. of 125 mm dia x 115 mm dia x 70 Mtr . Deep Drilled tube well etc Turn key basis under 10-10 T/Well in each Panchayat under State plan in Village of Saraikela- Kharsawan District. Group-3
The work of installation of Additional converter and capacity enhancement is among the work plan of Rs. 20.00 cr. allocated for the work of system strengthening under the Additional BP 2023-24 in EDD-II, Mughalsarai. on Semi-Turn-Key Basis
Construction and Installation (Including Supply and Delivery of all related materials, ALL IN ONE WORKS ON TURN KEY BASIS) of SIDHPUR_I SOLAR MINI RLI Scheme in JAMURIA Block under Durgapur AE Sub Divn under Burdwan AM Division under RIDF XXIX Prog.
Renovation of WTA at AHIRA Govt Owned and Operated Major RLI Scheme on Turn Key Basis under Memari II Block under Memari (AM) Sub Division under Burdwan (AM) Division under Core Sector (2023 2024) Programme in the District of Purba Bardhaman.
Construction of Buildingless Sub-Health Centres at various places of Assam under PM-ABHIM for FY 2022-23 48 nos. of Buildingless Sub-health Centres under NHM Assam on TURN KEY BASIS , At BADONG SC in West Karbi Anglong District
Supply, Erection, Testing, Commissioning for Creation of 25 KVA Sub-Station alongwith HT/LT Line and Isolation point for Bailing Machine and Shredders in PWMU at Dansal under the Jurisdiction of Electric Division Div-I JPDCL Jammu on Turn Key Basis
Construction 50 Nos. of 125 mm dia x 115 mm dia x 70 Mtr . Deep Drilled tube well etc Turn key basis under 10-10 T/Well in each Panchayat under State plan in Village of Saraikela- Kharsawan District. Group-12
Construction 50 Nos. of 125 mm dia x 115 mm dia x 70 Mtr . Deep Drilled tube well etc Turn key basis under 10-10 T/Well in each Panchayat under State plan in Village of Saraikela- Kharsawan District. Group-4
Construction 50 Nos. of 125 mm dia x 115 mm dia x 90 Mtr . Deep Drilled tube well etc Turn key basis under 10-10 T/Well in each Panchayat under State plan in Village of Saraikela- Kharsawan District. Group-1
Construction of 125/115 mm. Dia. with. 70m/90m/120m mtrs. Deep (Avg.) Drilled Tube Well etc. under D.W. and S. Division, No.-02, Dumka for the Year 2023-24 on Turn key basis. (Group No. - DT-JAR/90-2)
Construction of 125/115 mm. Dia. with. 70m/90m/120m mtrs. Deep (Avg.) Drilled Tube Well etc. under D.W. and S. Division, No.-02, Dumka for the Year 2023-24 on Turn key basis. (Group No. - EDT-MAS/120-1)
Rate contract for SITC of 1 km 11KV line on 9mtrs PCC Poles with ACSR Weasel conductor along with creation of Isolation Point on Turn Key Basis at various locations within the jurisdiction of ED-II Jammu during FY2021-22
Construction 50 Nos. of 125 mm dia x 115 mm dia x 70 Mtr . Deep Drilled tube well etc Turn key basis under 10-10 T/Well in each Panchayat under State plan in Village of Saraikela- Kharsawan District. Group-5
Construction of 125/115 mm. Dia. with. 70m/90m/120m mtrs. Deep (Avg.) Drilled Tube Well etc. under D.W. and S. Division, No.-02, Dumka for the Year 2023-24 on Turn key basis. (Group No. - DT-JAM/90-2)
Providing Lift water supply scheme for Kakira Kasba Gahar Parchhore and other multi villages rural piped water supply scheme for part of Block Bhattiyat in District Chamba HP in single package on Turn key job basis including trial, testing run defec
Supply, Erection, Testing, Commissioning for Creation of 100 KVA sub-station alongwith Laying of HT Line on 9 mtr ST Pole for Gujjar Bakerwal Girls Hostel, Jammu under the Jurisdiction of Electric Division Div-I JPDCL Jammu on Turn Key Basis